HomeMy WebLinkAboutCOMMISSION_MINUTES_1989-06-22I
MINUTES OF THE PROCEEDINGS OF THE
PARKS AND RECREATION COMMISSION
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
June 22, 1989
6:30 p.m.
City Hall
Council Chambers
CALL TO ORDER The meeting was called to order at 6:38 p.m.
by Chairperson Wayne Burmeister.
ROLL CALL Commissioners present: Burmeister, Long,
Silvis, Starr, and Stevenson
Commissioners absent: Trettel
Councilmembers present: Mayor Hankner
and Councilmember Quick
Staff present: Director Saarion, Adm. Asst.
Linke and Student Intern Johnson
Visitors:
Glenn Hammond, 2146 Oakwood Dr.
Dennis Nusser, 2201 Hillview Rd.
Virgil Kinnunen, 2132 Oakwood Dr.
Richard Kops, 2147 Oakwood Dr.
Gary Wax, 5651 Cornell Dr.
Carole Golden, 7417 Parkview Dr.
Cindy Huro, 2146 Hillview Dr.
Rod Melbo, 5601 St. Michael St.
Jerry Linke, 2319 Knoll Dr.
Marlin Grant - Mary Anderson Const.
8901 Lyndale Ave. So., Bloomington
Jim Smith, 7427 Parkview Terr.
Connie Miller, 2138 Oakwood Dr.
Randy Miller, 7409 Parkview Dr.
Dave Lhotka, 2656 Lake Court Dr.
Dave Rademacher, 7421 Parkview Dr.
Clifford & Milly Ash, 2664 Lake Court Dr.
John & Mary Larson, 2568 Moundsview Dr.
Robert & Rita Dymanyk, 2696 Lake Court
David Bjork, 2698 Lake Court Dr.
Gary & Debbie Jones, 7405 Parkview Dr.
Lois Hansen, 2228 Oakwood Dr.
APPROVAL OF MAY 25 MINUTES
AGENDA ADDITIONS
SILVER VIEW PARK
PICNIC SHELTER
-2 -
A motion was made by Commissioner Silvis,
seconded by Commissioner Stevenson to
accept the May 25, 1989 minutes as written.
The motion passed 4 ayes, 0 nayes
(Commissioner Starr was not yet present).
None
Mounds View Lion's Club representative Jerry
Linke reviewed plans for a picnic shelter at
Silver View Park with the Commission. He
stated that the Parks and Recreation
Commission proposed the site for the shelter
on the south end of the parking lot. This
area is intended to be "family recreation
area", having the amphitheater, multi-purpose
court, proposed sandlot volleyball court and
tot lot in addition to the picnic shelter.
Mr. Linke explained that in the park shelter
plans, the Lion's have proposed to include
roll up type doors, a small serving area, two
bathrooms and a fireplace. He added that
the plans would possibly be scaled back if
bids come in too high. He stated that it was
designed to be as vandal -proof as possible,
with construction being of rock faced
concrete block with a concrete floor.
This picnic shelter would be the first facility
in the City parks to offer indoor toilet
facilities and a kitchen area. This facility
offers the residents more than adequate
facilities to hold church picnics, family
reunions, company potlucks, Sr. Citizen
outings and other community affairs.
At this point, a motion was made by
Commissioner Stevenson, and seconded by
Commissioner Long to recommend to the
City Council that they accept the plans, when
formally proposed to the City Council, for
the Silver View Park picnic shelter as
proposed by the Mounds View Lion's Club.
The motion passed unanimously, 5 ayes, 0
nayes.
-3 -
Before the Commission's vote, a lengthy
discussion involving resident's comments
ensued.
Many residents expressed concern for the
possibility of greater vandalism because of
the picnic shelter. Commissioner Starr stated
that the location on the south side of the
parking lot was highly visible and easily
accessible by the police and that it shouldn't
increase vandalism, but could actually
decrease it due to greater lighting.
Mr. Lhotka from the Silver Lake Woods
Association asked if the police department
had reviewed the proposed plans and site
plan. Chairperson Burmeister read a
memorandum from Chief Ramacher stating
that, in his opinion, the addition of the
picnic shelter would not cause added
incidence of vandalism in the park and that
the police department would be able to
adequately patrol the area.
Resident Carole Golden had concerns about
consumption of beer in the park and asked if
the Commission or Council had intentions of
legalizing it. Commissioner Burmeister stated
that there is currently an ordinance
prohibiting consumption of alcoholic
beverages in City parks and that there is no
intention of changing the ordinance at this
time.
Lion's representative Linke went on to state.
that the Lion's may want to add other
amenities to the park in the future. He
stated that they could possibly "adopt" Silver
View Park as a project. Residents expressed
concerns that the Lion's were giving the
funds with "strings attached". Mr. Linke
explained that the Lion's must appropriate
their funds acquired from pull tabs in
accordance with Federal law. Had they not
committed the $751000 for the picnic shelter
building, the club would have had to give 50
percent of their earnings to the Federal
government.
-4 -
Mr. Linke further stated the project was
originally proposed as a Celebrate MN grant
application. A public hearing was held to
choose a project. The City Council chose the
Silver View picnic shelter as the number one
project.
The City approached the Lion's requesting a
contribution of matching funds for the
construction of the picnic shelter. The grant
was awarded to the City with matching
funds to be paid by the Mounds View Lions
Club. The Lions, however, found that they
were able to contribute far more than
originally proposed, so the Lion's Club Picnic
Shelter Committee came up with the plans
that were proposed.
Resident David Rademacher stated that he
felt that the City was allowing the Lion's to
set City policy and that they were not
following the original plan. The Commission
reiterated that the picnic shelter has always
been in their vision for Silver View Park.
The picnic shelter was chosen by the council
as the number one project for the Celebrate
MN grant application. A public hearing was
held regarding this decision. The Lion's were
requested by the City to participate in the
project as a matching fund community
organization.
Mr. Linke asked the Commission to approve
the installation of utilities to the picnic
shelter. Chairperson Burmeister explained
that SEH had reviewed the site two years
ago, and made recommendations for sources
of the sewer, water and electricity. This
same plan has recently been reviewed by
both SEH and City Engineer Minetor.
Residents expressed concern with the cost of
the utilities and that the utilities were
brought up without previous notice.
Chairperson Burmeister stated that the
Commission had proposed installation of
utilities at Silver View Park two years ago.
-5 -
Commissioner Stevenson added that it was
more cost effective to install the utilities
during construction of the picnic shelter
rather than after.
Commissioner Long and Director Saarion
explained to residents the progression of park
improvements and the use of the Five Year
Capital Improvement Plan. Director Saarion
also explained the different types of parks
within the City; neighborhood parks,
community parks and regional parks; stating
that Silver View Park was a regional park
serving the entire community, not just one
specific area or age group.
In response to residents request for play
equipment at Silver View Park, she stated
that it was in the Five Year Capital
Improvement Plan for 1992. She added that
all of the other neighborhood parks were
equipped with play equipment. (Oakwood
Park play equipment is scheduled for 1990).
Currently there is no need for additional play
equipment at the neighborhood parks.
Residents expressed dissatisfaction with
maintenance at Silver View. They stated
that certain areas were not mowed. Director
Saarion stated that these areas were natural
areas for observing wildlife, trees, etc.
Residents expressed more concern about the
cost, maintenance and safety of the picnic
shelter. A resident then commented that the
City does not have the option to spend the
money elsewhere and that if the City does
not accept the picnic shelter, that the Lion's
could give the money to another City or
charity. Councilmember Quick re -stated that
the City requested the Lion's to participate as
a matching fund community organization for
the Celebrate MN grant application. The
City chose the picnic shelter as the number
one project. The project was awarded.
M
OAKWOOD PARK IMPROVEMENTS Director Saarion presented overheads of the
proposed improvements to Oakwood Park
including grading, re-establishment of turf,
relocation of ballfield and installation of a
soccer field in the Oakwood Park section.
Construction of a sandlot volleyball court,
installation of tot lot equipment, picnic
tables, grill, trash receptacles and horseshoe
pits were proposed for the section of
Greenfield Park northwest of Oakwood Park.
Many residents expressed the need for a stop
sign on Hillview Rd. and Quincy St.
Councilmember Quick stated that it was
already under consideration.
Resident Richard Kops stated that he was
opposed to allowing baseball teams to use
the ballfield at Oakwood because he feared
that baseballs would be hit into his yard.
Chairperson Burmeister stated that with the
relocation of the ballfield, this should
alleviate that problem.
Mr. Kops still expressed concern. Mr. Rod
Melbo, a MVAA baseball coach, stated that
he coached 11 and 12 year olds and that
they did not have the capabilities of hitting a
baseball far enough to reach Mr. Kops yard.
He also expressed the need for additional
baseball fields in Mounds View for practices.
He added that his team members sometimes
must ride their bikes across Highway 10 for
practice because permits are not given out
for Oakwood Park to baseball teams at this
time and that he felt that his team members
were in danger by crossing Highway 10 and
their safety should far outweigh the fear of
having baseballs go into a yard or possible
breaking of windows. Mr. Kops said that he
appreciated Mr. Melbo's concerns and agreed
that the safety of the ball players was more
important.
-7 -
The discussion concluded with residents
expressing their appreciation of the
Commissions efforts to improve Oakwood
Park and their approval of the site plan as
reviewed..
A motion was made by Commissioner
Stevenson, seconded by Commissioner Silvis
to recommend to the City Council the use of
current Park Dedication Funds to implement
improvements at Oakwood Park. The motion
passed unanimously 5 ayes, 0 nayes.
SILVER VIEW PARK PATHWAY Director Saarion stated that the installation
of the Silver View Park pathway extension
would be delayed until fall, 1989. The
pathway would take about two weeks to
install. Following completion, Forester Rick
Wriskey will meet with residents after the
pathway extension is complete, to discuss
plantings along the pathway for spring, 1990
planting.
Director Saarion reviewed the memorandum
regarding the Engineer's recommendation for
installation of a culvert where the foot bridge
is currently in place.
She explained that the Engineer feels the
culvert would make it possible for
maintenance vehicles to cross that area of
the pond for better maintenance of the
pathway.
Director Saarion asked for the Commission's
direction on the recommendation. The
Commission did not feel that they were able
to give direction at this time.
Resident Gary Jones asked staff what the
costs of the constructing the new pathway
were. Staff stated that material costs were
approximately $1,400 for an ag lime
pathway. Mr. Jones requested the cost of
labor. Staff explained that the labor was
budgeted in the General Fund and was not
figured into the cost.
SILVER VIEW PARK UTILITIES
MVCT REPORT
COUNCILMEMBER'S REPORT
CHAIRPERSON'S REPORT
MAINTENANCE STANDARDS
In
Staff reviewed SEH recommendations for
utilities at Silver View Park. The water
would be brought in along side the parking
lot with a 6" line from the County Road I
main source. The sewer would connect with
the main located at the east side of the park;
the same main currently serving the Manor
Homes Development. The electricity would
come from a terminal located across Silver
Lake Rd. Director Saarion stated that these
recommendations were made two years ago
and recently reviewed by SEH and City
Engineer Minetor.
SEH has predicted the approximate cost of
installation of all three utilities (water, sewer
and electricity) is $33,000:
Water $10,540.00
Sewer 16,033.00
Electricity 5,600.00
A motion was made by Commissioner Long,
seconded by Commissioner Silvis to
recommend to the City Council
approval for the installation of the utilities at
Silver View Park using Park Dedication
Funds to coincide with the construction of
the picnic shelter. Motion passed
unanimously: 4 ayes, 0 nayes.
Commissioner Silvis reported that rehearsals
for the "Sound of Music" have begun.
No report
Chairperson Burmeister reported that the
beach house was 99 percent complete and
that there was some special equipment on
order, such as metal doors and plumbing
handles.
Mayor Hankner asked the Park Commission
if they would be willing to meet with the
City Council to discuss the proposed parks
maintenance standards. The Commission
agreed to meet and asked that a date be set.
la
PARK PROJECT UPDATE Director Saarion reviewed the status of the
park projects and maintenance:
ADJOURNMENT
Respectfully submitted,
Mary Saarion, Director
Parks, Recreation and Forestry
MS/SL
- Eagle Scout, Chad Nelson, is constructing
a sandlot volleyball court at Hillview Park.
- Hillview Park improvements are basically
complete except for plantings which will be
done in the fall or spring.
- Two grounds keepers are mowing and
re -chipping Silver View pathway, with two
groundskeepers doing field grooming and
other maintenance chores.
- Public works employees are working on
many projects within the parks including
installation of benches, picnic tables,
fountains, etc.
Commissioner Stevenson asked that the
installation of park signs be made a priority.
Director Saarion stated that the signs were
currently being installed, that one-half are
already installed.
Commissioner Long moved to adjourn the
meeting at 9:42 p.m. Seconded by
Commissioner Stevenson. Motion passed: 4
ayes, 0 nayes.