Loading...
HomeMy WebLinkAboutCounty Road 10 Trailway Project segments 910Hi County Road 10 Theme Committee Members, A draft feasibility report for the first project of the County Road 10 Corridor Program has been completed - County Road 10 Trailway Project: segments 9&10. This is for providing a multi-use trail corridor consisting of a ten foot (10’) wide bituminous trailway on the southside of County Road 10 from Silver Lake Road to Long Lake Road including pedestrian lighting, landscaping, and connection alternatives to existing public and private property. A copy of the draft report is available at City Hall and will be available on the City's web site shortly (it's big -45MB). This report was presented to the City Council at the August 7th Work Session. It is anticipated that a Public Hearing will be set for August 28th for this project. As a note, the next trailway project planned for the County Road 10 Corridor is segments 1-5 for 2007. This is on the north side between County Road H and Silver Lake Road. The City has secured a federal grant in the amount of $525,000 for this project and the City Council has authorized the preparation of a feasibility report for this project. Other County Road 10 trailway projects are scheduled as follows: 2009 (segment 6; northside, Silver Lake Road to Pleasant View Drive), 2010 (segment 7&8; southside, west City Limits to Silver Lake Road), and 2011 (segment 11; southside, County Road H2 starting at Moe's Restaurant to Woodale Drive). It has been suggested by the City's consultant, BRAA, and recommended by Staff to develop a preliminary landscape architectural design for the entire trailway corridor on both the north and south sides. Then as we initiate trailway projects within the corridor (as is the case with segments 9&10) these preliminary plans would then be finalized. This will insure that the design features, concepts, and themes are consistent throughout the corridor. The proposal to create a preliminary landscape architectural design for the rest of the corridor (segments 6-8, &11) will be presented to the City Council on August 28th. If the Council grants approval, staff and the consultant would request assistance from the County Road 10 Theme Committee Members to help develop the preliminary landscape plan for the corridor. This would consist of two meetings; tentatively scheduled for September 6th and September 20th at 6:00pm (just before the Planning Commission Meetings). The overall preliminary landscape architectural design would then be presented to the City Council on either October 2nd or October 9th. If you have any questions, please contact me. Thank You Greg Lee Public Works Director 763-717-4051 City of Mounds View 2401 Highway 10 Mounds View, MN 55112