Year
2007
2006
2006
2004
2006
2007
2005
2005
2006
2005
2006
2006
2006
2007
2007
2006
2006
2007
2006
2006
2008
2007
2007
2008
2009
2010
2011
2011
2007
2008
2007
2007
2007
2007
MOUNDS VIEW PARK IMPROVEMENT PLAN
Park
Silver View
Silver View
Hillview
Oakwood
Silver View
Hillview
Groveland
Lambert
Random
City Hall
Hillview
Greenfield
Greenfield
Groveland
Groveland
Silver View
Silver View
Edgewood Drive
Greenfield
Oakwood
City Hall
Community Center
Woodcrest
Silver View
Sysco Outlot A
Lambert
Greenfield
Lambert
Groveland
Oakwood
Oakwood
Silverview
Silverview
Silverview
The needs list are categorized into three categories:
A. Maintenance (do now)
B. Budget (budgeted item in the next years budget)
C. Long Term (add to Capital Improvement Program)
Item
Bridge
Ball Field
Rink
Picnic Tables
Parking Lot
Playground
Volleyball Court
Sidewalk
Border
Irrigation
Sidewalk & Parking lot
Parking Lot
Trail
Lights
Pleasure Rink
Lake
trail
Pavers
Lighting
Soccer field
Playground
Parking Lot
Trail
Parking Lot
Parking Lot and Trailway
Building
Parking Lot
Building
Details
Install bridge for disc golf course using Oakwood trail Bridge
Redo Silver View Ball Field #1 and warning track
Resurface rink at Hillview
replace picnic tables - 1
Crack seal parking lot
Replace playground & fiberfill
Re-do & replace standards
replace broken sections of sidewalks
Replace border on playground
Add irrigation system to S, E, and W side
Install sidewalk 8 ft from Hillview Road to Hillview Park Shelter front door
Repair/sealcoat parking lot
Repair/sealcoat
Replace rink and court lights with more efficient fixtures
Level rink area and plant with hardy seed
Develop a proposal to treat the algae a) do nothing; b)barle straw treatment; c) bacterial treatment;
Repair/sealcoat
place colored concrete pavers between curb and pathway on Edgewood Drive
Replace security light with more efficient fixtures
Determine feasibility of small soccer field at the NW corner of Hillview & Quincy
Playground Replacement w/fiberfill
redesign so the front ends of vehicles do not overhang sidewalk; address drainage problem by day care; add storm sewer catch basin and pipe out to Bronson
Paved trail
Resurface
Construct a small parking lot and bituminous trailway on the Sysco Outlot A property - City is committed to spend up to $150,000. Remainder would be Medtronic's cost
replace building-design
Resurface
replace building-construction
Tree remediation
Add disc golf fields at north park to Greenfield
Move playground to southeast corner - New playground
Trail repair (bituminous)
Aerator install in pond
Bridge install
Cost
6000
1000
6533
32000
500
1000
2200
12000
2500
1000
8000
800
2000
7200
28000
5000
24000
31000
30000
50000
378000
20000
50000
230000
5000
24000
Budget -Maintenance/Park Dedication/Other
Park Rehab
Park Rehab
Park Rehab
Park Rehab
Park Rehab
Park Dedication
Park Rehab
Park Rehab
Park Rehab
Park Rehab
Park Rehab
Park Rehab
Park Rehab
Park Rehab
Park Rehab
Park Rehab
Park Rehab
Special Projects
Park Dedication
Park Dedication
Special Projects
Park Rehab
Park Dedication
Park Dedication
Special Projects
Park Dedication
CIP states $120,000 - $60K from Spec Proj & $60K from Park ded
Park Rehab
Last Updated: February 22, 2007
Done?
Temp
Notes
Carried over to 2006 / 2007
Fall of 2006
Carried over to 2006
Carried over till decision is made for park changes
Will be done with street crack sealing 2006
To be done after building completion
with street seal coating
May be part of larger park lighting project
suggested during 2003 park tour
Working with street dept.
This was to be done with City Hall renovation
May be part of larger lighting project
This is being looked into and there may be options, decisions have not yet been made
Medtronic requested $150k Min. Most of area appears to be wetland - need remediation plan first.
PIP Item? Foresting to community plan
in process
2006B Item. Listed above
System from golf course
Listed above. Cost to move?
CategoryYearParkItemCostDone?
DetailsBudget -Notes
Maintenance/Park
Dedication/Other
C.Long Term (add to Capital Improvement Program)