HomeMy WebLinkAboutPark Improvement Plan 4-24-2007Category
A
A
A
B
B
B
C
C
C
C
C
A
B
B
B
B
B
B
B
B
B
B
C
C
C
C
C
C
C
C
C
C
C
C
Year
2007
2007
2007
2007
2007
2007
2007
2007
2007
2007
2007
2008
2008
2008
2008
2008
2008
2008
2008
2008
2008
2008
2008
2008
2008
2008
2008
2009
2009
2010
2011
2011
2012
2013
GENERAL NOTES:
$35,000 has been budgeted for in 2007 for the Park Improvement Plan
MOUNDS VIEW PARK IMPROVEMENT PLAN
Park
Hillview
Silver View
Silver View
City Hall
Groveland
Lambert
Edgewood Drive
Hillview
Oakwood
Oakwood
Oakwood
Silver View
Greenfield
Greenfield
Greenfield
Groveland
Groveland
Hillview
Oakwood
Random
Silver View
Silver View
City Hall
Groveland
Oakwood
Oakwood, Woodcrest, Greenfield, Silver View
Silver View
Hillview
Sysco Outlot A
Lambert
Greenfield
Lambert
Community Center
Greenfield
The needs list are categorized into three categories:
A. Maintenance (do now)
B. Budget (budgeted item in the next years budget)
C. Long Term (add to Capital Improvement Program)
Item
Trailway to Building
Parking Lot
Irrigation
Pleasure Rink
Sidewalk
Pavers
Playground
Soccer field and Irrigation System
Fence
Playground
Ball Field
Parking Lot
Trail
Lighting
Volleyball Court
Lights
Rink
Picnic Tables/Benches/ Trash Receptacles
Border
Lake
Trail
Playground
Tree remediation
Disc Golf Course
Park Trailway Paving Project
Parking Lot
Sidewalk & Parking lot
Parking Lot and Trailway
Building
Parking Lot
Building
Parking Lot
Parking Lot
Details
Construct trailway to building
Crack seal parking lot
Aerator install in Silver view pond
Add irrigation system to S, E, and W side
Level rink area and plant with hardy seed
replace broken sections of sidewalks
place colored concrete pavers between curb and pathway on Edgewood Drive
Replace playground & fiberfill
Construct soccer fields and install an irrigation system at the SE corner of Hillview & Quincy
Construct a fence along Hillview and Quincy
Construct a new playground with boarder and fiberfill at the southeast corner of Hillview and Quincy
Redo Silver View Ball Field #1 and warning track
Repair/seal coat parking lot
Repair/seal coat
Replace security light with more efficient fixtures
Re-do & replace standards and boarder
Replace rink and court lights with more efficient fixtures
Reconstruct rink surface at Hillview
Add picnic tables (2), Benches (4), Trash Receptacles (4)
Replace border on playground
Develop a proposal to treat the algae a) do nothing; b)barle straw treatment; c) bacterial treatment;
Repair/seal coat
Playground Replacement w/fiberfill
Remove and Replace Black Locus
Add disc golf fields to north side of the park to Greenfield
Paved trails at Oakwood, Woodcrest, Greenfield, Silver View
Seal Coat
Install sidewalk 8 ft from Hillview Road to Hillview Park Shelter front door
Construct a small parking lot and bituminous trailway on the Sysco Outlot A property - City is committed to spend up to $150,000. Remainder would be Medtronic's cost
replace building-design
Resurface
replace building-construction
redesign so the front ends of vehicles do not overhang sidewalk; address drainage problem by day care; add storm sewer catch basin and pipe out to Bronson
Rehabilitate Parking lot
Cost
1000
6500
5000
13000
800
1000
28000
38000
50000
8000
20000
2500
1000
5000
30000
8000
6000
7000
2500
2000
7200
38000
5000
18000
30000
50000
30000
378000
30000
50000
260000
30000
10000
Budget -Maintenance/Park Dedication/Other
General Park Fund
General Park Fund
General Park Fund
Special Projects
General Park Fund
Park Dedication
Special Projects
Park Dedication
Park Dedication
Park Dedication
Park Dedication
General Park Fund
General Park Fund
General Park Fund
General Park Fund
Park Dedication
General Park Fund
General Park Fund
General Park Fund
Park Dedication
General Park Fund
General Park Fund
Park Dedication
Forestry Budget
Park Dedication
Park Dedication
Park Dedication
Municipal State Aid
Park Dedication
$15,000 Special Projects & $15,000 Park Dedication
Park Dedication
$130,000 Special Projects & $130,000 Park Dedication
Special Projects
General Park Fund
Last Updated: April 24, 2007
Done?
Phase 1
Phase 1
Phase 2
Phase 3
Notes
Will be done with street crack sealing: 2007 or early 2008
System from golf course
In 2007 Budget
Approved 2005 PIP
In 2007 Budget
In 2007 Budget
Oakwood Park Rehabilitation Project ($50,000 budgeted in 2006, $60,000 Budgeted in 2007)
Oakwood Park Rehabilitation Project ($50,000 budgeted in 2006, $60,000 Budgeted in 2007)
Oakwood Park Rehabilitation Project ($50,000 budgeted in 2006, $60,000 Budgeted in 2007)
street seal coating
May be part of larger lighting project
Approved 2005 PIP
May be part of larger park lighting project
Approved 2005 PIP
Review issue in 2007
Working with street dept.
Oakwood Park Rehabilitation Project ($50,000 budgeted in 2006, $60,000 Budgeted in 2007)
Was in 2007/2008 Street Project - Sidewalk to Park Building will be pais via Park Dedication
City to pay $150,000, Remainder from Medtronic. Most of area appears to be wetland - need remediation plan first.
DetailsBudget -Notes
CategoryYearParkItemCostDone?
Maintenance/Park
Dedication/Other
redesign so the front ends of
vehicles do not overhang
sidewalk; address drainage
problem by day care; add storm
sewer catch basin and pipe out
to BronsonSpecial Projects
C2012Community CenterParking Lot$ 30,000.00
Rehabilitate Parking lot General Park Fund
C2013GreenfieldParking Lot$ 10,000.00
The needs list are categorized into three categories:
A.Maintenance (do now)
B.Budget (budgeted item in the next years budget)
C.Long Term (add to Capital Improvement Program)
GENERAL NOTES:
$35,000 has been budgeted for in 2007 for the Park Improvement Plan