Loading...
HomeMy WebLinkAbout03/18/2004 Agenda & Packet Park and Recreation Committee Meeting Agenda March 18, 2004 6:30 P.M. Roll Call 2. Acknowledge there are no minutes from the February 26, 2004 meeting. 3. Unfinished Business: a) Facility Guide Update- Staff is working with the YMCA for making revision to the draft. Additional pictures are still needed. The draft should be ready to present back to the Commissioners at the April meeting. b) Park Usage Survey/Data Collection—A request for volunteers to assist the city in collecting information and filling out the Park Usage Observation Sheet was placed in the March/April addition of the Mounds View Matters. The observation sheet along with a guidance information printed on the back are available at City Hall and on the City's WEB site. At of this date no requests for the sheets have been made. c) Community Survey— Shari Kunza has developed a draft questioner to be included in the May/June addition of the Mounds View Matters. d) Garbage Hauler Donation Fund—All residential haulers in Mounds View were contacted. The City has received a total of four responses at this time—three in favor of the program, one opposed. Attached is summary of the responses. e) YMCA Committee Update—The YMCA Advisory Committee met on March 1, 2004. f) Groveland Park Building Replacement. —The Commissioners made a motion to recommend developing constructions plans. This issue has been placed on the April 5, 2004 City Council Work Session Agenda. Support by the City Council on the Groveland Building replacement is questionable. The Commission may want to consider what data needs to be presented to the City Council on April 5th. The Commission may want to consider presenting a recommended long-range park building plan as part of the recommendation to proceed with the replacement of the Groveland building. g) Lakeside Lions Park Parking Lot—Update is attached h) Greenfield Ballfield Reservations—see attached email 4. New Business: 5. Commissioner/Staff Reports Announce Vacant Seat—Deadline to apply is 4:30pm April 19, 2004. 6. Request for future agenda items/other business Possible Items for April22"d Agenda Lakeside Lions Park—Parking Lot On March 8, 2004 the City Council gave direction to proceed with adding in the "Option 1"parking lot of the Lakeside Lions Park. Since then, two more options (3 and 4) have been developed. These are direct spinoffs of the City Council's recommended Option 1. Options 3 and 4 are nearly the same size and cost of Option 1. However, they have angled parking. Option 3 has a one-way circulation pattern. Option 4 has a two-way. By making Option 4 four feet wider (making it close to the size of Option 1) this will allow for striping of the lot as per Option 1 or as per Option 4. This is the solution Staff is recommending to the Mounds View City Council. It is also the recommendation being proposed to the Spring Lake Park City Council. Mounds View Parks & Recreation Survey The Mounds View Parks and Recreation Commission is veryinterested in obtaining your opinion of the current Mounds View Parks System and your vision for its future. Please complete this survey and return to City Hall or the Mounds View Community Center by (date). The results of this survey will be shared at the(date)meeting of Parks and Recreation Commission. Thank you for taking your time to help us make better decision for the residents of Mounds View. 1. In general,do you usually spend your leisure time in outdoor activities or indoor activities? Indoor Outdoor Equal Amounts of both 2. In which of the following leisure activities do you or members of your household participate? (check as many as apply) ❑Golf ❑Ice Skating ❑Video/Computer Games ['Basketball ❑Card Games ['Shuffle Board ❑Volleyball ['Frisbee ❑Board Games ['Baseball ❑Martial Arts ❑Weightlifting ['Softball EGymnastics ❑Traveling ['Football ['Dance ['Reading Hockey ❑Musical Instruments ❑Bird Watching ❑Soccer ['Sledding ['Lacrosse ❑Tennis ['Horseshoes ❑Gardening ❑Fitness classes ['Picnicking ❑Home Improvement ❑Skateboarding ❑Bocce Ball ❑Internet ❑Swimming ❑Scrapbooking ❑Sewing Biking ['Stamping ❑In-line skating ❑Running/Jogging ['Arts&Crafts ❑Skiing(downhill or cross-country) ❑Walking ❑Quilting ['Other(please list) 3. In the past year,have you or any members of your household participated in a Mounds View/YMCA sponsored recreation program? a. If yes,which ones? b. If not,why not? 4. In the past year,how often have you or members of your household used any park facility in Mounds View? Less than 5 6-10 11-15 more than 15 5. Which Park is closest to your home? Silver View City Hall Groveland Hillview Oakwood Lakeside Random Woodcrest Not sure a. Are you satisfied with the amenities at this park? YES NO b. In no,what amenities would you like added or changed? 6. In the past two years,have you used the Mounds View Community Center? YES NO a. If yes,what have you used it for? ['Exercise Equipment ❑Banquet Center ['Gym ['Meetings ['Organized Recreational Activities ['Other(please list) b. If no,why not? 7. What additional features or recreational programs would you like to see at the Community Center? 8. Please rate the following Parks&Recreation features: Feature Poor Fair Excellent Don't Know Identification/signage 1 2 3 4 5 DK Park Buildings 1 2 3 4 5 DK Picnic areas/shelters 1 2 3 4 5 DK Playground equipment 1 2 3 4 5 DK Trees/landscape 1 2 3 4 5 DK Rinks(hockey&pleasure) 1 2 3 4 5 DK Open space 1 2 3 4 5 DK Playing fields(football,soccer,baseball 1 2 3 4 5 DK fields,basketball courts) Lighting 1 2 3 4 5 DK Trails 1 2 3 4 5 DK Cross Country Skiing 1 2 3 4 5 DK Sledding 1 2 3 4 5 DK Golf Course 1 2 3 4 5 DK Frisbee golf 1 2 3 4 5 DK Cleanliness of Parks 1 2 3 4 5 DK Safety of Parks 1 2 3 4 5 DK Community Center 1 2 3 4 5 DK Tennis Courts 1 2 3 4 5 DK 9. In general,are you satisfied with the park facilities in Mounds View? YES NO 10. Are there any amenities that you would like to see added to the Mounds View Park System? 11. Would you support a bond referendum for the development of features within the Mounds View Park System? YES NO Unsure 12. Please use this space to make any other comments/suggestions. Thank you for completing this survey! Fold this survey into thirds and mail by(date). You may also fax your form to: 763-784-3462. INSERT MAILER INFORMATION HERE. MEMORANDUM TO: Greg Lee, Director of Public Works FROM: Tracy Juell, Public Works Administrative Assistant DATE: March 17, 2004 SUBJECT: New Customer Donation from Residential Garbage Haulers At the February 26, 2004 Parks and Recreation Commission meeting a request was made of staff to poll the garbage haulers if they would be interested in a"new resident donation"program like ACE Solid Waste has. (See attached letter from ACE.) The following are their responses: Waste Management Yes (see attached email) BFI Yes (see attached email) Larry's Quality Sanitation No Explanation Larry feels that this is "ridiculous to ask the haulers for this donation",he stated that the haulers "have to pay for a license and road restriction permits already". Larry also felt that customers will"bounce back and forth between the haulers and it will be a constant win/loss thing for the haulers". Larry said if "the Commission wants such a contribution,they should pass the hat around to themselves and the Council." (Larry's Quality Sanitation is a family owned business and they do something in-house with their customers to appreciate them;they have monthly drawings for Cub gift certificates.) ACE SOLID WASTE, INC. 6601 McKinley Street NW, Ramsey, MN 55303 January 29, 2003 Tracy Juell City of Moundsview Dear Tracy, At ACE we believe in giving back to the communities in which we serve. Here's how the program will work. For every net new residential customer ACE will donation a monthly basis $5.00 toward the City Parks in Moundsview.Net new meaning that if ten new customers start and five change from our service, then five would be recognized and our monthly donation would be $25.00. If you have any questions or comments, please feel free to give me a call at(763) 427-3110. Thank you, Denny Fredrickson General Manager C° Tbe (P) 763-427-3110 (F) 763-427-1691 www.acesolidwaste.com LEADER SERVICE Juell, Tracy From: Klennert, Jennefer[jklenner@wm.com] Sent: Wednesday, March 03, 2004 5:27 PM To: 'tracy.juell@ci.mounds-view.mn.us' Cc: Boyum, Gary; Metz, Steve Subject: New Customer Donation to Mounds View Parks Tracy, Waste Management will gladly participate in the new customer donation program to Mounds View Parks. We will donate $5.00 to the city of Mounds View Parks for every net new residential customer that Waste Management receives. The donation amount will be determined on a monthly basis. Plese let me know if we can be of further assistance. We appreciate the opportunity to partner with the City of Mounds View Parks to make our environment a better place. Please let me know that the Parks Commission has accepted our offer. Jennefer Klennert Residential Marketing Waste Management 10050 Naples Street NE Blaine, MN 55449 Direct (952) 882-2311 Fax (763) 783-5477 1 March 5, 2004 Ms. Tracy Juell 0/0 City of Mounds View 2401 Highway 10 Mounds View, MN 55112-1499 Dear Tracy, In response to your March 1, 2004 letter regarding New Customer Donation to the Mounds View Parks, BFI would be happy to donate $5.00 for every net new customer. If you have any questions, please feel free to contact me at (651) 286.4570. Sincerely, 4 Craig S 'm General Manager BFI Waste Systems TOO/TOOZ '1111rd IS I d g LT7217 99Z T29 IVd CT:5T I2id tOOZ/50/C0 CITY OF MOUNDS VIEW YMCA ADVISORY COMMITTEE MEETING AGENDA Monday, March 1, 2004 2:30 p.m. Mounds View Community Center, Room A 1. Monthly Program Updates 2. School Coordinator Fee 3. YMCA Camera/Cell Phone Use Policy 4. Pay Phone Participation by Mermaid 5. Mounds View Matters — Review Distribution and Format 6. Review YMCA Contract 7. Recreation and Parks Survey 8. Other Use or Maintenance Issues 9. Adjourn CITY OF MOUNDS VIEW YMCA ADVISORY COMMITTEE MEETING AGENDA Monday, February 2, 2004 MEETING NOTES Attendance: Council Member Gunn, City Staff: Kurt Ulrich, Charlie Hansen, Steve Danzenski, YMCA Staff: Jeanette Steeves, Marta McIntyre, Pat Riemersma 1. Quarterly/Year End Program Report The next quarterly report will be available at the April 5th meeting. 2. Distribution of Mounds View Matters to Schools The March/April City Newsletter will be distributed to all local elementary schools. Marta is to collect feedback fro schools about the distribution and participants will be asked how the found out about programs. City staff is to check the cost of printing just recreation brochure piece. 3. Pay Phone at Community Center It was a general concensus that it would be a good idea to purchase a pay phone at $950 plus $600 for installation and charge $.50 per call, rather than lease at $415 install, plus $55 per month. Kurt will check with the Mermaid to see if they will be willing to help pay for the phone. 4. School Coordinator Fee Discussion Charlie will contact Jill Stevens at the School District to get information on which groups are using and being charged for the facilities. 5. Electronic Defibrillator The YMCA is interested in having the surplus heart defibrillator installed at the MVCC. Pat is research where the YMCA got their storage container for the defibrillator and give that information to the City. 6. MVCC Maintenance Contact Person Kurt Ulrich announced that Steve Daenski is now the designated maintenance contact person for the MVCC. All tenants and City Staff have been notified of this fact. Due to new tenants and the work of other staff on lease issues, there had been some confusion about who to go to with maintenance issues. 7. Next Meeting The Committee established the 1St Wednesday of each month as the regular meeting date, at 2:30 pm. Kurt will distribute annual calendars. 8. Adjourn The meeting was adjourned at 3:33pm. • Bonestroo,Rosene,Anderlik and Associates,Inc.is an Affirmative Action/Equal Opportunity Employer Bonestroo and Employee Owned Rosene Principals:Otto G.Bonestroo.P.E.• Marvin L.Sorvala,P.E.• Glenn R.Cook,P.E.• Robert G.Schunicht,P.E.• :.. Jerry A.Bourdon,P.E.• Mark A.Hanson,P.E. 11 Ander lil< & Senior Consultants:Robert W.Rosene,P.E.•Joseph C.Anderlik,P.E.•Richard E.Turner.P.E.• Susan M.Eberlin.C.P.A. Associates Associate Principals:Keith A.Gordon,P.E.•Robert R.Pfefferle,P.E.•Richard W.Foster.P.E.•David O.Loskota.P.E.• Michael T.Rautmann,P.E.•Ted K.Field.P.E.• Kenneth R Anderson.RE.•Mark R.Rolfs,P.E.• David A.Bonestroo,M.B.A.• Engineers &Architects Sidney P Williamson.P.E.,L.S.•Agnes M.Ring,M.B.A.•Allan Rick Schmidt,P.E.• Thomas W Peterson,P.E.• g James R.Maland,P.E.• Miles B.Jensen,P.E.• L.Phillip Gravel III,P.E.• Daniel J.Edgerton.P.E.• Ismael Martinez,P.E.• Thomas A.Syfko.P.E.•Sheldon J.Johnson• Dale A.Grove,P.E.• Thomas A.Roushar,P.E.• Robert J.Devery.P.E. Offices:St.Paul.St.Cloud.Rochester and Willmar.MN• Milwaukee,WI• Chicago.IL March 11, 2004 website:www.bonestroo.com • Ms. Marian Rygwall, Parks Director City of Spring Lake Park . 1301 —81St Avenue Northeast Spring Lake Park, MN 55432-2116 Re: Lakeside Lions Park Proposed Parking Lot Rehabilitation Cost Estimates—3`d Option Our File No. 435-04-106 Dear Ms.Rygwall: On February 10, 2004 we transmitted to you a package of materials regarding a potential project to rehabilitate the existing parking lot at Lakeside Lions Park. The materials included a cover letter, along with cost estimates and sketches of two options for configuration of the parking lot. Also included was a cost comparison chart for the proposed options to the existing parking lots at Terrace and Able Parks. Option 1 of the previous transmittal was based on right-angle parking, oriented mainly in a north-south direction. Option 2 was based on parking stalls angled at 60 degrees, and oriented mainly in an east-west direction. Based on discussion since that time, you have requested that information be provided regarding a third option for parking lot. Option 3 would have angled parking similar to Option 2,but oriented in a north- south fashion as in Option 1. Traffic circulation in Option 3 would be mainly one-way. We have completed a working drawing and cost estimate for Option 3, and are transmitting it with this letter. Also included are the previous cost estimates and drawings for Options 1 and 2 for reference, as well as an updated cost comparison chart to include Option 3. It can be seen from the information that the surface area of the parking lot in Option 3 is approximately 10% smaller than in Option 1. Despite this, we have estimated that the cost to construct Option 3 would be virtually the same as for Option 1. The main reason for this is that under Option 3, there is a much larger area of the existing parking lot that will need to be converted back into green space. We have assumed that a 12-inch thick layer of imported topsoil will be needed for this area, to replace the existing bituminous that is removed, as well as any gravel or other material not conducive to growing turf. The cost savings of new bituminous and gravel for the smaller parking surface area of Option 3 is essentially offset by the greater quantity of imported topsoil and sod that will be needed. Hopefully these transmittals provide the information necessary for your upcoming report to the City Council at their meeting of March 15, 2004. I would be happy to discuss this information in more detail if you have any • questions. Please do not hesitate to contact me at(651)604-4803. Very truly yours, BONESTROO,ROSENE,ANDERLIK&ASSOCIATES,INC. Joseph R.Rhein, P.E. Enclosure 2335 West Highway 36 • St. Paul, MN 55113 • 651-636-4600 ■ Fax: 651-636-1311 CM'OF 5;9 1119iHDS OEW LAKESIDE LIONS PARK PARKING LOT REHABILITATION ASSUMPTIONS USED FOR COST ESTIMATES CITIES OF MOUNDS VIEW AND SPRING LAKE PARK BONESTROO FILE NO. 435-04-106 Assumptions: 1. End parking lot area at fence line for cost estimating purposes. Costs related to curb radii, etc at the street entrance will be assigned to the street. 2. Costs related to realigning the sidewalk near the entrance are included in this estimate. 3. Sprinkler system within the park will be relocated by the cities. No costs included here. 4. Excavation depths have been assumed. A survey would be required for preparation of a final construction plan. Quantity may change depending on that information. 5. If work is combined with the City of Mounds View 2003 Street Improvement Project, recycled gravel base from the reclamation of the old streets will be used in the parking lot to the maximum extent possible. The actual quantity of recycled gravel available will not be known until the time of the street construction. For purposes of these estimates, it has been assumed that 50% of the required gravel base will be available as recycle. 6. 12 inches of topsoil will be required on all old paved areas that are converted to green space. 7. Rice Creek Watershed District may require storm water features in conjunction with the parking lot rehabilitation. Such features are_outside the scope of this estimate. 8. No repairs to the concrete slabs and sidewalks by the Beach House are included, beyond the installation of new access ramps for the disabled. 9. Initial striping of the lot will be done as part of the construction. Cost are included. Future maintenance of the pavement markings will be done by the cities. 10. Dumpster enclosure will be built by city forces. No costs included in this estimate. 11. Existing concrete parking stops will be salvaged by city forces prior to construction. 12. Typical section: 6" gravel base; 2" bituminous base; 1-1/2" bituminous wear surface c9 J 111r LAKESIDE LIONS PARK PARKING LOT REHABILITATION COST ESTIMATE OPTION 1: Right Angle Parking, North-South Orientation CITIES OF MOUNDS VIEW AND SPRING LAKE PARK BONESTROO FILE NO. 435-04-106 Estimated cost if bid as Estimated cost if bid as part of larger street project stand alone project Quantity Unit Desciption Unit Price Total Price Unit Price Total Price 2 EA Private utility locate $300.00 $600.00 $300.00 $600.00 4,400 SY Remove existing bituminous surfacing 2.40 10,560.00 2.75 12,100.00 700 SF Remove existing concrete sidewalk 2.00 1,400.00 3.00 2,100.00 4 EA Remove existing bollards 125.00 500.00 125.00 500.00 1 EA Remove existing cottonwood tree, 30" 500.00 500.00 500.00 500.00 3 EA Remove existing fruit tree, 2" 200.00 600.00 200.00 600.00 2,125 CY Common excavation for parking lot 9.00 19,125.00 10.00 21,250.00 675 TN Recycyled Class 5 gravel base* 6.00 4,050.00 12.00 8,100.00 675 TN New Class 5 gravel base 12.00 8,100.00 12.00 8,100.00 455 TN Bituminous base course mixture 40.00 18,200.00 42.00 19,110.00 -340 TN Bituminous wear course mixture 48.00 16,320.00 50.00 17,000.00 175 GAL Bituminous mat'I for tack coat 1.50 262.50 2.00 350.00 1,050 LF Saw and seal bit. wear course 2.25 2,362.50 2.50 2,625.00 .750 LF B618 concrete curb& gutter 9.00 6,750.00 11.00 8,250.00 30 CY Common excavation for sidewalk 20.00 600.00 20.00 600.00 25 TN Gravel base for sidewalk 20.00 500.00 20.00 500.00 60 SY 4" thick concrete sidewalk 38.00 2,280.00 40.00 2,400.00 200 SF 6"thick concrete pedestrian ramp 5.00 1,000.00 5.00 1,000.00 24.5 SF New traffic sign 30.00 735.00 40.00 980.00 2,250 LF 4" yellow line, latex paint 1.00 2,250.00 1.20 2,700.00 50 LF 18" white line, latex paint for cross walk 5.00 250.00 6.00 300.00 3 EA Pvmt message- handicap symbol, paint 200.00 600.00 250.00 750.00 450 CY Topsoil borrow 16.00 7,200.00 20.00 9,000.00 1,200 SY Restoration with sod 3.00 3,600.00 5.00 6,000.00 1 LS Drainage Feature 1,500.00 1,500.00 1,500.00 1,500.00 1 EA Adjust existing clean out 200.00 200.00 2.00 2.00 Sub-Total Construction Costs $ 110,045.00 $ 126,917.00 Engr, Testing & Admin 17,500.00 22,500.00 Total Cost-Option 1 $ 127,545.00 $ 149,417.00 Construction Cost Savings: $ 16,872.00 equals 13.29% Total Cost Savings: $ 21,872.00 equals 14.64% Assumes that if this project is included as part of the larger street rehabilitation project, 50% of the gravel base for the parking lot will be available as excess material from the streets. This quantity will not be determined until the time of construction on the street project. CM/OF J V ci 9 E W LAKESIDE LIONS PARK PARKING LOT REHABILITATION COST ESTIMATE OPTION 2: Angled Parking, East-West Orientation CITIES OF MOUNDS VIEW AND SPRING LAKE PARK BONESTROO FILE NO. 435-04-106 • Estimated cost if bid as Estimated cost if bid as part of larger street project stand alone project Quantity Unit Desciption Unit Price Total Price Unit Price Total Price 2 EA Private utility locate $300.00 $600.00 $300.00 $600.00 4,400 SY Remove existing bituminous surfacing 2.40 10,560.00 2.75 12,100.00 - 700 SF Remove existing concrete sidewalk 2.00 1,400.00 3.00 2,100.00 . 4 EA Remove existing bollards 125.00 500.00 125.00 500.00 2 EA Remove existing cottonwood tree, 30" 500.00 1,000.00 500.00 1,000.00 2 EA Remove existing fruit tree, 2" 200.00 400.00 200.00 400.00 2,260 CY Common excavation for parking lot 9.00 20,340.00 10.00 22,600.00 775 TN Recycyled Class 5 gravel base" 6.00 4,650.00 12.00 9,300.00 775 TN New Class 5 gravel base 12.00 9,300.00 12.00 9,300.00 530 TN Bituminous base course mixture 40.00 21,200.00 42.00 22,260.00 400 TN Bituminous wear course mixture 48.00 19,200.00 50.00 20,000.00 200 GAL Bituminous mat'l for tack coat 1.50 300.00 2.00 400.00 1,330 LF Saw and seal bit. wear course 2.25 2,992.50 2.50 3,325.00 775 LF B618 concrete curb & gutter 9.00 6,975.00 11.00 8,525.00 30 CY Common excavation for sidewalk 20.00 600.00 20.00 600.00 25 TN Gravel base for sidewalk 20.00 500.00 20.00 500.00 60 SY 4"thick concrete sidewalk 38.00 2,280.00 40.00 2,400.00 200 SF 6"thick concrete pedestrian ramp 5.00 1,000.00 5.00 1,000.00 24.5 SF New traffic sign 30.00 735.00 40.00 980.00 2,750 LF 4"yellow line, latex paint 1.00 2,750.00 1.20 3,300.00 50 LF 18" white line, latex paint for cross walk 5.00 250.00 6.00 300.00 3 EA Pvmt message - handicap symbol, paint 200.00 600.00 250.00 750.00 16 EA Pvmt message - arrow, paint 200.00 3,200.00 250.00 4,000.00 275 CY Topsoil borrow 16.00 4,400.00 20.00 5,500.00 1,050 SY Restoration with sod 3.00 3,150.00 5.00 5,250.00 1 LS Drainage Feature 1,500.00 1,500.00 1,500.00 1,500.00 1 EA Adjust existing clean out 200.00 200.00 2.00 2.00 Sub-Total Construction Costs $ 120,582.50 $ 138,492.00 Engr, Testing & Admin 17,500.00 22,500.00 Total Cost- Option 1 $ 138,082.50 $ 160,992.00 Construction Cost Savings: $ 17,909.50 equals 12.93% Total Cost Savings: $ 22,909.50 equals 14.23% ' Assumes that if this project is included as part of the larger street rehabilitation project, 50%of the gravel base for the parking lot will be available as excess material from the streets. This quantity will not be determined until the time of construction on the street project. MT OR SC,9 11110iHDO EW LAKESIDE LIONS PARK PARKING LOT REHABILITATION COST ESTIMATE OPTION 3: Angled Parking, North-South Orientation CITIES OF MOUNDS VIEW AND SPRING LAKE PARK BONESTROO FILE NO. 435-04-106 Estimated cost if bid as Estimated cost if bid as part of larger street project stand alone project Quantity Unit Desciption Unit Price Total Price Unit Price Total Price 2 EA Private utility locate $300.00 $600.00 $300.00 $600.00 4,400 SY Remove existing bituminous surfacing 2.40 10,560.00 2.75 12,100.00 700 SF Remove existing concrete sidewalk 2.00 1,400.00 3.00 2,100.00 4 EA Remove existing bollards 125.00 500.00 125.00 500.00 2 EA Remove existing fruit tree, 2" 200.00 400.00 200.00 400.00 2,070 CY Common excavation forarkin lot 9.00 18,630.00 10.00 20,700.00 P 9 613 TN Recycyled Class 5 gravel base* 6.00 3,675.00 12.00 7,350.00 613 TN New Class 5 gravel base 12.00 7,350.00 12.00 7,350.00 405 TN Bituminous base course mixture 40.00 16,200.00 42.00 17,010.00 305 TN Bituminous wear course mixture 48.00 14,640.00 50.00 15,250.00 155 GAL Bituminous mat'l for tack coat 1.50 232.50 2.00 310.00 1,100 LF Saw and seal bit. wear course 2.25 2,475.00 2.50 2,750.00 760 LF B618 concrete curb& gutter 9.00 6,840.00 11.00 8,360.00 30 CY Common excavation for sidewalk 20.00 600.00 20.00 600.00 25 TN Gravel base for sidewalk 20.00 500.00 20.00 500.00 60 SY 4" thick concrete sidewalk 38.00 2,280.00 40.00 2,400.00 200 SF 6" thick concrete pedestrian ramp 5.00 1,000.00 5.00 1,000.00 24.5 SF New traffic sign 30.00 735.00 40.00 980.00 2,125 LF 4" yellow line, latex paint 1.00 2,125.00 1.20 2,550.00 50 LF 18" white line, latex paint for cross walk 5.00 250.00 6.00 300.00 3 EA Pvmt message- handicap symbol, paint 200.00 600.00 250.00 750.00 12 EA Pvmt message - arrow, paint 200.00 2,400.00 250.00 3,000.00 600 CY Topsoil borrow 16.00 9,600.00 20.00 12,000.00 1,425 SY Restoration with sod 3.00 4,275.00 5.00 7,125.00 1 LS Drainage Feature 1,500.00 1,500.00 1,500.00 1,500.00 1 EA Adjust existing clean out 200.00 200.00 2.00 2.00 Sub-Total Construction Costs $ 109,567.50 $ 127,487.00 Engr, Testing& Admin 17,500.00 22,500.00 Total Cost- Option 1 $ 127,067.50 $ 149,987.00 Construction Cost Savings: $ 17,919.50 equals 14.06% Total Cost Savings: $ 22,919.50 equals 15.28% * Assumes that if this project is included as part of the larger street rehabilitation project, 50% of the gravel base for the parking lot will be available as excess material from the streets. This quantity will not be determined until the time of construction on the street project. 5;9 =V'OF 11111r3 DEW LAKESIDE LIONS PARK PARKING LOT REHABILITATION COST COMPARISON CHART RECENT PARKING LOTS TO PROPOSED OPTIONS FOR LAKESIDE PARK CITIES OF MOUNDS VIEW AND SPRING LAKE PARK BONESTROO FILE NO. 435-04-106 Original Est. Const. Cost or Construction Construction Parking Lot Approx. Size (sf) No. of Stalls Construction Cost Present Value Cost/Stall Cost/Sq. Ft. Terrace Park 20,000 49 $63,058.50 $71,218.27 $1,453.43 $3.56 Able Park 16,750 46 $55,511.50 $62,694.69 $1,362.93 $3.74 Lakeside Park - Option 1 32,000 91 N/A $110,045.00 $1,209.29 $3.44 Lakeside Park - Option 2 37,250 96 N/A $120,582.50 $1,256.07 $3.24 Lakeside Park - Option 3 29,320 82 N/A $109,567.50 $1,336.19 $3.74 Note: Costs shown in the above table are all construction costs, for purposes of direct comparison. For total cost of the options for the proposed parking lot in Lakeside Park, project costs for engineering, testing, and administration must be included. Please refer to the individual cost estimates for more detail. • O ' F' y l^ 2 1/4....1 '9 1. a C) o l Cl) 0 • 09 isi 0-) N + M `� N p, T • CT) 11 (.1751 (I) Cl) �; 1 .. J � X z (� 4 w Z � o Z J QD � m X X X X X ;b � a �tfose� 'sa�e_ __..Nr r---i �r---C'N-1-�-Z CT-'-L1ry-C TTr2 c 1 cD D �D /.D /D /D /D -.D /DJ j D /D ./D 1 D D / / L � �. _v_ _L..n__ar_L>____J_1____1-k.�____l J_--_Ja� L t. r + + 1 1. `.\tiy.`.- ">` Lr. .->\ A->, cr A'>� cam•. , -1 IL\r ♦` .\L I ; A A I l 1 1 ' +I 1 D I A->� �p �� f•r). try IT}+ T,+ !r 1_--1 1 . A r— :LD' 1-..--4AA„a,•T`f>` vr_ 3•• >. f p1 I ' A ;T.'-1 �r JAl4� 1 � �. 1 c„i W Y Y 1 + IL\I f '••`i Zr+ d !� c,....- ' A. �D Ia�,� Z C • N LL , • L CC J n In r • 1 N I \ I CC Y CC L I r cc J A ` K Zr+ 1 {J V) I ' °,,- NEW_ U o II J .'I AI+-I moi• 1 M n" c' r. :T . <-.• O Ur W I--- Z 1 • _� • z Z q 1 I O • - 0 !b J IA,. 1 d 1 i - 6 � " CO P .7__ I+ r _ I .-4 ' r D /b-s-r`f-- • I r' Ir —1 J 2.4 iv\o.• r L r I •. / .1 , t 7 mss` 4.•v) , 4D ,I xl ; i ^ (� X71,- ((��_ G _ N 1 \(•`4D „ r Q I r D _ /D y D a Onii mow 0. L L / • U ...M .- 1 r` • s_,..,„,.. .T D / 11 <ar C ag.., L.: + Ii. a A '` w w�lli�1 1 ' I J V, 1 o A /s 1 1 •"•;.`C cc. .4_. CI Q i�`L_,_��(y �I I J C C I . D• I •• V•/ II N LJ v ii-_ ZrJ \\1Y _• r D �Ld,r.Dl Z' I - i WI i I • L...1 • T----_--- I �r iTC „i _ IO. a L.+ W I „Al a ' IITFii x •i A�>.,I 1 ' 7 nCC W cr. _ Y -I a I v.: J.-,.., e -'< 'fir 24 q W EX -1 >` 1 Z J A'+'` N +A u 1 I i NC cry ¢ Z'J .15' N N Sr I I Tzr • A_••I A->` A'>`I a . • ., • .. • r J vw .4 0 �n C) r_ • 0 -I- 1 L fl PI M M ( D o o • W U M �� M + M uJ • E Cil) E .1 — N U) � Y Q M Q r\4.4...ia, " X U n I. zo Q.) >ol + �t--- _. `r o ZJ Q D CO --,.. ,< ---L-•rr-` -C-c, --Z CT-,--Ll'r v-CZTr"LS - Almr /Dl--_-. /pT iD ,+D . .%D. /p_ /p /p p.. . p._ /p /p /D /p L. jL\ .��__---moi. -�.. �� a �_>__--.J-J�_aT_l�_--_J-1__:_1..)c`___L�_- -L•.��r_- L. D % ♦ .`j=r r '>. T.,/ - � A'a' Tom./ A-a' „. -1 IL\r ♦ 4', 4- 1 A, 1 I I 1 " Al I D I A'.� 1-'_'' �=3• (_C. •.I,�1 A 1 '' Al 2‘4--__ ;5r' • _ ..._ `� '• " .l 'I ,1 $ J i . ITri W I `fir, C' r' • /,'. 11 ' A {{{... v D N% -q Zr C In d . Alm I...1 N agrJ '•r\\ w In 1 W 1 Y rLCYJ 'l`rl' A _,,,r / 11C' CC , VI:1I a {J V/ al 14 r I A', r-,i �' it, ,I.......0 tr�I J�J °i J �' ' sJO z -p —Th W I--_ Z .II ' J Z J I oop °111111111r11111114.(CC 011011 * nil ,:-) \ 011% 4' df° / D lin L ,� ^1L\ L 0%1% 4r. ; 1 ') ®� mI .I`\ J\r IiD• I ,/ I l Kf • �I `Init Lit., IDL\b J ,\„_,,,,,, ....A. D 1 .Y / , , i5.- i an l ,l/ w \ " A n ' L w �1 W , , ,> ,. . . .•, D4 I_ I -0 �''`\`�.0 _ r D. L�r I I VIW Tr------ 't......• /-A. . 'II, _A i . ._ Y Vf1i .K , ., 'X I A��' l�� cc W W T a yJ r J 2 J I , A �. t. I Z r, 2 r, .") 2 r, o_ - J . , . 1 K A J LII f / • ' A 1 ��� E.� IL I I d Y b I AI Tr. II 1 IN.. AI V/ Tri In 2r/ l Tr/ Y , I ;5- I - N N ZfJ rc EA .. 1 I IJ ..11'. A'>''I 1-''I A X x__ X Option 3 . -1\ PRWKi SPRINKLER `fig. --�� SP KLER `� ,� - 6 0 �_ v, ° . v, °• degree . pkg SPRIN.14 �'' e- t:k; ,- '--, :- '; ; X \ — S orientation ti PWNKLER SPRINKLER , y SPINN. LER 1,. .r,-_,,,,,, ;t'--"'==,*.Z7V ry J Y`� _ \ � „ ,,Tv,,,,,,,, r MAINTENANCE_ BUILDING r IX .r, SPRINKLER SPRIP LER -•... \ , i +-> ti • S INKLER `,_i 4-> .. existing pit crec 5:5. I 1_r x 39 /128 . 87 sf E- SPRIN ER i, '1 i I SPRINKLER ii SP NKLER :�_Y o ri :,_Y f 1 1 , "IN ER •. �, ion cesign crec SPRINKLER N I I OU S _ r _-IJ x y ^ iii -P I V G SP'NKLER` I v 1 2 9 318 s f t o i .f 1.N 11 3. 4 '�-Y I ,-� . ER t , DICK of cure I ,v,, ,„ SPR NKLER . ® >1 .. V+ 7 r\. SPRINF ER. 11, \ ` y, y ry `J t c Is : IVIIIIIII crKing �— "c>' Iv• Stcnccrc �� SPR KLERI NI Y }. r Y SPR•`, z.f... ..!,,-7:61111111 o "i+ ;. L. �.t +v — � . ,. cncicc3 I Y 1 . T /T�-x1.1 l\. • u��� + >_�'( • 1 1 p 'v`;D EICI •d,AOU SE /r .l vi• ��_•i — ` i'• .-,, r �T. + I` -,,r \.i._ _ / . J1\Irl •,_, -. SPRINKLER :,_r SPRIN( d, ° o` v yr• o:r.1 y + 1\.• 1 SPRINKLER ' > ; -> 1 v ._ i/ .v_ ,i ° _'Y v _ ,6FIRIp�KLER :2_1' I,'= „ : , ---_----; 1 c SPRINKLER Y. ; = =r_ i ” .-1 FLAG ti' I > , , 1 , .+ , 1 1 1 v, + '1 V - v 1 1 it 1 J ` Y Bonestroo Rosene Anderlik & I ci Associates Engineers&Architects MEMORANDUM To: Parks Director Marian Rygwall File From: Joe Rhein Date: March 12, 2004 Re: Lakeside Park Parking Lot—Option 4 File No.: 435-04-106 On March 11, 2004, we transmitted to you drawings and cost estimates for three options to replace the existing parking lot at Lakeside Park with a new lot. Based on that information, you requested that we prepare a drawing for a fourth option, which combined certain elements of the previous three. Please refer to that transmittal for information on Options 1 through 3 as necessary. We have completed the working drawing for Option 4 for the Lakeside Park parking lot, and are transmitting it with this memo. Option 4 features angled parking, oriented in a north-south direction,very similar to Option 3. However, as you requested, the drive lanes on Option 4 were widened to accommodate two-way traffic. Option 3 had allowed for one-way traffic only. Therefore the traffic flow in Option 4 is very similar to Option 1. Option 4 contains a total of 80 parking stalls. This compares to 91 stalls in Option 1, and 82 stalls in Option 3. The difference in stalls between Options.3 and 4 is due to widening of the drive lane at the north end of the lot, which caused two stalls to be removed from the center area. The size of Option 4 is very close to Option 1, with Option 4 only approximately 350 square feet smaller. This is due to the fact that the lot in Option 4 is four feet less wide than Option 1, because of the angled parking. Our letter of March 11, 2004 showed that the estimated costs for Options 1 and 3 were very similar. While a detailed cost estimate has not been prepared for Option 4, the cost would be very similar again to that of Option 1 or Option 3. Size(sq ft) No.Stalls Parking _ Traffic Flow Cost Option 1 31,977 91 90 degree Two-way $127,545 Option 2 37,130 96 Angled One-way $138,083 Option 3 29,318 82 Angled One-way $127,067 Option 4 31,650 80 Angled Two-way App. $127,500 If Staff and Council prefer Option 4, we would recommend it be constructed an extra four feet wide, which is the width of Option 1. That would give the City the option of striping the lot for either angled parking per Option 4, or 90 degree parking, per Option 1. The cost difference for constructing the lot this extra four feet wide would be minimal. Please feel free to contact me at 651-604-4803 if you have any questions regarding Option 4 or wish to discuss the Lakeside Park parking lot further. U a� � X10 n U N___ - (1.) U + U NJ + _, _i_, + 4-- U Qp U L+- U n O 0--) � cd � O O � U U U n O Z U U U --, U O O (0 z u X u _a n ( I— LL z 12) I— o Q p- m X X X X X Xc a �eit�e��c ���� .�-__�-�.�-- z s+___L-rr-^-c�n---ZcT-�-L�rv-CZT"'Z� h• . „. %D ../D j D.. /D . /D %D . 1 D i D /D _ 1 r, _ /D _ 1 D ,D i D 4 L ••'. . . A;,�` • w. ._y_`- mss A . • = k-C, -' s Y..tr�• 1 . JI t . a 1 o AI IL'1 r ♦� .syr c>. 1,...Trr "-�` .1.- T„, "-� 1.„...• 1 1 I isle. 1 , 1 1 I 1 I w a I D I "->s• at 1 D 41,1.: CI,i{. 1 •1-'_J i d T_J L�i 1 „` Tr, w • Zr, x `•• AI ''II 1 N I +c a r� Tr�,. • I" 'A k, 11 Ij' y Q '‘.-ml'_,..i \ zr✓ •I • r\ w . V'IL, K `� z 1 cr MEWtit E------ J F--- j O Z \---- J • -----> Z � . ••I z r-' Wield rj :'41 Ci 1 , ,. Lt% .. . .. s 1 ,1 ni ,,,,,- ,.,, ,, ____ I X ,jt -7 J_ _ Y 1....T. ...i A L L T 1. -152.4'- �� . _ �wr . rI 1111. N 1�•u.1 Tyr D �� 1 1V at MIN �•V/ . D \ 1 • N .11., , j•• -U•. D 11 i<• 1'•• ‹.'J 1 Mr Ce ce 7 II g_ Zp Lu ••-• r•'D LdY r_ DI • zrJ T„i 1 C Ek- L •1 rn tr K C)" C. 1 y J •• 1 .1 ), "• J J Tri * 1 I 1 2 J 1 T, X zr� z, ra. zrl w re li.1-�. T„i "-� I f- - N 1 . A d Y 1 • AI w Tr ti} Tyr to z-' rJ Tti cc 1 g X�111 _ to to C T�'l •1•• .1- 1-'1", to Lee, Greg From: Ulrich, Kurt Sent: Monday, March 08, 2004 3:32 PM To: Lee, Greg Cc: Dazenski, Steve Subject: FW: Shoreview Baseball and Greenfield Greg, Please share this with the P & R Commission. Thanks. -Kurt Original Message From: McIntyre, Marta Sent: Tuesday, March 02, 2004 11:03 AM To: 'Daniel.Marcouiller@allina.com' Cc: Lee, Greg; Dazenski, Steve; Steeves, Jeanette; Ulrich, Kurt Subject: Shoreview Baseball and Greenfield Dan, I am responding to your attached email. As I mentioned before, our policy on field reservations is on a first come, first serve basis. This policy was recommended by the Parks and Recreation Commission and approved by the City Council. At this time there are a number of reservations for Greenfield park during the months of April, May, June and July. However, if you would like to make a reservation for any open dates, please contact me and I would be happy to assist you. Sincerely, Marta McIntyre Program Director Mounds View Community Center YMCA 763-717-4036 Original Message From: Lee, Greg Sent: Tuesday, February 24, 2004 3:19 PM To: Dazenski, Steve Cc: McIntyre, Marta; Steeves, Jeanette Subject: FW: Shoreview Baseball and Greenfield Steve, Please work with Marta and Jeanette and provide a response. Thanks Greg Original Message From: Marcouiller, Daniel [mailto:Daniel.Marcouiller@allina.com] Sent: Tuesday, February 24, 2004 2:59 PM To: greg.lee@ci.mounds-view.mn.us Cc: kurt.ulrich@ci.mounds-view.mn.us; ABorgos@itwbgk.com Subject: Shoreview Baseball and Greenfield Greg, I am representing Shoreview Area Baseball which provides baseball to all youth ages 7-15 residing in district 621 boundaries. Approximately 100 Mounds View residents participate in our program. In the past we had been granted use of Greenfield park two nights each week for our 14 and 15 year old teams as this is the only full-size "regulation" field suitable for games in the City of Mounds View. Our usage begins in early May and continues until the end of July and is shared with the Irondale Baseball League (IBL) , the only other organization that contains Mounds View kids. We have been told in the past 1 guidelines set forth by your field ; upand securing all i adherence to the strict g lockingt lant in our the field after use, locking history has shown that we were exemplary regarding grooming equipment, department theg clean. I believe our p n facility city' s facilities. mai and keeping your equipment, to be good stewards of our organization at III. t Shoreview Baseball ht dates available for and to no weeknight the dates were given out to IBL I was informed that there are given is that granted access at Today this summer. Then askedeon who, I was told Blaine baseball was Greenfield groups. When hAs I have " teams that are not associated with anyIII "outside "independent suprised to hear of this. some I was quite playnear home this Greenfield asni well as some otheropportunities for organization. Needless tsayouthat will not beable lto ants formal be View kids in usedr program roups that do not provide articip noted we have Mounds by g opportunities for all that do not In addition, losing a field limits opp ovet these g season because the field is beingwe should have priority Mounds View kids.Our belief is that in our program. include Mounds View kids. liasion to the Parks and we would still hope tuse on listed as the city this to you because you are forward to our I am sendingbeautiful field that Looking Chis thissiGreenfield especially is a given our past history. Recreation hts season, especially some weekniThanks. response. Dan Marcouiller 0) 651-635-4415 h) 651-780-5923 ed. Unless you are T be confidential and privileg copy or you may noteuse, have thehs e contains(oruinformationried that mayl e-mail and delete the e or any information containedreply in the message. If you (or authorized to receive for the addressee) , by addresseeanyone the message disclose to e in error, please advise the s received the message message. 2