Loading...
HomeMy WebLinkAbout09/23/2004 Agenda & Packet Park and Recreation Committee Meeting Agenda September 23, 2004 6:30 P.M. 1. Roll Call 2. Approval of minutes from the August 26, 2004 meeting. 3. Unfinished Business: a) Greenfield Park Play Equipment - On July 26, 2004,the City Council approved the dedication of $48,000 to the Greenfield Park Playground Equipment Project. The neighborhood group has since received a donation in the amount of$12,500 from the Bethlehem Baptist Church(see attached email dated 9/7/2004). Staff will be contacting Ms. Palm to determine the final amount raised and whether or not the neighborhood group wishes to approach the Park and Recreation Commission and City Council for additional dedication of funds. This information will be presented at the October 28, 2004 Park and Recreation Meeting. b) Groveland Park Building Replacement. —On August 23, 2004, the City Council approved a Request For Proposal (RFP) for work associated with the preparation of a site plan, construction plans, and specifications for the Groveland Park Building Replacement Project. This was advertised as well as directly sent to several engineering and architectural firms in the City's consultant pool. The deadline for submittal is September 24, 2004. c) Facility Guide Update—This was presented at the August 26, 2004 meeting. There are several changes needed. Steve and Desaree will work to address the recommended changes. A draft will be distributed at the October 28th meeting. d) Park Usage Data Collection Sheets—The data sheets were collected at the August 26th meeting. How should the data be summarized? Staff can summarize this data—similar to the summation of the Community Survey. e) Community Survey—The deadline for submittal is September 3, 2004. A total of 37 surveys were filled out and returned to the City. Attached is a summary of the survey results. f) YMCA Committee Update—A meeting was held on September 13, 2004. A verbal update will be provided. g) Lakeside Lions Park Parking Lot—The concrete curbing and base course of bituminous have been installed. The plans originally called for seeding the disturbed areas around the perimeter, however, the City of Spring Lake Park has requested and approved for this area to be sodded. The installation of the sod is anticipated to be completed by September 24, 2004. The wear course of bituminous is scheduled for Friday, September 27th. The striping of the parking lot will occur a few weeks later. h) Lakeside Fishing Pier—Due to workload delays, the DNR has rescheduled the installation of the pier for spring of 2005. The wording of the sign has been determined—see attached email dated 8- 30-2004. 4. New Business: a) 2004 Park Needs Analysis—Start review process. b) Oakwood Park—Proceed with any re-development? c) Other Items? 5. Commissioner/Staff Reports a) Hillview Park Building Vandalism. See attached email dated 9-15-2004 b) Silver View Sedimentation/Water Quality Pond Construction Update 6. Request for future agenda items/other business Possible Items for October 28th Agenda Parks Needs Analysis Annual Review 2 • MINUTES FROM PARK AND REC. MEETING AUGUST 26TH 1. Roll Call: Present: Kunza, Silvas, Kroeger, Long, Aukee, Dazenski, McIntyre and Kunz came a little late. Absent: Lee, Steeves and Edmond 2. Approval of minutes from July 22, meeting. Corrections: Page 2 middle of page: Parks and d Recreation Commission will review and perhaps revise. Bottom of page: The RFP will be sent to 3. Unfinished business: a) Clarification $40,000 on equipment, $8,000 on border and fibar fill. Open business=How is the neighborhood committee doing on fund Raising? (There was no answer on this, see attached E-mail from Kurt) Dazenski stated that we will have to make plans with supplier soon so that We could install in the spring of 2005. b) City is sending RFP's to other engineering firms because TKDA was in the cities opinion too high as we own the prints and there was just some minor modifications required to make the shelter into what the parks need to have for a wider range of uses. We advertised in a construction bulletin and the Brighten Bulletin. Deadline for RFPs is September 24, 2004. c) Changes to facility guide: Add Greenfield and Lambert Number of people park shelter can accommodate Make map clearer, include park names and locations. Show trails, pathways, and proposed pathways and make up (blacktop or aggregate) Community Center information (expand) Possibly increase size of the paper so that more info. Can be included. Put in less for Golf Course and more for MVCC. Include date that the brochure was created. Possibly just average the depths of softball fields Park rental info. Remove fees and install deposit and fees apply. What budget is the brochure coming out of? " Park Dedication Budget" We should use the old layout for the format, "just update the info." d) Kunza asked if there was staff available to collect data? It was suggested That Dazenski collect the sheets and the Commission would decide what to with the data, how it should be summarized. e) Kroeger made a format for survey and will start sorting data. f) There was not a meeting Nothing to report g) What is the completion date? Approx. 2 weeks...Status? The surface and bumpers have been removed and grading has been started. h) Fishing pier will be delayed till next spring because of Minn. Cons back log. The DNR will be supervising the project. 4 a) Dazenski gave a wonderful report on what has been done off the Needs Analysis List. b) Dazenski with the aid of an aerial photo pointed out that we could make a usable but small soccer field on the Oakwood Park area. It would require elevation corrections for run off and level playing surface but it was explained that materials could be secure at low or no cost to the city. c) No other items discussed. 5 a) Porta potty has been moved to the backstop area. b) Volleyball courts: Dazenski explained that the timbers are used to contain the sand and not for boundaries. There is rope that designates the boundaries. c) Sedimentation pond: Dazenski explained that the pond had been dug out and that the engineers would have to approve final grade. The weir and culvert will be installed sometime in the next two weeks as we need to get the seed and mulch in as soon as possible. • Purple Loostrife update: We did not see any blooming on the east end of the pond and that is a very good sign that the beetles did their job! • The DNR would like to harvest beetles from our sites next spring. 3A Lee, Greg • From: Backman, Aaron Sent: Tuesday, September 07, 2004 10:02 AM To: Lee, Greg Subject: Grants for Greenfield Park Playground Equipment Greg: The check provided by BBC last week totalled $12,500 (instead of$10,000). It is separate from the $25,000. Aaron Original Message From: Lee,Greg Sent: Tuesday, September 07, 2004 9:30 AM To: Backman,Aaron Cc: Dazenski,Steve; Ericson,Jim; Hansen,Charlie; Ulrich, Kurt Subject: RE: Grants for Greenfield Park Playground Equipment If the$10,000 is truley a donation, and not part of the required $25,000 BBC is required as part of their park dedication, then BBC can donate it to the Greenfield Park Play Equipment Replacement Project. (although it would be nice if they asked the City where it would be best spent) However, if the $10,000 is part of this years$25,000 Park Dedication Fund from BBC, it MUST be deposited into the City's Park Dedication Fund. The Park and Recreation Commission will recommend, and the City Council will vote on how it would be utilized. Aaron, what is the status of this? Greg Original Message From: Backman,Aaron Sent: Monday,August 30, 2004 9:46 PM To: Hansen,Charlie Cc: Ulrich, Kurt; Ericson,Jim; Lee, Greg Subject: Grants for Greenfield Park Playground Equipment Two BBC representatives will bring a ckeck written out to the City for$10,000 @ 4:00 p.m. tomorrow. It represents a "precursor gift"to the City's Park Dedication Fund and is outside the $25,000. John Grano recognizes that a committee and funding priorities need to be established (probably over the next 4-5 months). They are fine with the City holding the check and having it formally presented at the Sept. 13th Council meeting. Aaron Original Message From: Hansen,Charlie Sent: Monday,August 30, 2004 4:28 PM To: Ericson,Jim; Ulrich, Kurt Cc: Lee,Greg; Backman,Aaron Subject: RE: Grants for Greenfield Park Playground Equipment I just received a call from Cindy Palm and she is counting a BBC contribution toward the amount that the committee needs to raise. She is planning to have photographers and the press here tomorrow to publicize the donation. Original Message From: Ericson,Jim Sent: Monday,August 30, 2004 1:40 PM To: Ulrich, Kurt Cc: Lee,Greg; Backman,Aaron; Hansen,Charlie Subject: RE: Grants for Greenfield Park Playground Equipment I guess that's one of the points that would need to be clarified. Would BBC's contribution represent a 1 contribution on their part separate and apart from any agreements they have with the City to annually fuQd $25,000 worth of improvements? If this was to represent a part of that first-year$25k agreement, then I involved to ensure the 10k is beingspent where we want it to be spent.... think others should be o ed $ P Original Message From: Ulrich, Kurt Sent: Monday,August 30, 2004 1:34 PM To: Backman,Aaron Cc: Ericson,Jim; Lee,Greg Subject: FW: Grants for Greenfield Park Playground Equipment FYI Original Message From: Hansen,Charlie Sent: Monday,August 30, 2004 1:04 PM To: Ulrich, Kurt Subject: RE: Grants for Greenfield Park Playground Equipment Were we counting on the BBC contribution as Park Dedication revenue? The way this is structured, it appears that it would count as the community group's revenue rather than the city's. Original Message From: Ulrich, Kurt Sent: Monday,August 30, 2004 12:51 PM To: Hansen,Charlie Subject: FW: Grants for Greenfield Park Playground Equipment fyi Original Message From: Ericson,Jim Sent: Monday,August 30, 2004 11:30 AM To: Ulrich, Kurt Subject: RE: Grants for Greenfield Park Playground Equipment I share your questions and concerns. Original Message From: Ulrich, Kurt Sent: Monday,August 30, 2004 9:58 AM To: Backman,Aaron Cc: Ericson,Jim; Dazenski,Steve; Lee,Greg; Crane, Desaree Subject: RE: Grants for Greenfield Park Playground Equipment I think we'd be better off presenting it at a Council meeting. Perhaps they can write us the check and we could do a formal presentation at the Sept 13th Council meeting. I also am unclear and have some concern about who sets the priorities for the money the church will be donating. Is this an example of the way we want it to work? Just a question we should talk to Greg and Steve about. -Kurt Original Message From: Backman,Aaron Sent: Friday,August 27, 2004 11:22 PM To: Ulrich, Kurt Cc: Ericson,Jim Subject: Grants for Greenfield Park Playground Equipment Kurt: I have some good news regarding monetary donations for this project. As you know the City Council on July 26th approved $48,000 for the playground equipment, leaving neighborhood group to raise $22,000. First, I recommended at the TCN Chamber's Gaming Committee on Tuesday that$2,500 be approved for the playground equipment. This was formally approved at the Chamber's Board meeting this morning. Second, I had some discussions with John Grano tonight regarding a gift or contribution BBC could 2 make for playground equipment. It appears that they are willing to contribute $10,000 for this project this year. John would like the church to make this contribution before the end of August. We have tentatively scheduled 4:00 p.m. on Tuesday, August 31, when BBC reps could provide a check to the City's Park Dedication Fund. I suggested to Cindy Palm that this would be a photo opportunity (She'll call the Bulletin) that would benefit the City and the Greenfield Park fundraisers. My suggestions are that the Mayor, you, Cindy Palm, John Kroeger(Park & Rec Chair) be included the photograph. Any thoughts? Aaron 3 Parks and Recreation Survey Results #1 In General,do you usually spend your leisure time in outdoor activities or indoor activities? Indoor Outdoor Equal 3 9 23 #2 Golf 16 Ice Skating 10 Video/Com Games 9 Basketball 10 Card Games 14 Shuffle Board 2 Volleyball 2 Frisbee 11 Board Games 15 Baseball 9 Martial Arts 2 Weightlifting 10 Softball 13 Gymnastics 7 Traveling 21 Football 4 Dance 9 Reading 28 Hockey 6 Musical Instrui 9 Bird Watching 10 Soccer 9 Sledding 15 Lacrosse 0 Tennis 8 Horseshoes 4 Gardening 27 Fitness class 7 Picnicing 19 Home Improvement 27 Skateboardir 3 Bocce Ball 8 Internet 16 Swimming 18 Scrapbooking 9 Sewing 7 Biking 27 Stamping 7 In-line Skating 5 Running/Jog 12 Arts&Crafts 15 Skiing 13 Walking 29 Quilting 3 Other: 8 Fishing,Scuba Diving, Pet Care Snowshoeing,Antiquing,Coin/ Stamp Collection/Playing at the parks,TV Viewing #3 In the past year,have you or any members of your household participated in a Mounds View/YMCA sponsored recreation program? Yes 14 Which ones? Soccer,floorhockey,Dads camp w/son&daughter,Soccer,Tball,Swimming,Scrap- booking,Kids Kaboodle,Basketball, Baseball,Butterflies,Willy Tillys,Preschool Sports No 22 Why not? Children are grown up,Age,Prefer outdoor activities,Time conflicts,to busy,members of a different YMCA,go to rehab at Unity Hospital,Money,No interest. #4 In the past year,how often have you or members of your household used a park facility(s)in Mounds View? Less than 5 6 thru 10 11 thru 15 More than 15 8 2 4 23 #5 Which Park is closest to your home Silver View 5 Random 3 Arden 1 Oakwood 1 Hillview 4 Greenfiled 3 City Hall! 0 Woodcrest 2 Lambert 7 Lakeside 2 Groveland 8 U) M #5a Are you satisfied with the amenities at this park? Yes 25 No 10 #5b Ammenities added or changed Random Need outdoor restrooms Lots of Rust on playground equipment Picnic tables closer to playground Get rid of diggers and put in merry go round or riding animals Silver View Needs enclosed shelter Lakeside Debris Cleanup Tree and shrub maintenance Cleaner Beach Hillview More bathrooms Better parking Lambert Current equipment is more equipped for older children,need equipment for younger kids Greenfield Need newer equipment,current equipment is falling apart. Groveland Tennis court needs to be resurfaced. #6 In the past two years,have you used the Mounds View Community Center? Yes 22 Used for? Excersise Equipment Banquet Center Gym Meetings Organized Recreational Activities Other 2 6 4 8 7 4 Girl Scouts No 15 Dance Class Childcare Work Party Basketball(outside) Pinewood Derby Why not? Protesting the expense of faciltiy. Just moved here No Interest To many other things going Didn't know about it Done other activities at other YMCA #7 What additional features or recreational programs would you like to see at the Community Center? MoreSaturday activities More varied/challenging aerobic classes Pool #8 Please rate the following Mounds ViewP ark Features: 1(Poor) 23 Fair 4 5(Excellent) DK(Don't Know) Identification/signage 0 0 11 15 5 1 Community Center 0 1 3 17 5 5 Park Buildings 0 4 8 11 3 6 Picnic areas/shelters 3 2 7 14 2 3 Playground equipment 3 2 7 16 0 4 Trees/landscape 2 0 9 14 7 1 Rinks(hocke and pleasure) 0 3 6 12 0 12 Open Space 0 2 6 17 3 4 Playing fields(football,soccer,baeball fields,ba: 1 0 7 13 5 7 Lighting 1 0 13 9 1 6 Trails 3 2 6 12 3 5 Cross Country Skiing 2 1 2 3 0 23 Sledding 2 2 5 4 3 17 Golf Course 0 0 3 8 3 19 Frisbee gold 0 0 2 4 0 25 Cleanliness of Parks 2 4 4 17 4 2 Safety ofparks 0 5 8 15 2 2 Tennis Courts 0 4 4 4 1 19 If a Mounds View Park Featureis rated poor,please explain: Branches falling from Maples Big branches fall from Oaks Need more picnic areas #9 In general,areyou satisfied with the park facilities in Mounds View? Yes 30 No 4 #10 Are there any amenties that you would like to see added to the Mounds View Park System? More walking/biking trails(connected) Not enough Tennis courts&Soccer fields, Newer play equipment Need lights at Woodcrest, Fishing pier for kids Need more community park programs Indoor hockey rink Dog running park More benches Picnic tables at Greenfield Better upkeep More walking paths Summer crafts Bathrooms open More connected trails #11 Would you support a bond referendum for the development of features within the Mounds View Park System? Yes 14 No 10 Unsure 13 #12 Additional Comments: Need walk bridge over Hwy 10/Edgewood The lions have done more for Lakeside park than MV/SLP have done in the last 30. We need more free activities for the cmty. We need feline rescue.Need activities for handicapped. We need to thank the police and Fire dept for all the help they offer us all. The graffiti concerns us..when lye called about it,quick action was taken to clean it up. Hillview Sktng park never open,could use more grooming on trails,pick up branches. Playground equip good at some,need better/more trail maps,lights didn't work at tennis courts We like New Brighton's park program and Community Center. Parks ave very important to our Community. P&R needs to find more ways to get funding to update Playground Equipment. Playground Equipment needs to be a PRIORITY. YMCA is doing a great job Groveland park-Very Nice. Nice balance of trees&space,and great variety of play equipment for kids Would like to see development of paths and trees along Hwy 10. Rinks have poor maintenance-especially weekends Just fine as it is. Stop asking for more money,not everyone is interested in these programs,features or activities Would like to see other funding. Bridges on Greenfield need better gaurds,instead of chain rope. Map acess with parks indicated and listing of amenities and age appropriateness. Lee, Greg 3h . From: Suzann Willhite [suzann.willhite@dnr.state.mn.us] Sent: Monday, August 30, 2004 1:56 PM To: greg.lee@ci.mounds-view.mn.us; mrygwall@ci.spring-lake-park.mn.us Subject: Sign for Spring Lake Fishing Pier? Marian, Due the sign shop requirements, the final wording is as follows: SPRING LAKE FISHING PIER 3" A COOPERATIVE PROJECT BETWEEN 1 4" CITY OF SPRING LAKE PARK 2" CITY OF MOUNDS VIEW 2" MINNESOTA DEPARTMENT OF NATURAL RESOURCES 1 4" Suzann Willhite DNR-Trails & Waterways 1200 Warner Road St. Paul, MN 55106 651-772-7937 651-772-7977 FAX >>> "Marian Rygwall" <mrygwall@ci.spring-lake-park.mn.us> 8/30/2004 11:12:38 AM >>> Hi Suzann, Thanks for the updates on the fishing pier. I noticed the sign info attached still had the word "city" rather than "cities" on it. Was the wording changed for the actual sign order? Just checking. Thanks again for all your work on this project. Marian Original Message From: Suzann Willhite [mailto:suzann.willhite@dnr.state.mn.us] Sent: Friday, August 20, 2004 1: 18 PM To: Kent Skaar Cc: greg.lee@ci.mounds-view.mn.us; mrygwall@ci.spring-lake-park.mn.us; Suzann Willhite Subject: Request for Status of Spring Lake Fishing Pier ? Kent, Checking back with you on the status of the Spring Lake fishing pier. I know you mentioned that MinnCor may not be able to deliver this pier this season due to their heavy workload. Do you have an update? Please copy all on your response. Thank you. Suzann Willhite DNR-Trails & Waterways 1200 Warner Road St. Paul, MN 55106 651-772-7937 651-772-7977 FAX 1 9 A. Last Revised: September 22, 2004 MOUNDS VIEW PARKS AND RECREATION PARK NEEDS ANALYSIS The following is a list of park related needs as identified by the Parks and Recreation Commission in 2003. These include both short term and long term needs. The identification of the park needs is the first step in developing a long term Capital Improvement Program(CIP) and developing recommendations pertaining to the City's park system for consideration in the 2005 Budget. The needs list are categorized into three categories: A. Maintenance (do now) B. Budget(budgeted item for 2005,2006, or 2007) C. Long Term (add to Capital Improvement Program) The following list is the updated needs list developed in 2003 with the category for each item noted.(A, B, OR C) Sorted by Catagory A. Maintenance (do now) 1. Weed playground(sand) area of Greenfield Park. Suggested during May 8, 2003 park tour. A 2. Trim and prune bushes and trees at Greenfield Park. Park Foreman Recommendation. A 3. Remove weeds from tote lot at Greenfield Park. Park Foreman Recommendation. A 4. Repair storm drain at Greenfield Park. Park Foreman Recommendation. A 5. Re-chip entire of Greenfield Park. Park Foreman Recommendation. A 6. Trim back vegetation from ball field fence at Greenfield Park. Park Foreman Recommendation. A 7. Repair outdoor toilet enclosures at Groveland Park. Park Foreman Recommendation. A($800-$1,000) 1 8. Trim back trees on north end of tennis court at Groveland Park. Park Foreman Recommendation. A 9. Trim bushes on south end of at Groveland Park. Park Foreman Recommendation. A 10. Catch basin east end of Hillview Park—repair or remove. Park Foreman Recommendation. A 11. Trim and prune all trees and bushes at Lambert Park. Park Foreman Recommendation. A 12. Repair/replace hockey boards and paint rink boards at Lambert Park. Park Foreman Recommendation. A 13. Baseball Field at Oakwood Park: fill in with Ag-lime. A 14. Toilet enclosure at Oakwood Park(remove). Park Foreman Recommendation. A 15. Trim up north end of Oakwood Park. Park Foreman Recommendation. A 16. Address drainage problems on ballfield at Oakwood Park. Park Foreman Recommendation. A 17. Iron railing at Random Park—fix or replace iron railing. This is in the 2003 budget A 18. Replenish woodchips(fiber-fill)play area at Silver View Park. Suggested during May 8, 2003 park tour. A 19. Perform general maintenance on the horseshoe pits at Silver View Park. Suggested during May 8, 2003 park tour.A 20. Paint building at Silver View Park. Park Foreman Recommendation. A 21. Install bridge for disc golf course at Silver View Park. Park Foreman Recommendation. A 22. Repaint inside of shelter at Silver View Park. Park Foreman Recommendation. A 23. Landscape on west side of parking lot at Silver View Park. Park Foreman Recommendation. A 2 24. Trim &prune trees and bushes all around parking lot at Silver View Park. Park Foreman Recommendation. A 25. Replace back stops on horseshoe pits at Silver View Park. Park Foreman Recommendation. A 26. Replace toilet enclosure at Silver View Park. Park Foreman Recommendation. A 27. Replace fiberfill in playground tot lot at Woodcrest Park. Park Foreman Recommendation. A 28. Paint/redo sign at Woodcrest Park. Park Foreman Recommendation. A 29. Blacktop repair at path entrance at Woodcrest Park. Park Foreman Recommendation. A 30. Develop a Parks (City) Facility Brochure A -2003 B. Budget (budgeted item for 2004, 2005, & 2006) 2004 (Total Cost estimate-$34,633) 1. Paint and repair City Hall pavilions. Park Foreman. B ($1000) 2. New tables in park and pavilions at City Hall. Park Foreman Recommendation. B (8 Tables, $7,000) 9. Install nets above back stop at Greenfield Park. Park Foreman Recommendation. B ($2400) 15. Add more picnic tables at Hillview Park. Suggested during May 8. 2003 park tour. B ($2,500) 17. Install grill by shelter at Hillview Park. Park Foreman Recommendation. B ($300) 18. Resurface roller blade rink at Hillview Park. Park Foreman Recommendation. B ($5,000-$7,000) 19. Add carpeting or some sort of floor covering at Lambert Park. Suggested at the May 22nd meeting. B ($2,000) 23. Replace picnic tables at Oakwood Park. Park Foreman Recommendation. B ($1 Table-$1,000) 3 24. Install chain-link fence on west end of field for soccer play at Oakwood Park. Park Foreman Recommendation B ($500) 26. Replace doors on building at Random Park. Park Foreman Recommendation. B ($600) 28. Install park bench at south end of playground at Random Park. Park Foreman Recommendation. B ($600) 29. Crack seal parking lot at Silver View Park. B ($1,520) (seal coat, included@ $6,533.00) 30. Replace the two grills at Silver View Park. Suggested during May 8, 2003 park tour. B ($800) 33. Add picnic tables by the basketball court/parking lot area at Silver View Park. Suggested during May 8, 2003 park tour. B ($800) 34. Add picnic tables by the playground area at Silver View Park. Suggested during May 8, 2003 park tour. B ($800) 40. Replace doors on shelter at Silver View Park. Park Foreman Recommendation. B ($800) 2005 (Total Cost estimate-$43,200) 4. Basketball Hoop of Greenfield Park: add to the court next to the tennis courts. Suggested during May 8, 2003 park tour. B ($1000) 5. Basketball Court of Greenfield Park: look at resurfacing it. Suggested during May 8, 2003 park tour. B ($1700) 6. Baseball Field of Greenfield Park: Increase the height of the fence ten feet (or 20'total)—right field to center field, tighten netting and re-string support line, raise spots on Ag limo portions for the field, raise the low -• -• - - - - - • . . Suggested during May 8, 2003 park tour. B ($16,000) 7. Add Netting at Greenfield Park along the third baseline to address foul balls. Suggested at the May 22nd meeting. 11. Re-do volleyball court at Groveland Park. Replace standards. Park Foreman Recommendation. B ($500) 12. Resurface basketball and tennis courts at Groveland Park. Park Foreman Recommendation. B ($5,000) 4 16. Heavy-duty hockey nets at Hillview Park. Park Foreman Recommendation. B ($800) 20. Repair exterior& interior of building at Lambert Park. Park Foreman Recommendation. B ($1,000) 21. Replace broken sections of sidewalks at Lambert Park. Park Foreman Recommendation. B ($1,000) 25. Replace border on playground at Random Park. Park Foreman Recommendation. B ($2,200) 31. Perform tuck-pointing(fix/fill mortar joints) on the building and re-paint it at Silver View Park. Suggested during May 8, 2003 park tour. B ($2,000) 37. Resurface basketball court at Silver View Park. Park Foreman Recommendation. B ($5,000) 39. Replace trash receptacles around parking lot& near shelter as needed at Silver View Park. Park Foreman Recommendation. B ($2,000) 43. Greenfield Park play equipment B ($5,000) 2006 (Total Cost estimate-$44,900) 13. Replace rink and court lights with more efficient fixtures at Groveland Park. Park Foreman Recommendation. B (apx. $8,000) 14. Level pleasure rink area and plant with hardy seed at Groveland Park. Park Foreman Recommendation. B ($600-$800) 22. Playground equipment upgrade at Oakwood Park. Park Foreman Recommendation. B ($20,000+$4,000) 27. Repair storm drain in southwest corner of Random Park. Park Foreman Recommendation. B (Wait on Parking Lot) 32. Develop a proposal to treat the algae in Silver View Lake. 1.) Do nothing, 2.)Barley Straw Treatment, 3.) Bacterial Treatment. Suggested during May 8, 2003 park tour. B ($2,000) 35. Re-roof(shingle)building at Silver View Park. Park Foreman Recommendation. B ($7,000) 5 38. Central map for disc golf at Silver View Park. Park Foreman Recommendation. B ($600) 41. Repair storm drain in southwest corner at Woodcrest Park. Park Foreman Recommendation. B- storm sewer budget($2500) DELETED ITEMS 3. Add concrete pad&picnic table on north side of the Community Center. Park Foreman Recommendation. B (Done, $1200) 8. Repair/sealcoat trail in Greenfield Park. Park Foreman Recommendation. B ($975.00) Pull: include in a pathway project 10. Take out black locust trees and replace with others at Groveland Park. Park Foreman Recommendation. B (Done in 2003, $2000- Tree Removal, $500-Stumps, See Steve for explanation) 36. Re-landscape islands at Silver View Park. Park Foreman Recommendation. B ($500) 42. Perform a City wide survey B On the November 3, 2003 City Council Work Session agenda to discuss 44. Silver View Path Pull: include in a pathway project C. Long Term (add to Capital Improvement Program) 1. Irrigation System at City Hall—add an irrigation system to the south, east, and west side for City Hall. Currently in CIP for 2005. C—2005 2. Edgewood Drive Boulevard Project—place colored concrete or brick pavers between the curb and pathway on Edgewood Drive. Currently in CIP for 2006. C-2006, possibly sooner 3. Playground replacement at City Hall. Park Foreman Recommendation. C- 2007 ($24,000-$25,000) (Fibarfill $6,000) 4. Community Center Parking Lot—redesign so the front ends of vehicles do not overhang the sidewalk. There is a drainage problem that needs to be addressed in front of the daycare. Add storm sewer catch basin and pipe it out to Bronson Drive. Currently in CIP for 2007. C- 2007 6 5. Tennis Courts of Greenfield Park—Clean up, crack seal surface, slurry coat, add a gate to the fence for maintenance purposes. Suggested during May 8, 2003 park tour. C—2010 6. Look into developing a soccer field in the undeveloped area near Trunk Highway 10 of Greenfield Park. Suggested during May 8, 2003 park tour. C— 2009 7. Playground replacement of Greenfield Park. Park Foreman Recommendation. C-2010 ($50,000-$55,000 Fibarfill$8,000) 8. Repair/sealcoat parking lot of Greenfield Park. Park Foreman Recommendation. C-2011 ($2,500) 9. Replace security light with more efficient fixtures at Greenfield Park. Park Foreman Recommendation. C—2006 10. Park Building at Groveland Park—replace existing building. Currently in CIP 2004 design/2005 construction C—2004 11. Playground replacement at Hillview Park. Park Foreman Recommendation. C —2008 (826,000+86,000) 12. Park Building at Lambert Park —replace existing building. Currently in CIP 2010 design/2011 construction C—2010 13. Elevation on ballfield and repair drainage ditch at Lambert Park. Park Foreman Recommendation. C—2007 14. Pave the pathway on the northwest corner of Hillview and Quincy at Oakwood Park. Suggested during May 8, 2003 park tour. C—2007 15. Determine the feasibility of developing a small soccer field at the northwest corner of Hillview and Quincy at Oakwood Park. Suggested during May 8, 2003 park tour. C—2006 16. Park Building at Random Park—replace existing building. Install ADA ramp and railing Currently in CIP 2006 design/2007 construction C- 2006 17. Random Parking Lot—reconstruct the parking lot. Currently in CIP for 2008. C—2008 18. Resurface parking lot at Silver View Park. Park Foreman Recommendation. C—2008 7 19. Paved trail at Woodcrest Park. Park Foreman Recommendation. C—2007 20. Skate Park—develop a skate park within the City. Currently in CIP for 2004. C—2004 21. Skate Park Expansion—expand existing skate park. Currently in CIP for 2006. Assumes that a skate parks is constructed and successful. C—2006 22. Pathway Construction—construct a pathway along the north side of County Road H from Edgewood Drive to west City limits. C- 2003 23. Pathway Construction—construct a pathway along the south side County Road 10 from where the existing pathway terminates by the Mermaid to Woodale Drive. C—2003 24. Pathway Rehabilitation—re-construct and raise the elevation of the pathway along the north side that is adjacent to the wetland to the south east of Walgreen's. This segment was constructed in the flood plain of the wetland and is periodically flooded. C-2003 25. Pathway Construction—construct a pathway along Groveland Drive from County Road Ito County Road 10. This would be done only with the reconstruction of Groveland Drive, which is currently included in the 2003 Street Improvement Project. Which side of the road it will be constructed has yet to be determined. C—2004 26. Pathway Construction—construct a pathway along the north side of Hillview Drive between Hillview Park and Greenfield Park. Currently in CIP for 2004. (maybe do when Hillview Road is upgraded at some future date) C - ? 8 *94. Lee, Greg From: Dazenski, Steve Sent: Wednesday, September 15, 2004 3:19 PM To: Kinney, Tom Cc: Lee, Greg Subject: Hillview Building Vandalism Deputy Chief Kinney, I'm looking for some help at the Hillview Bldg. It has been observed to be a hangout for junior high aged kids. We are experiencing a lot of graffiti on the picnic tables that are under the overhang in front of the bldg. This is a lit area and you would think that would be a deterrent but it happens. This may seem a little trivial but the parents of the little ones and picnickers should not have to be subjected to this. Could you have the troops keep an eye on the place and maybe we can curb these unwanted activities. Thanks, Steve 1