HomeMy WebLinkAboutCOMMISSION_MINUTES-1986-12-05P
:, .�1
CALL TO 0&DER
ROLL CALL
4INUTES OF THE PROCEEDLNCS OF THE
2K5 FUNUING ALT6RNA'fIV65 TASK FORCE `
CITY'OF M011NDS VIEW
CO�NTY OF RAMSEY
STATE OF MINNESOTA
December 5, 1985
Mounde View City Hall
Council Chambere
7:00 p.m.
The meeting was called to order inEurmally at
7:05 p.m.
Task force members present: Linda Pavek,
Neal Valley� Fred Kaiser, Barb Depev
Park b Recreation Commissioners present:
Uiane Wuori, Frank 5ilvis, Ed Letendce, David
Long and Chairperson Wayne Burmeister
Councilmembers present: Mayor Jerry Linke,
Councilmember Gary Quick
Staff preaent: PaCk� and RecCeation Director
Bruce Anderaon
INTBODUCTIONS Introductiona were made around the room
�" including community service groups and/or
agencies that each individual migh[ represen[
" se well ae a brief review of each individuals
family background.
COHMUNITY CENTEx/
NATURI►L ICB &INK
Staff reviewed a memorandum that war� distri-
bu[ed on December 4, 1985 regarding the
feasibility of constructing a recreution
activity center at Silver VieW Park at a dol-
lar amount not to exceed $JSU,000. The
potential pla� proposed by atafE was a 33�OOU
sq-uare foot ehelter building vhich would
house a naturaf iee arena. pu611c eeetrooma.
genera2 aeating area� pru shop� kitchea
facilitias end coneession area. StafF had
met with two c�predentativee� from pre—
fabTiCetad 6uildiogs; one repreaenting Cedar
Foceot Producte� and the secnnd representing
8utlec building. a eteel scructure. Both
repTeeentAtivas indicated that a building
eimtlee to Htaff'e deeire could 6e construct-
�d vithin thu dollar amount allocated.
�.✓
-2-
There were a number of questions raised by
each of the individuals in attendance ranging
^''� from the need for such a facility as well as
� possible programs that might occur at the
facility. 5taff elaborated, indicating that
the facility could serve as a year round
Eacility saith Che sides coming oFf, thus
becoming a open air picnic shelter in the
summer time. At [his time, an extensive com-
munity survey had not been completed regard-
ing the demand for the facility other than
informal meetings with repreaentatives from
Lake Region Hockey who indicated they would
be very supportive of. such a facility.
�
GENBRAL PARK
`'IMPROVEMSNTS
�..F .�.: ...
��/,
Possible programming activities includerent-
ing the facility out to large community
organizations, exhibite, ar[s and ceafts
shows, community festivala such as Featival
in the Park, band concerte, roller akating,
roller hockey� indoor tennis. indoor floor
hockey and comm�inity fitneas areas.
Staff indicated that et this time, he did noc
have all the anr�wers but rather was looking
for conceptual apµrovel with additional
detail informatlon to follov ers time permlt-
ted. Staff fur!her etatod that Ne also had
eome heeitance regardin� conetructton of euch
a large facility r�e no erchitect had been
consulted at thte tlm� and hr rerommended
that some-dolJare be allocnted tor a consul-
tant to review Che renderinge Ue they were
prepared by Cedar ForeeC Producte� and �utler
Ruilding.
The group provided a etcong general concen-
sus to the projecc and directad etaEf to con-
tinue getting iaformation on the project.
Staff revieved r. liet of proposed perk
improvements t�taling $796,UU0 and indicated
thac ie vould be etaEE'a d�airn to reduce
Ct�is amount by a miniinum of $30U�UUU eo that
the park reEerendum wuuld nut exceed $1.25
million. There wae lengthy dtsc�xaton on
thia ieeue, with Cl�e fnlloaing iteme being
cut oc reduced:
A. The auxillia�y buildt�g at Silver Viev
Park wae reduced Co $3U,ODU.
B. Tree and landscaping in thi• amuunt nf
$SO,ODO was eltminated.
C. Picnic tablea were reduced to 7U tabtes
at a savings of S10,SUU.
�
-3-
D. The security Lighting on
;� � tem was eliminated at
�- � $60,000.
E. The VITA trail at City Hail
ed a[ a cost of $1U,000.
�
the trail sys-
a sav3ngs of
was eliminat-
F. The two multi-purpose courtb at Lambert
and Woodcrest Parks were eliminated at a
i; savinga of $40,OOU.
i
t. ,
i
E
i.,;
t
9
�
t�
;•.
�,,..
€,
PERMAN6NT PARK
HAINTENANCE LEVY
; ,�---4,.
";
;,-.�
'GSNBgAL DISCUSSION
G. The archery range wns eliminated at a
cost of $tS,UOU.
H. The cost for Che building structure was
also reduced to $650,000 or a reduction
of $100,U00.
Total proposed reductions are $308,500.
Staff indicated that they would provide a
formal list of items to be considered for
referendum at the December 12 Commiesion
meeting.
StafF proposed that a permanent one mill Levy
be dedicated for park maintenance to operate
and maintain existing park lands and related
public recrea[ional facilities including the
proposed improvements. StafE indicated tha[
this would raise an additional $56,000 and
double`our existing manpower which consists
of two full-time indivfduals.
It was the conceasus of the group that this
also made logical sense and should be
"wrapped" into tae entire park question if
possible.
It was the general concensue of the group
that the referendum should not exceed $1.25
millton and that a target date of January 21,
1986 ehould be agreed upon for the proposed
park referendum should the City Council con-
cur with the task force position.
NSXT HSSTING DATE It wae agreed that one additional meeting
would be acheduled for Thursday. December 12,
1985 at which time we would review the Einal
figures as well as discuss any updated items
, regarding the recreation activity facility.
Y8LK1
BNM�*!? ��`1 The meeting was adjourned at 10:20 p.m.
�tfu�l����u,t��i�ted,
� �. � ��/: � � %.'� t
I�it: tle,reon Director
, Recr�'Btiop and Forestry
%
/'Y4.� . ' '�., :