HomeMy WebLinkAbout07/22/2004 Agenda & Packet Park and Recreation Committee Meeting Agenda
July 22, 2004
6:30 P.M.
1. Roll Call
2. Approval of minutes from the May 27, 2004 meeting.
NOTE: There was not a quorum at the June 24, 2004 Meeting date so no meeting was held.
A special meeting was scheduled and held on July 8, 2004. The only subject discussed was the Greenfield
Park Plaground Equipment Replacement Project.
The Commissioners present were: Kunz, Kunza, Long, Edmond, Silvis
The Commissioner Kunz made a motion to recommend dedication of$40,000 from the City Park
dedication Fund in 2005 for the Greenfield Park Playground Equipment Replacement Project. This was
seconded by Silvis and passed unanimously.
3. Unfinished Business:
a) Greenfield Park Play Equipment - The motion to recommend dedication of$40,000 from the City
Park dedication Fund in 2005 for the Greenfield Park Playground Equipment Replacement Project
is being presented to the City Council on Monday July 26, 2004. Attached is the Staff report.
b) Groveland Park Building Replacement. —On May 10, 2004, the City Council approved Resolution
No. 6203 Authorizing the Preparation of a Site Plan, Construction Plans, Specifications, and
Consultant Selection for the Groveland Park Shelter Building Replacement Project. . TKDA has
submitted a Letter Agreement, which included a cost estimate of$19,600 for completing the plans
specifications. This Letter Agreement was presented to the City Council on June 28th for approval.
The City Council rejected it. On July 12, 2004, the City Council approved a resolution to rescind
Resolution No. 6203 and authorize the preparation of a Request For Proposal (RFP) for work
associated with the preparation of a site plan, construction plans, and specifications for the
Groveland Park Building Replacement Project. The RFP is scheduled to be approved by City
Council on August 9, 2004.
c) Facility Guide Update— Steve and Desaree are meeting on July 6th to develop the layout of the
Guide. A draft will be distributed at the August 26th meeting.
d) Park Usage Data Collection Sheets—any up dates?
e) Community Survey—This was included in the May/June addition of the Mounds View Matters. As
of 6/23/2004 a total of 26 surveys were filled out and returned to the City. The deadline for
submittal is September 3, 2004. The Commission requested to review the surveys received so far at
the next meeting. These are attached. The City will be publishing a reminder in the newspaper
(Bulletin)to fill these out.
f) YMCA Committee Update
g) Lakeside Lions Park Parking Lot—This was included in the 2003 Street Improvement Project as a
bid alternate. Bids were received for this project. The low bid was $99,965.25. The engineer's
estimate was $104,750. This was awarded by City County on June 14, 2004. The reconstructive
work on the parking lot is estimated to begin by mid August.
h) Lakeside Fishing Pier—The DNR is developing the necessary agreements to be signed by Spring
Lake Park and Mounds View. The installation of the pier is approximately scheduled for late July.
6. New Business:
a)
7. Commissioner/Staff Reports
a)
8. Request for future agenda items/other business
Possible Items for August 26th Agenda
XTEM
Park and Recreation Commission Meeting Minutes
May 27, 2004
Meeting Called to order:
1. Roll Call:
Present: Kroeger, Kunz, Kunza, Edmond, Aukee, Steeves, McIntyre,
Dazenski, Lee
Absent: Long, Silvis
2. Swore in new commission member, Dale Aukee
3. Approval of April 22, 2004 Meeting Minutes:
Motion to approve:
2nd:
Motion passed unanimously
4. Rick Wriskey, the City Forester,provided a forestry update for the
Commissioners.
• This is the 23`d year of Mounds View being a Tree City
• Drought concerns; two-lined Chestnut Borer are starting to affect
declining Oak Trees Look similar to Oak Wilt.
• Oak Wilt—lost 36 tree. Trenching is about 90% effective in containing
oak wilt.
• Planted 55 new trees last year./The City has a"No net loss of tree policy".
Planted Sugar Maple, American Linden, Hack berry...
• This Arbor Day swamp white oaks were planted in Groveland park to
replace the locus trees that were removed.
• Planting of trees along County Road H2 will begin in a few weeks. There
will be about 30 treesp lanted on a contractual
basis.
• The City received a GIS/GPS Tree Inventory Grant. This will allow a
database and layer in ArcView to be created to enable better tree
management within City owned property. This was a matching fund
grant.
• Emerald Ask Borer; preys on ask trees. Rick provided a handout
• Discussed storm damage from 5/26/2004
• Boulevard trees are typically 12 to 15 feet from the curb line.
5. Unfinished Business:
a) Greenfield Park Play Equipment - request from residents to have the
equipment upgraded now.
• Steve met with a neighborhood group to develop a playground
equipment plan for Greenfield Park
• Steve presented a proposed plan to the Commissioners.
1
• The proposed playground is 76' X 85'. It would have wood fiberfill
base.
• The Commission asked, "to what standard will it be built to?" The
equipment will come with a compliance letter—it will comply will all
of the industries standards as of that day.
• The Commission asked about maintenance issues. Steve stated that
replacement parts can be found up until about 8 years (industry
standard).
• This project would need to go through the competitive bidding
process.
• As per City Legal Counsel, Park Donations are most likely tax
deductible. However, one must always consult their tax advisor for
their particular tax situation.
• NEXT STEPS:
o Review other vendors products
o Commission reviews park long range financial plan
o Investigate donations
o Finalize the plan
o Commission recommend approval of the plan
o City Council approves the plan
o Advertise of bids
o Bids received
o Council awards contract/purchase
o Product is ordered
o Product is installed
b) Groveland Park Building Replacement.
• This issue has been placed on the May 3, 2004 City Council Work
Session Agenda.
• On May 10, 2004, the City Council approved Resolution No. 6203
Authorizing the Preparation of a Site Plan, Construction Plans,
Specifications, and Consultant Selection for the Groveland Park
Shelter Building Replacement Project.
• Steve is working with the consultant TKDA to develop the site and
construction plans.
• Steve and TKDA have reviewed the site, reviewed Hillview plans,
discussed proposed changed from the Hillview plan.
• The preferred site will be very close to the existing site
• TKDA will submit a letter proposal with step and cost estimates
• Steve will develop cost to maintain a building of this size/nature
• Commissioners requested a cost comparison of Hillview maintenance
versus current Groveland maintenance (assuming Groveland building
was staying)—do a 5 year projection cost comparison
• Develop a cost break down for Hillview
c) Facility Guide Update
• The text part is essentially complete
2
• Steve has some pictures to add to the guide
• Remove the fee structure from the Guide—(since it changes)
d) Park Usage Data Collection Sheets
• No new news
• Seasonal Parks personnel are now working and may be able to help fill
out the observation sheets, but this is only daytime (mid-day) hours.
e) Community Survey
• This was included in the May/June addition of the Mounds View
Matters. As of 5/25/2004
• A total of 19 surveys were filled out and returned to the City.
• The deadline for submittal is September 3, 2004.
• The Commission requested to review the surveys received so far at the
next meeting.
f) YMCA Committee Update
• The committee discussed the contract at their last meeting—but not to
any great extent.
• Looked at park usage fees
• Discussed possible visa payment option—City is looking into the cost
of getting a printer
• The YMCA is promoting LaCross
• Discussed the January through March Program report.
g) Lakeside Lions Park Parking Lot
• This was included in the 2003 Street Improvement Project as a bid
alternate.
• Bids were received for this project.
• The low bid was $99,965.25. The engineer's estimate was $104,750.
• Should the City Councils of Mound View and Spring Lake Park wish
to proceed with the parking lot project, they will need to award it to
the contractor.
• The bid award was originally scheduled for May 24, 2004. However,
due to issues with the Rice Creek Watershed District regarding the
2003 Street Improvement Project, the bid award was continued until
June 14, 2004.
• The joint powers agreement with the City of Spring Lake Park was
revised to include the Lakeside Lions Park parking Lot. The City
Council approved this revision on May, 10, 2004.
• Commissioners asked if there was going to be a conflict with
construction and use of the park. There will be some disruption,
however, it will be minimal. Then lot will always be usable on
weekends and evenings.
h) Lakeside Fishing Pier
3
• The DNR is developing the necessary agreements to be signed by
Spring Lake Park and Mounds View.
• Staff will review the status/installation schedule with Spring lake
Park and report at the next meeting
6. New Business:
a)
7. Commissioner/Staff Reports
a) Commissioner Kunza had a question regarding the trailway on the north side
of County Road 10 at County Road H2. She question way there was no
pedestrian landing/continuation of the trailway. Lee responded by stating that
there several future project that willl address this situation. First is the trailway
plan for the north side of County Road 10. Second is the City comprehensive
plan from this trailway to continue to the east. However, this will most likely
be done with a trailway project along the north side of County Road 10. And
finally as per the County Road 10 Redevelopment plan,this intersection will
be upgraded including pedestrian features and the geometric changed.
8. Request for future agenda items/other business
Possible Items for June 24th Agenda
• None offer/discussed
Announced that the Next regular scheduled meeting will be June 24, 2004.
Motion to adjourn: Long
2°a: Kunza
Motion passed unanimously
Respectfully submitted by:
Greg Lee
4
'TEA, 3a
Item No. 10B
Meeting Date: July 26, 2004
Type of Business: CB
WK: Work Session;PH:Public Hearing;
CA: Consent Agenda; CB: Council Business
City Administrator Review
City of Mounds View Staff Report
To: Honorable Mayor and City Council
From: Greg Lee, Director of Public Works
Item Title/Subject: Resolution 6313 Dedicating Park Dedication Funds
in the 2005 Budget for the Greenfield Park
Playground Equipment Replacement Project
Background:
In the fall of 2003 the Parks and Recreation Commission preformed a "Needs
Analysis" for all City parks. Based on the analysis, the Commissioners developed
a list of desired changes and improvements to the City parks system. This list
was divided into three components; Short Term Items (items that could be done
without budgeting), Intermediate Items (items that needed to be budgeted for)
and Long Term Items (item that were capital expenditures and several years
out).
During this process a neighborhood group requested that something be done
with the Greenfield Park play equipment. They requested at minimum, new play
equipment for smaller children be added to Greenfield Park.
As part of the "Needs Analysis" the Commissioners recommended an
expenditure of $5,000 in 2005 to add new additional play equipment for smaller
children. The Commissioners also recommended that all of the playground
equipment at Greenfield Park be replaced in 2010 at an estimated cost of
$50,000 to $55,000, plus the cost of fiberfill, which was estimated to cost an
additional $8,000.
On April 22, 2004, the neighborhood group for Greenfield Park requested to
address the Parks and Recreation Commission. The neighborhood group
requested that the playground equipment be entirely replaced at this time. They
stated that the Greenfield Play equipment does not meet consumer product
safety and League of Minnesota Cities requirements. They also stated that
Greenfield Park play equipment is the oldest play equipment in the City and
should be replaced.
The Commissioners requested that equipment design be put together for
Greenfield Park. The Parks Supervisor, Steve Dazenski, worked with the
neighborhood group to create plans.
The plans were presented to the Commission on May 27, 2004. The proposed
playground would be 76' X 85'. It would have wood fiberfill base. The estimated
cost was $60,000 plus $8,000 for the wood fiberfill base. The Commissioners
requested additional proposals from other vendors.
The Park and Recreation Commission did not have a quorum on June 24, 2004;
this prompted the calling of a special meeting for July 8, 2004 to specifically
discuss the Greenfield Park Play Equipment Replacement.
On July 8, 2004, the Commissioners meet with the neighborhood group to
discuss the Greenfield Park Play Equipment. The Commissioners made a motion
to recommend that the City dedicate funds in the amount of $40,000 from the
City's Park Dedication Fund in the 2005 Budget for the Greenfield Park
Playground Equipment Replacement Project.
Discussion:
The total cost of the Greenfield Playground Equipment Replacement Project as
proposed is $60,000 for the equipment and $8,000 for the wood fiberfill and
playground border. The City routinely replaces wood fiberfill and budgets for it
annually. The current draft 2005 Budget has $1,500 for wood fiberfill. Should the
City Council wish to proceed with this project, Staff recommends that an
additional $8,000 be budgeted for in 2005 from the Park Dedication and not from
the Parks budget.
The difference in funds from what the Commissioners are recommending and the
estimated costs could be derived from donations. The neighborhood group has
submitted a donation request letter that they intend to send out to all of the
businesses in Mounds View (see attachment).
The neighborhood group has requested that the City print up these donation
request letters, provide envelopes with the City logo, and provide postage. The
estimated cost is summarized as follows:
Printing Costs $340.00
Envelopes (400) $ 8.00
Postages $148.00
TOTAL $496.00
*excludes Staff time.
Recommendation:
It has been recommended by the Parks and Recreation Commission that the City
Council approve a resolution to dedicate Park Dedication Funds in the 2005
Budget for the Greenfield Park Playground Equipment Replacement Project.
Respectfully Submitted,
Greg Lee, Director of Public Works
RESOLUTION NO. 6313
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
DEDICATING PARK DEDICATION FUNDS IN THE 2005 BUDGET FOR THE
GREENFIELD PARK PLAYGROUND EQUIPMENT REPLACEMENT
PROJECT
WHEREAS, on April 22, 2004, a neighborhood group requested that the
Parks and Recreation Commission recommend that the playground equipment at
Greenfield Park be entirely replaced at this time; and
WHEREAS, on July 8, 2004, the Commissioners made a motion to
recommend that the City dedicate funds in the amount of $40,000 from the City's
Park Dedication Fund in the 2005 Budget for the Greenfield Park Playground
Equipment Replacement Project; and
WHEREAS, should the City Council wish to proceed with this project, Staff
recommends that an additional $8,000 for fiberfill and border be budgeted for in
2005 from the Park Dedication and not from the Parks budget; and
WHEREAS, the neighborhood group has requested that the City print up
donation request letters, provide envelopes with the City logo, and provide
postage.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Mounds View, Ramsey County, Minnesota as follows:
1. Dedicates Park Dedication Funds in the 2005 Budget for the
Greenfield Park Playground Equipment Replacement Project.
2. Said dedication will be in the amount of $48,000 which will include
fiberfill and border.
3. The City will print up the requested donation request letters, provide
envelopes with the City logo, and provide postage, at an estimated
cost of$500 (excluding Staff time).
4. Donations raised by the neighborhood group will be applied entirely
to the Greenfield Park Playground Equipment Replacement Project.
Adopted this 26th day of July 2004.
(ATTEST)
Jerry Linke, Mayor
(SEAL)
Kurt Ulrich, City Administrator
July 30, 2004
Dear Mounds View area business or organization,
We are writing to you looking for financial support to replace the playground equipment at
Greenfield Park located on the north side of Mounds View at the corner of Hillview Road and
Knoll Drive. This equipment was installed in the early 1980s and is the oldest park in Mounds
View.
When this park was built, it met the guidelines for safety according to the United States
Consumer Product Safety Commission(CPSC)at that time. However the CPSC updated those
guidelines in the early 1990s and the playground at Greenfield Park has many areas that no longer
meet these safety recommendations. There are several areas on the equipment that are broken
and cannot be replaced because it is so old that parts are no longer available. It cannot be adjusted
for safety because that would void the company's liability/warranty if the equipment were altered.
On the reverse side you will find a photo of the tentative playground proposal. Swings, a
hydraulic speed control merry-go-round, and an age-appropriate area for toddlers are also
included in the proposal. This will provide the community with a playground of comparable size
to what is currently in place, and meet CPSC recommendations for safety.
The city of Mounds View has a Park Dedication Fund which is financed with monies collected
from development and redevelopment in the community. Mounds View is nearly fully
developed. Therefore the amount of money available in the Park Dedication Fund is limited. The
Mounds View City Council has agreed to budget$40,000 of the $70,000 cost for the project.
We are asking community businesses and organizations to contribute to the remaining cost of the
project so it can be installed in the spring of 2005. 100% of your donation will go directly to the
playground. Consult with your tax preparer for taxable deductions. Checks should be made to
the"City of Mounds View."Please specify your donation to go toward the"Greenfield
Playground." A receipt for your contribution can be returned upon request. In order for us to
achieve our goal,we will need your contribution by November 1, 2004 sent to:
Charles Hansen, Finance Director
City of Mounds View
2401 Highway 10
Mounds View,MN 55112-1499
If you have any questions about this project,please contact any of the individuals below.
Thank you for keeping our children safe with your contribution.
Sincerely,
Greenfield Park area residents,
Cindy Palm Kendra Miller Colleen Johnson Shannon Mildenberger
763-783-5769 763-780-5467 763-780-4197 763-780-4449
„Y
et
Ott. R
3 --.. * +
i.
eta i r.�.W.,,. H �� d h�!r'�j` 3 a /i
�
t
c �
Y
,
w$'�. u
4.4":0
n
^ .R q ray -i$ ',,„-Y,,,,.��:.`�4.,
-- r'''''''.;:,•, ,;•,i,i4,.-All',,,, ,
arm It
,pr
IV " 'wee•
11411
w
f, �� N
:r1E.
Item No. 9C
Meeting Date: July 12, 2004
Type of Business: CA
WK: Work Session;PH:Public Hearing;
CA: Consent Agenda; CB: Council Business
City Administrator Review
City of Mounds View Staff Report
To: Honorable Mayor and City Council
From: Greg Lee, Director of Public Works
Item Title/Subject: Resolution No. 6300 Rescinding Resolution No. 6203
and Authorizing the Preparation of a Request For
Proposal (RFP) for Work Associated with the
Preparation of a Site Plan, Construction Plans, and
Specifications for the Groveland Park Building
Replacement Project
Background:
On May 10, 2004 the City Council approved Resolution No. 6203 which
authorized the preparation of a site plan, construction plans, specifications, and
consultant selection for the Groveland Park Building Replacement Project.
In addition, the City Council authorized "the execution of a letter of agreement
with TKDA for the preparation of the site plans, construction plans, specifications,
and any other planning phase aspects of this project".
On June 21, 2004, the City's engineering firm of TKDA submitted a Letter of
Agreement with a list of the scope of work to be provided.
On June 28, 2004, Staff presented Resolution No. 6292 approving and
authorizing the execution of a Letter of Agreement with TKDA for the Groveland
Park Building Replacement Project. The estimated cost of the proposed work
was $19,600.
Discussion:
At the June 28, 2004 City Council meeting, the Council voiced an objection to the
estimated costs submitted by TKDA for the proposed work for the Groveland
Park Building replacement plans. The City Council did not approve Resolution
No. 6292 and gave Staff direction to publish a Request For Proposal (RFP) for
other engineering and architectural firms.
Since Resolution No. 6203 authorized the preparation of a site plan, construction
plans, specifications, and selected TKDA as the consultant for the Groveland
Park Shelter Building Replacement Project, this Resolution will need to be
rescinded.
Recommendation:
It is recommended the City Council approve a resolution to rescind Resolution
No. 6203 and authorize the preparation of a Request For Proposal (RFP) for
work associated with the preparation of a site plan, construction plans, and
specifications for the Groveland Park Building Replacement Project.
Respectfully Submitted,
Greg Lee, Director of Public Works
RESOLUTION NO. 6300
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESCINDING RESOLUTION NO. 6203 AND AUTHORIZING THE
PREPARATION OF A REQUEST FOR PROPOSAL (RFP) FOR WORK
ASSOCIATED WITH THE PREPARATION OF A SITE PLAN,
CONSTRUCTION PLANS, AND SPECIFICATIONS FOR THE GROVELAND
PARK BUILDING REPLACEMENT PROJECT
WHEREAS, on May 10, 2004 the City Council approved Resolution No.
6203 which authorized the preparation of a site plan, construction plans,
specifications, and consultant selection for the Groveland Park Building
Replacement Project; and
WHEREAS, in addition, the City Council authorized "the execution of a
letter of agreement with TKDA for the preparation of the site plans, construction
plans, specifications, and any other planning phase aspects of this project"; and
WHEREAS, on June 21, 2004, the City's engineering firm of TKDA
submitted a Letter of Agreement with a list of the scope of work to be provided;
and
WHEREAS, at the June 28, 2004 City Council meeting, the Council voiced
an objection to the estimated costs submitted by TKDA for the proposed work for
the Groveland Park Building replacement plans; and
WHEREAS, the City Council did not approve Resolution No. 6292 and
gave Staff direction to publish a Request For Proposal (RFP) for other
engineering and architectural firms.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Mounds View, Ramsey County, Minnesota as follows:
1. Rescinds Resolution No. 6203 in its entirety.
2. Authorizes and direct Staff to develop a request for proposal (RFP)
for work associated with the preparation of a site plan, construction
plans, and specifications for the Groveland Park Building
Replacement Project.
Adopted this 12th day of July 2004.
(ATTEST)
Jerry Linke, Mayor
(SEAL)
Kurt Ulrich, City Administrator
ITrin
A
Park Update 7-22-2004
Beetle Report
Beetles: Although I have not been a huge fan I will give you the information that I know : The
Beetles stopped recording as a group in 1969 John Lennon was fatally shot in 1981 George
Harrison died of cancer in 2003....Paul McCartney having lost his first wife Linda to cancer re-
married a one legged woman and became a father last year Ringo Starr sang with a group
called the Traveling Wilberrys and still makes solo appearances. He married Barbara Bach in the
80s(not to be confused to Katherine Bach who played Daisy on the Dukes of Hazzard) You could
try WWW.Beetles.Com....Steve
The Correct Beetle Report
Staff has been in contact with the Department of Natural Resources for the past two years
regarding the purple loosestrife that is growing in the city. Because most of the loosestrife is
growing close to water or wetland area staff checked into alternatives other than spraying of
herbicides. There is a beetle whose goal in life is to eradicate the purple loosestrife plant thru
consumption. The adult beetles eat the leaves and the larva eat the tops and flowers so the plant
cannot spread its pollen. This theory was brought up at a Park and Rec. mtg. years ago by staff
and now we are seeing it take place. Staff met with the D.N.R. at some of our sites and observed
a colony of both adult and larva doing their job as predicted. This question may come up, "What
happens to all those beetles?" Lady bird beetles or commonly called Lady Bugs eat them! The
D.N.R. would like to harvest beetles at our sites next spring because of their accessibility.
Greenfield Playground Equipment Repairs
The playground equipment at Greenfield park has been repaired by cutting off of some tube and
slide ends and rotating the tubes and moving the footings to accommodate the revisions.
NRM 8.7.13 - FISHING PIER SIGNS
n n
A MADISON LAKE FISHING PIER 3" letters 2" x 12"
•
- A COOPERATIVE PROJECT BETWEEN 1 1/2" letters
CITY OF MADISON LAKE 2" letters 2" x 12"
V MINNESOTA DEPARTMENT OF NATURALRESOURCES 1 1/2" letters
CENTER ALL TYPE
7' -0" min
Number of Letters Length of Sign Board feet of Board feet of
on Top Line Including Margin Allowance one credit sign two credits
1-22 6' 10" 27.34 34.16
23-26 7' 0" 28 35
Over 28 letters top line will be two lines
Call DNR Sign Shop at 218.327.4447 for current board foot price.