Loading...
HomeMy WebLinkAbout07/28/1999 Agenda & Packet • MOUNDS VIEW Parks and Recreation Commission July 28, 1999, 6:30 p.m. City Hall Agenda 1. Call to order .Frank 2. Approval of minutes Frank (Exhibit A) 3. Oath of office—New Commissioners Mayor Dan/Terri 4. Silverview trail update Terri 5. Park dedication priority update Terri (Exhibit B) • 6. MVCC/Recreation update Terri *(Exhibit C) 7. New ideas9 ..Terri 8. Other business 9. Next meeting: August 25, 6:30 p.m. • Available at meeting THANK YOU FOR CALLING IF YOU CANNOT ATTEND (612)717-4042 11111 MOUNDS VIEW Exhibit A • Parks and Recreation Commission June 23, 1999 6:30 p.m. Minutes Commissioners present: Sherry Gunn, Frank Silvis, Gary Stevenson, Stan McDonald, Dave Long, and Rob Marty (Council Liason). Commissioners absent: Mary Benz Pam Starr has resigned the remainder of her position on the Commission. Staff present: Terri Blattenbauer(YMCA) and Steve Dazenski (Park maintenance). Meeting called to order at 6:33 p.m. at City Hall. A motion was made to approve the minutes from May 26 by Sherry, with a second to the motion by Stan. Terri updated the Commission on the status of paving Silverview Park trail. Terri and Sherry attended the Council work session on Monday, June 21 to inform the council and 1110 to deliver the Commission's recommendation to proceed with bids on this project. The council was in favor and staff will acquire information for the July 26 Council Meeting. Gary mentioned the importance of discussing with the Scotland Green apartments the potential changes that may incur due to the construction to Silverview trail. Issues such as the movement of playground pieces, and access to the trail through their parking lot, should be discussed and in writing. Discussion on the other two trail pavings; Woodcrest to H2 and along Silver Lake Road, continued. Steve and Gary drove to the sites to confirm the locations. Steve will continue to work on the feasibility and boundary issues. Stan commented that there is enthusiasm from his neighborhood on the action that is being taken. The Commission was informed that keeping the playground equipment at Woodcrest Park was not official. The City Council had discussed the potential of moving it to higher ground in the Northeast corner,however, would still take a recommendation from the Commission. Sherry made a motion to forward to the City Council,the movement of the Woodcrest playground equipment to Random Park. Stan seconded. After further discussion, Steve informed the group of some safety standard concerns, as • well as placement and fit at Random. • After the concerns were mentioned, Sherry made a motion to table the movement of Woodcrest playground equipment to Random, and for staff to acquire the schedule of proposed changes to Woodcrest, i.e. equipment, ponds, aggregate path, building removal, etc. Gary seconded. The Park Dedication plan priority items were discussed. The following is an update resulting from the June meeting: Item Ranking Status Changing space/showers 1 Construction: Plumbing: $29,500 Inspection: OK The Commission believes that this is a critical enhancement to the Community Center, and believes it should be a shared expense with a City funding source as well. Sand VB court lighting 2 $7,390 Gary made a motion to approve the volleyball court lighting at City Hall and to proceed with bids. Sherry seconded. • Pathway along Silver Lake Rd. 3 Steve will explore Feasibility and Provide plan. Drinking fountain updating 4 $5,000 Hill,Gre,Gro,CH Gary made a motion to approve the repair of four drinking fountains (Hillview, Greenfield, Groveland, and City Hall parks),with an urgency to the City Hall fountain. This repair would update, and ease maintenance. Dave seconded. Pathway, Woodcrest to H2 5 Steve looking into Boundary issues. Backstop net additions/changes 6 Photos with drawings sent to Beacon Ballfields for cost est. Retro-fitting park bleachers NEW Updating needed for Codes. Approx. $2,000 ea. Dave made a motion to remove the bleachers at Lambert,Groveland, and Hillview • Parks. Retro-fit City Hall and Greenfield immediately, and inform City Hall that regulations exist, and currently we are not compliant with Minnesota state law. Sherry seconded. Disc golf replacements had been discussed at previous meetings. After receiving further information, they seem to be missing chains, which can be replaced. Staff will explore cost of replacements. The concepts of relocating 3 of them, and also locking down stands, similar to Roseville, was also briefly discussed. A refrigerator has been donated, by a resident of Mounds View. This will be placed in Multi-C, which is also the Senior Lounge. Other items that remain on the list are: Border Patrol, Virtual Golf, Market research, and bridge over Hwy. 10. It was decided that these items would remain on the list with possible discussion for future. Staff updated the Commission on the MVCC and summer recreation. Program participants for Summer Playgrounds is approximately 175. Other programs are underway, as well. A summer program summary will be available at the July meeting. 1999 budget projections for the Community Center was shared with the Commission. It was a report devised for the City Council. If revenue continues and expenses are controlled,there could possibly be a$22,000 surplus for the Community Center at year end. There was brief discussion on the Silverview pond Management plan, which was a study done in 1994. A copy will be sent to Cliff Ash, a resident on Lake Court Drive, concerned with the lillie population on the pond. More clear answers as to the definite rulings will be sought. In other business, Rob and Stan will be absent next meeting. Rob will ask Mayor Dan to sit in for him. Meeting adjourned: 8:30 p.m. Next meeting: Wednesday, July 28, 6:30 p.m. at City Hall • Exhibit B • MOUNDS VIEW Parks and Recreation Commission July, 1999 Park Dedication Update: Item Ranking Next step Changing space/showers 1 Council work session $111,300 August 2 VB court lighting @ City Hall 2 Council work session $7,390 August 2 Pathway along Silver Lake Rd. 3 Steve D. acquiring Cost and plan Drinking fountain updating 4 Council work session Hill,Gre,Gro,CH August 2 $8,000 • Pathway, Woodcrest to H2 5 Not feasible—due to Soil correction& Mitigation. Backstop net additions/changes 6 Additional piece Along 3rd base line $310. Acquiring new net cost. Retro-fitting park bleachers New Bleachers removed CH& Gr. Approved $4,000 TOTAL: $71,040 (Includes VB lighting, drinking fountains, and V2 the cost of the MVCC locker rooms) • MOUNDS VIEW • Parks and Recreation Commission Terri Blattenbauer- Staff Frank Silvis—Chair MVCC 2237 Oakwood Drive 5394 Edgewood Drive Mounds View, MN 55112 Mounds View, MN 55112 (612)784-4587 h (612)717-4042 w (612)782-2759 Gary Stevenson Mary Benz 2847 Arden Avenue 8335 Sunnyside Road Mounds View, MN 55112 Mounds View, MN 55112 (612)784-7336 h (612)784-1004 h (612)671-3751 w Stan McDonald Sherry Gunn 2552 Moundsview Drive 8120 Red Oak Court • Mounds View, MN 55112 Mounds View, MN 55112 (612)786-6314 h (612)786-5588 h Dave Long Rich Sonterre 7749 Knollwood Drive 5060 Red Oak Drive Mounds View, MN 55112 Mounds View, MN 55112 (612)784-1349 h (612)717-0416 h 3&c-3325" Cc,l1 - Theresa Lexcen Dawn Little 5229 Jeffery Drive NE 7658 Greenfield Avenue Mounds View, MN 55112 Mounds View, MN 55112 (612)786-5079 h (612)785-1810 h Rob Marty—Council Liason 2626 Louisa Avenue Mounds View, MN 55112 (612)780-8876 h • Projected 1999 Savings General Fund Recreation Recreation 1999 budget 98,795 Actual thru 6/21/99: Actual outlays 50,691 • Less severance pay (31,866) Adjusted actual 18,825 Estimated 6/21 - 12/31 37,000 Projected outlays - 55,825 Projected savings 42,970 General Fund Parks, Forestry &Athletic Fields 28,000 Total General Fund 70,970 Recreation Programming At this time in 1998, the Fund had a positive net income of$11,000, but by year end, had a loss of$11,000. For 1999, the Fund had positive net income of$15,000. • Due to monitoring of the programs offered, it is projected maintain a positive income for the year. Community Center Thru Estimated 6/21 1999 Revenues Children's Home 16,283 35,000 School District 25,500 51,000 Gym rental 9,481 17,000 Banquet room rental 11,771 30,000 Catering commission 1,207 5,000 Vending 1,558 3,500 General Fund Transfer - 50,000 General Fund savings - 70,000 Miscellaneous 259 500 66,059 262.000 Outlays 89,199 220,000 Estimated profit(loss) (23,140) 42,000 Equipment Replacement Fund • Reserve funding (20,000) (20,000) Net (43,140) 22,000 MOUNDS VIEW • Parks and Recreation Commission June, 1999 Park Dedication Plan Item Ranking Status Changing space/showers 1 Construction: Plumbing: Inspection Sand VB court lighting 2 $7,390 Pathway along SLR 3 (Steve—update) Drinking fountains H,Gr,Gro,CH 4 (Steve—update) Pathway, woodcrest to Cty.I 5 (Steve—update) Backstop net at Greenfield 6 Photos for Beacon Outdoor BB courts In progress Silverview trail paving In progress • Continued Discussion: Border patrol Curb stop and water fountain at CH Picnic table replacement at Ardan Park Disc golf replacements (6 @ $350 ea.) Refrigerator at MVCC Virtual golf Market research Path paving at Greenfield Bridge over Hwy 10 New: Retro-fit bleachers • Lc.4 K e c 1 i ' -- -t'e-7 \ \ \ -57 —40 Al W r.. 0 P N • -C. S J,r,»o 3 C. c X , N c`(e --,- -1-L r • 1 CM OF i • (DUBS Phone: (612) 784-3055 • Ql� j, Fax: (612) 784-3462 "Quite Simply the Best" October 5, 1993 Good Day: This letter is to confirm the City's intention of continuing the practice of mowing one swath on either side of the Silver View Park path on a weekly basis, weather and soil conditions permitting. Other areas of the grasslands between the path and the pond will be mowed on a less regular basis depending upon the weather and soil conditions. After reviewing the pond study and walking the path with members of the Parks and Recreation Commission, I have been reminded that grasses should be left be grow to serve as a habitat for wildlife. The Commissioners were very dismayed to see the area mowed all the way to the pond in front of the Manor homes along the path, in the area of the bench. The Parks and Recreation Commissioners recalled the • direction for grasses to remain longer in these areas to provide a fertilizer runoff filtering process as well as provide a habitat for wildlife. It was the direction of the Parks and Recreation Commission that I write this letter to remind the homeowners of this intention for the guidelines for upkeep of the nature areas of Silver View Park pond and trail. It was also the request of the Commissioners that I remind the homeowners that the nature of the pond and trail area is to remain nature-like atmosphere to provide an out-doors woodsy and prairie-like appearance. Well groomed, yard and lawn-like manicured grounds are not the intent nor the expectation of this nature area. Unfortunately many residents of Silver Lake Woods Home Association continue to corner our Parks Maintenance staff requesting maintenance which is contrary to the direction given them. Please understand that the crew is following my instructions regarding maintenance procedures as directed by the Parks and Recreation Commission, who has followed the recommendations of the Environmental Studies report and the Silver View Park plan as completed by task force members. The maintenance standards have been established for the natural • appearance of the pond and trail area of Silver View Park. As you know it is difficult to please everyone. Everyone has /1URE0 wm� �� ISOVINK�_ 2401 Highway 10 • Mounds View, MN 551 1 2-1 499 411 individual standards, objectives and desires . . . even when it comes to use and maintenance of a park path. It has been difficult to coordinate the requests of all the interests of Mounds View. We are doing our best to meet the needs of the community as a whole, making a standard of maintenance that is both feasible and consistent with the natural theme of the pond and trail portion of the park. Sincerely, Mary Saarion, Director Parks, Recreation & Forestry • cc. Parks and Recreation Commissioners Parks Maintenance Crew 111 I,Z9ZaFP.. `�• l N X rvzv ! 2,9 .1 cV VN{ 21 N; n� N ISZfry! ) f � e , 80 1 in i et { M i N €N€ 'NI N Ni N 2 1 N OZSZ inul; � � in,' 1 t1ct� jr� • tti C I9£SZ 9 N N N[ N i N Na . f: N. to t to 111, 6 O` t!7 ..... ( .. ._... .. . ........ . . . . . 0d02i 3>IX1 LJrAcil 049Z19( ( S! £S9Z 't.','9' z': �__ 0992 St id 9 , . 999Z \999Z'• : cce p _ ^ aQ WJ. Q ••••_.. : • \ 099Z ;sO9 OOOMN33b0 909Z So ZBSZ 4992 .__ 019Zi --_ ,�.. .i ( 6092 Q9Z O19Z 6 • 3 A7ks•. .tr l9Z•�,96SZ mg tit 8S9Z £l 9 $193 l9Z ltr 9Z £i V ;,----Q �^w_ o} `' - ` `i::: ` •` -` : :.:::•: 1992 T' IL l9Z S l9Z IL l9Z >S l9Z L l 7' L l9Z ''` 0 a9Z;' OS9ZJ r lZ9Z ZZ9Z LZ9Z ZZ9Z Z k09Z>r } '.,, Z99Z i'99---Z 1QZ9z 9Z9Z SZ9Z .. .._ �' 9104 9Z __ ---------.4----- 9Z9Z,SZ £992 !~�` `~flZo, 0,4 ----• 9tr9Z 6992 0�99Z sfiZ9Z 0£9Z 6Z9Z_ 029_Z 6Z o} tr9Z`ti. . Z99Z t _ _ SS9Z 0} Z.t9Z Z£9Z . tr99z ££9Z 1,£9Z £'9Z tr£9Z, £ 6£92 _ tL£9Z L£9Z h? 1692 i���e►,►`t Z99Z L89Z �__cn 8£3Zw 89Z;Lc1Z 41, 01 1.,1 o} • • • • LL9Z itr9Z O'Ztr9Z9Z Ztr9Z _ 9tr9Z �} j £bLZ`r'ZZLZ 0.` �``_� 9692 iLt IStr9Z 9tr9Z tr9Z o 9tr9Z'S•$ o} f o} #. trL9Z _ 6tr9Z OS9Z tr9Z OS9Z 61, 5£LZ;6lLZ,�' tr9� I _----i----•—• '--•O- 1,' '. N N t N tr99Z , S9Z N j 0692 �n 1 �n ,` 969Zo} o} �` O'd0�i ,� . .•QLZ S 0$92 "r'j� N •• N 2 N i to N 1 N ; (��): N, N i• f d ` ►rj Mid to to�,..In In �; _ ...,p �t �} #n st Mt M 00 Ns tD O' `'t ,i_ 3 N; t0IOI f�,fN ni �i 0 : Cp ; t .d- N • Mt M` M , N N` N ' N1 N { N N ( Ni N Mr"•- i� tOtrLJ trLz Z ' i� 0 BZcz 7) in I ^ ^in i 10- int li n t i 'i L SOtrL 1.SLZ �SLZ 1£L add tV 9£LZ€ N i ^ 1 r. La.- _• • • trL > _6L .9LZ g£L SL trtrLZ' aQ N t t N c4 ltrL LLZ DOLL ; M� S£L �- • � �� X1.1 M31A >{2l'd c;~.- F( ,n O ? . MO•)i cot ►Qj# M{ M1rs: 60 MyM• xc.... • ^® ��" I� I f.0 , i f.1 N I r.....1, h i h s l.- @fes 1ls —8 OVOI 'i 1 N ,c,tNsOi N tOiN'�F eh i N i o! Oo i O ' O i O ' d•j Do' C� co CA 3 0 0 ,,o, 0 1M 1M{ t 1092 e� •r ; .r;o : p , Q, N 1t N s �' et ttn�in4�nt {�iiAtINA f ^ { # �i eh eh 1 M M I 'll M, M ..... ...._l -i 1 cein_►.;►.sn,r"�.I� r.... .., 1,11... ; { N N tn, N.I • { € n ! s ! 6082 `8082 1 ) ( $082 00 �09Z 91821 cmc 4 'c' L l8Z Z i ! --�____ • . • , _ _ eta Aquatic Plant Harvest Potential Futw• Pond lace ons M111Y Reduced Mowing/Nest Cover Planting ` `` \ ®: :: du :°:' ng • 1j 06::. c%,$/z \\7+ oouax I V Ny1,t. <O f ...,.i ,• \..........„.. ... CD 4:i :: "...:.. _, 0 , 'f\ = .,e •,` .Na \ .111 4.i h v. 0 '1, Ij'7' e 4, r dio I ..,..., NI pt, sei .r1-0-0a ___ c- ii.„;,,t,/ Li q� —`-� `\A FI '.i 7, . v\ +( .14.1IOraim g• Area Boundary a:, Vii el • • — `�'t'+ , _ rll�--^--!! (— outlet Struetur• 11_�flv ( 1 J I I cc a . -..„,5-as m.,AN010 wg;.:,c... r--f-fiii[J, 1 .. 1 1 `rel L . ...,,•$-:,.. ft lc- �i �--,, f 1f !, ,_^ --- County RooO H-2 1 i i ' , 0 '.•200 400 It Ill Figure 9 MANAGEMENT RECOMMENDATIONS 90 We have investigated the practicality of contracting for commercial aquatic weed harvesting service for these portions of Silver View Pond. Commercial harvesters we contacted generally indicated that the acreage to be treated within Silver Lake Pond was too small for normal mechanized harvesting to be undertaken . Per hour costs for harvesting service are normally $90 to $100/hour on harvesting projects requiring a week or more . Since harvesting of Silver View Pond with normal , mechanized means would take less than one day, it would not be economically feasible to bring in weed harvesting machinery for so short a period. Also , weed harvesting machines require excellent access facilities (preferably a concrete ramp) to gain entrto waters to be harvested. Since Silver View Pond doesynot the have such facilities, it appears that lack of access precludes the use of such heavy machinery. An alternative to normal weed harvesting techniques which winchrands ocablere systemusedtoencircle suitable for small projects is a bemple harvested. This method could be carried out e abyaCitye maintenance personnel or by a private contractor. It is important that any personnel handling aquatic plants wear rubber gloves due to the high likelihood of contracting swimmer's itch . Harvesting should be undertaken up to twice the first season ; once in June and again if and when the macrophytes have shown substantial regrowth . Since the sand pond substrate is not highly conducive to macrophyte re- establishment, future harvests probably can be undertaken with decreasing frequency. Harvested macrophytes can be composted and used as a soil additive in agricultural , garden and horticultural applications . This method has been successfully been utilized in Massachusetts as an alternative to landfill disposal of harvested macrophytes . B . Wildlife Habitat Measures • Reduced Mowing There are a number of upland areas adjacent to the pond which could provide improved upland nesting habitats for waterfowl if mowing were substantially reduced. Potential areas for mowing reduction are shown in Figure 9 . Such areas should be mowed once every 4 to 5 years to hold back encroachment by woody vegetation . In addition to improving nesting habitat , reduced mowing would also reduce the pond' s attractiveness for Canada Geese , thus helping to forestall problems commonly Fssociated with large goose numbers . Also, any artificial feeding that might be occurring on 91 • private lands around the pond should be discouraged so as not to delay geese during migration. 2 . Upland Nest Cover Plantings .47Upland nesting cover would be further enhanced if some areas of dense, native grass cover were established in close proximity to the pond. One potentially suitable .area would be the the large hills at the south end of Silver View Park ( see Figure 9) . Dense nesting cover would also act to minimize erosion on these steep slopes . Seeding of such material is not proposed in the immediate area of the park' s amphitheater, since it would be incompatible with heavy human use . Also, if such seeding were done around the in place landscape plantings, mulching around the bases of trees will be necessary to prevent grasses from competing with the trees for moisture . Again, any areas seeded in this manner should be mowed every 4 to 5 years to minimize woody competition. Prescribed burning is normally the preferred method for periodically rejuvenating such stands ; however, this method may not be compatible in the area of the pond. • 3 . Additional Nest Structures There is presently one wood duck nesting structure on Silver View Pond near the junction of the three arms . At least two additional structures could be reasonably added, preferably one near the south end of the south arm and another at the east end of the east arm. If possible the existing structure should be relocated to the west end of the west arm . In this manner, the nesting structures will be placed to be as far apart as possible , providing the hen wood ducks with ample space to nest and raise broods without interacting with each other . Wood duck nest structures should be placed in sheltered areas to blend in with existing trees . Other types of nesting structures , such as purple martin and/or bluebird houses , might also be considered to maximize the interpretive value of the pond area. 4 . Monitor Canada Goose Use and Prevent Nesting Canada goose use in the pond area is already high and is likely to increase in the future . In order to reduce the likelihood of future goose problems , goose use should be monitored to determine if deterrence or control measures should be undertaken. Of particular importance is the need • to prevent goose nesting on the pond, since any goslings produced will return to the same location to nest themselves , thus aggravating any problems that may arise . Should geese begin nesting , the Minnesota DNR Area Wildlife Manager should be consulted on deterrence methods . 92