Loading...
HomeMy WebLinkAboutParks and Recreation Commission Meeting Packet - February 28, 2008Parks and Recreation and Forestry Commission Meeting Agenda February 28, 2008 6:30 P.M. 1. Roll Call 2. Approval of minutes from the January 24, 2008 meeting. 3. Public Input - Citizens are encouraged to speak to the Parks and Recreation and Forestry Commissioners on issues of concern. 4. YMCA Update 5. Unfinished Business: a.) Greenfield Park Pubic Meeting Notice — The Parks and Recreation Commission conducted a Public Meeting on January 24, 2008 to discuss what should be the long term vision for the parkland and existing trailway located north of Oakwood Park and east / northeast of Greenfield Park. Feedback Forms were made available at the Greenfield Park meeting. The deadline for submitting these forms was February 22°d. The City received a total of seven Feedback Forms (written comments, suggestions). The Commission directed staff to prepare cost estimates for trail surface and bridge replacement. Since this area is within a flood plain, the Rice Creels Watershed District will require mitigation for any fill added to this area at a 1 -to -1 ratio (i.e. for every square yard of trailway top dressing material added a square yard of soil within the floodplain will need to be removed). The bridge report provided is a worst case scenario. If a the bridges that were salvaged from the golf course are to be reused, Staff is recommending that bids are received based on golf course plans and that minimal, yet adequate, preparation planning is administrated by Staff. An option for this area that the Commission may wish to consider would be to simply add a thin layer of aggregate material to the existing pathway to make it more usable and attractive at this time. In addition, park staff would increase general maintenance of this area. The City Forester and School District would work together to develop a vegetative planting plan and include other educational features and interests. Then, at a later date, perhaps when the streets in this area are reconstructed, the City could look at performing a more extensive rehabilitation of the park by re -developing the trailway and perhaps replace the existing bridge and possibly adding the second bridge. b.) Volunteer Coach of the Year Award - and naming it after Patrick "Homer" Holmes — Update: Naming of the award itself. Notification / publication of the award and application information. MVCC and area associations, Mounds View Matters... Current schedule for 2009 Award: YMCA will include information in all Mounds View Matters Throughout 2008 YMCA to handout information to athletic associations / parents Throughout 2008 6. 7. Deadline for applications February 15, 2009 Commission reviews applications February 26, 2009 Council approves recommendation March 9, 2008 Award presented at Town Hall Meeting April 2009 Article in Mounds View Matters regarding recipient June 1, 2009 Staff has drafted verbiage for the award plaque. This should be reviewed and approved by the Commission. New Business: a.) Meeting with City Council — Annually the Commission meets with the City Council to discus various issues. This meeting has tentatively been set for April 7, 2008. Does this date work for the Commissioners? A list of topics to discuss should be developed at the February 28, 2008 meeting. The following is a list topic during last years meeting with City Council: • Oakwood Park Improvement Project • Improving Ball Fields • Operations of the Mounds View Community Center • Attendance of the Commission at City Council Meetings • Bethlehem Baptist Church — Donation Process and Procedure • Number of Parks and Recreation and Forestry Commissioners? b.) Bethlehem Baptist Church Donation Committee — The Committee will consist of Jim Ericson, Steve Dazenski, Council Member Haul, Dan Weldon, and one P&R Commissioner. John Kroeger or Cindy Palm? (one could be the back up person) c.) Other New Business? Commissioner/Staff Reports: a) Park Sign Replacement Program Update — The four signs that were budgeted in 2007 have been delivered. These were for: Silver View, Random, Hillview, and Groveland parks. Only the Hillview sign was installed before the fall freeze up. The remaining fours signs have been included in the 2008 budget. These are for: Lambert, Oakwood, Woodcrest and Greenfield. b) ALRC Biking Committee—Darren Peterson will be a representative for that committee. Next meeting is March 16`x' at the Roseville City Hall. c) Parks Promotional Video — Vanessa is currently editing the video. A screening of a draft video will be played at the March 27`x' meeting for the Commissioner's review and comment. The final version will be played and the Town Hall Meeting scheduled for April 19`x'. It will also be play periodically on the cable network. d) Any Other Reports? Request for future agenda items/other business Possible Items for the March 27`x' Agenda. Parks and Recreation and Forestry Commission Meeting Minutes January 24, 2008 6:30 P.M. GREENFIELD PARK. PUBLIC MEETING LONG TERM PLANS FOR CURRENT PARKLAND AND TRAILWAY NOTE: The Parks and Recreation and Forestry Commissioners conducted a public meeting to discuss the long term plan for the parkland area and existing trailway located north of Oakwood Park and east / northeast of Greenfield Park. Other agenda items followed the public meeting. 1. Call to order 6:30 P.M. Roll Call: Peterson, Long, Arel, K.roeger, Kunz, Palm, Aukee (6:33) Staff present: Lee, Weldon, Dazenski, Wriskey 2. Approval of minutes from the December 20, 2007 meeting. Motion by Peterson, 2"d by Long to approve the minutes. Motion Passed 6-0. 3. Public Input - Citizens are encouraged to speak to the Parks and Recreation and Forestry Commissioners on issues of concern. NO RESIDENTS TO SPEAK other than for the Public Meeting. See addendum 4. YMCA Update — Weldon: Ice skating season is up and running. Last day is scheduled for February 17t�'. Commissioners suggested longer skating season if weather holds, especially try to stay open through February 18`x' for schools out on President's Day. New Event Center Coordinator: Matthew Baumann February 23`d from 9a.m.-12 noon: Annual garage sale. Items accepted up until February 15`x'. Unfinished Business: 5. Greenfield Park Pubic Meeting: See attached addendum. a.) Suggested to review written comments by public input forms, and try to narrow it to 1-2 options by considering pros and cons, trying to make a decision by March or April. Commissioners are encouraged to look at the website www.treetrust.org for opportunities with trail development assistance. Direct staff to prepare cost estimates for trail surface and bridge replacement, whether or not we can use the bridges from the golf course. b.) Developing a Volunteer Coach of the Year award and naming it after Patrick "Homer" Holmes — Motion by Palm, 2"d by Aukee to call the award "The City of Mounds View Volunteer Coach of the Year Award." The certificate and plaque would also say "in honor of Patrick `Homer' Holmes presented to ..." Motion Passed 7-0. Staff will put together a sample plaque for the next meeting. Suggested time line as follows: 1) Have YMCA put a notice box in each MV Matters edition encouraging residents to nominate a coach of the year. 2) Deadline for applications February 15"' 3) Commission reviews applications February meeting 4) Council approves recommendation first March meeting 5) Award presented at Town Hall Meeting April 6) City will put an article in the MV Matters and other press if possible, announcing the recipient of the award after the award is presented at the Town Hall Meeting in April of each year. 6. New Business: a.) Other New Business? Update on city lights on County Highway 10 Trailway: In progress 7. Commissioner/Staff Reports: a) Park Sign Replacement Program Update – The four signs that were budgeted in 2007 have been delivered. These were for: Silver View, Random, Hillview, and Groveland parks. Only the Hillview sign was installed before the fall freeze up. The remaining fours signs have been included in the 2008 budget. These are for: Lambert, Oakwood, Woodcrest and Greenfield. Direct Staff to include a sign for Silver View park on County Road H2 and to determine whether or not the sign at Arden Park needs to be replaced. b) ALRC Biking Committee—Darren Peterson will be a representative for that committee. Next meeting is March 16`x' at the Roseville City Hall. c) Parks Promotional Video – All footage has been shot. John Kroeger will meet with Ms. Van Alstine to do the voice over for Arden Park. She will edit the video so it is ready for the Town Hall meeting. She will bring a draft to the March Meeting for our approval. d) Any Other Reports? NONE Request for future agenda items/other business Possible Items for the February 28`x' Agenda: Playground replacement for summer 2008—Park Improvement Plan. City Hall Park next on the list? Can we get replacement before .50°' Anniversary celebration at MV Festival in the Park? Annual Commission meeting with City Council 9. Motion to adjourn by Long, 2"d by Aukee at 8:28 P.M. Motion Passed 7-0. 1.24.08 PUBLIC MEE'T'ING ADDENDUM: Public Meeting to discuss the long term plan for the parkland area and existing trailway located north of Oakwood Park and east/northeast of Greenfield Park. Resident #l: Discussed Duluth disc golf course newspaper article dated Oct. 23, 2007. Concerned with using public monies to put in a disc golf course. If we choose to do this we should following the Duluth ideas and raise the money from private donations rather than public monies. We already have a disc golf course. Don't need another. Resident 42: Keep, improve, and maintain cut -rent walking path including sturdy bridges over existing areas. Perhaps paved and unpaved. Parking could be at Greenfield Park. Enlist scouts and other groups to help with maintenance. Encourage schools to use the trail. Refrain from further development or intrusion. See attached letter. Resident #3: Maintain what is existing. No need to pave as concerned with cars driving back there. Encourage it to be a place for people of all ages for biking, walking, and enjoy nature. Resident 44: No to disc golf. Clean up the park, leave it natural without paving. Maintain trail and fix bridges. Resident #5: Keep it as is, but may need to make it handicap accessible. Resident 96: Concerned with police patrolling the area for vandals, etc. Resident 47: If we restored the trail to what it was, we could get a more positive use. Roxanne Cunningham, science teacher at Pinewood Elementary, spoke about ideas to get community involvement and investment. She shared a powerpoint presentation: Consider the following: 1) what is the trail to be? 2) who will use the trail? age -range, level of use? 3) connecting to other trails? 4) hiring a professional trail builder 5) Put the trial in first, mark it with nature facts, advertise it, provide benches 6) trail grading, meandering, water run-off 7) back yard privacy Rick Wriskey, City Forester spoke about trees along the trailway. Cotton woods, willows, cherry, box elder, elms, pin cherry. It provides a screen for residents for US highway 10, etc. Discussed opportunity of working with Pinewood school again to do plantings as they have done in the past. Encouraged getting the schools involved by getting younger children invested in the park to decrease vandalism. What are the next steps: 1) define what we want to do with the parkland 2) develop a plan to get there GREENF�EL® PARK ® LONG TERM PLAN Youi° FEEDBACK is requested Please fall out and return this form to the City by February 22, 2008 --------------- Having reviewed and discussed options for the long term plan for the current open space associated with Greenfield Park, please check what your preference is: ❑ Eliminate the existing trail and let the area become fully natural Keep the existing trail "as is" and do minimal maintenance Upgrade the trail and increase maintenance in this area Develop a Disc Golf Course —can be done with other options L] Create large ponding area(s) — as was proposed in 2001/2002 Other preferred option What are you thoughts, ideas, preferences, issues, and concerns regarding the development of a long term plan for the park land area and existing trailway located north of Oakwood Park and east / northeast of Greenfield Park? 1MV, •N �jv /> /N ✓li .,'iV �5.. 1'/C:c.y t,. -t j .:> L J� (� ,.��cLZ/Jk'�(wl� sf)1'1:.)= /';i �?� ;i ,_�C�_ /;•,!/u� :�;1rl�;l�lr-�- r Name %i )j41 7 %�j� �- � % Phone Address Thank you for taking the time to complete this form. Please return it to the Mounds View City Hall by 4:30PM on February 22, 2008 by folding and mailing it, by dropping it off at City Hall, by emailing it to greg.lee@ci.mounds-view.mn.us or by faxing it to 763-784-3462. Your comments will be included in an information packet to be presented to the Parks and Recreation Commission on February 28, 2008. Sincerely, ,a� 4e Greg Lee Director of Public Works FEB -01-2008 14:17 FARMER LENDER MEDIATION 6126251955 P.01/01 "Vous FEEDBACK is requested ,X,n,Ms �OT 1i F Ti, ... . . ........ . ........ Having reviewed and discussed options for the long term plan for the current open space associated with Greenfield Park, please check what your preference is: ❑ Eliminate the existing trail and let the area become fully natural F� Keep the existing, trail "as is" and do minimal maintenance Upgrade the trail and increase maintenance in this area ElDevelop a Disc Golf Course - can be done with other options Create large ponding area(s) - as was proposed in 2001/2002 �L J� Other preferred option, What are you thoughts, ideas, preferences, issues, and concerns regarding the development of a long term plan for the park land area and existing trailway located north of Oakwood Park and east / northeast of Greenfield Park? Vol d -e r1cm —To , Name - V) n 14;, 00A rw V e- Phone 7 EO - � 4 12 Address .929 9 --KJ2;� zip UR KIWI Thank you for taking the time to complete this form. Please return it to the Mounds View City Hall by 4-.30PM on February 22, 2008 by folding and mailing it, by dropping it offat City Hall, by emailing it to greg.lee&i.mounds-view.mn.us or by faxing it to 763-784-3462. Your comments will be included in an information packet to be presented to the Parks and Recreation Commission on February 28, 2008, Sincerely, ,OA� R�� Greg Lee Director of Public Works TOTAL P, 01 e `�� � t'� Cit e_. • .ie � � — �'� ���� Your FEEDBACK is requested Please fill out and return this form to the City by February 22, 2008 ----------------------------------------------------------------------------------- ---- - Having reviewed and discussed options for the long term plan for the current open space associated with Greenfield Park, please check what your preference is: ElEliminate the existing trail and let the area become fully natural Keep the existing trail "as is" and do minimal maintenance Upgrade the trail and increase maintenance in this area 0 Develop a Disc Golf Course — can be done with other options Create large ponding area(s) — as was proposed in 2001/2002 Other preferred option ------------------------------------ What are you thoughts, ideas, preferences, issues, and concerns regarding the development of a long term plan for the park- land area and existing trailway located north of Oakwood Park. and east / northeast of Greenfield Park? ///l C)f �� G�� j� 7/1 �?� CVS %LYlf%�'�. —//W .:t1Le�i�=- GL%� �, SYS �,E �lJ l`7.. /7 Name Phone Address ^�Z ) 15 .r1V _ Zip Thank you for taking the time to complete this form. Please return it to the Mounds View City Hall by 4:30PM on February 22, 2008 by folding and mailing it, by dropping it off at City Hall. by emailing it to greg,lee@ci.mounds-view.mn.us or by faxing it to 763-784-3462. Your comments will be included in an information packet to be presented to the Parks and Recreation Conunission on February 28, 2008. Sincerely, ica� R( e Greg Lee Director of Public Works Your FEEDBACK is requested Please fill out and return this form to the City by ]February 22, 2008 -------------------------------------------------------------------------------------------- Having reviewed and discussed options for the Iong term plan for the current open space associated with Greenfield Park, please check what your preference is: ❑ Eliminate the existing trail and let the area become fully natural 1� Keep the existing trail "as is" and do minimal maintenance ❑ Upgrade the trail and increase maintenance in this area Develop a Disc Golf Course - can be done with other options ❑ Create large ponding area(s) - as was proposed in 2001/2002 1-1 Other preferred option 'What are you thoughts, ideas, preferences, issues, and concerns regarding the development of a long term plan for the park land area and existing trailway located north of Oakwood Park and east / northeast of Greenfield Park? Name Address Phone zip ,_-5- r za Thank you for taking the time to complete this form. Please return it to the Mounds View City Hall by 4:30PM on February 22, 2008 by folding and mailing it, by dropping it off at City Hall, by emailing it to greg.lee@ci.mounds-view.rnn.us or by faxing it to 763-784-3462. Your con rients will be included in an information packet to be presented to the Parks and Recreation Conunission on February 28, 2008. Sincerely.. , it 4e Greg Lee Director of Public Works t -s t -i � t-- ('. � ��� � t`=t. I`+. ! -- @__ t�f ; `•� lj t _ i-`. ' `� i s— r-01 t Your FEEDBACK. is requested Please rill out and return this form to the City by February 22, 2008 Having reviewed and discussed options for the long term plan for the current open space associated with Greenfield Park, please check what your preference is: ❑ Eliminate the existing trail and let the area become fully natural Keep the existing trail "as is" and do minimal maintenance ElUpgrade the trail and increase maintenance in this area 0 Develop a Disc Golf Course — can be done with other options ❑ Create large ponding area(s) — as was proposed in 2001/2002 ❑ Other preferred option ---------------------------------------------------------------------------- What are you thoughts, ideas, preferences, issues, and concerns regarding the development of a long tern plan for the park land area and existing trai.lway located north of Oakwood Park and east / northeast of G.reenfreld Park? '1 Named % Phone �� c v zip t� Wil/ Z Address - 3.��1'1(�.%ZiL�I�JZ _ -- Thank you for taking the time to complete this form. Please retunr it to the Mounds View City Hall by 4:30PM on February 22, 2008 by folding and mailing it, by dropping it off at City Hall, by emailing it to greg.leeQci.mounds-view.rnn.us or by faxing it to 763-784-3462. Your comments will be included in an information packet to be presented to the Parks and Recreation Conunission on February 28; 2008. Sincerely, ,, c 4e. Greg Lee Director of Public Works Comments on the Long Term Plan for the Greenfield Parkland Area January 24, 2008 I am Tom K.osel, residing at 8120 Jackson Drive, directly across the street from the far NW end of the area under discussion tonight. Having already participated in several meetings related to the use of this area, I commend the members of the Commission for your previous decision to table consideration of putting a disc golf course there. I believe your main reason may have been the cost of such a project, given the fact that it would have been somewhere in the vicinity of $50-60,000. My main concern was the affect such a course would have on the natural state of the area, and on the wide variety of animals that pass through and/or live there. The suggestions I offer tonight are the following: I - Keep, improve, and then properly maintain the current walking path through the area. A well- maintained walking path, with sturdy bridges over the creek, would more likely be used by people of all ages, all the way from children to seniors. This may or may not require paving the trail, depending on the cost, and on the ability of an unpaved trail to still accommodate all residents, such as those with handicaps. Furthermore, I believe an improved path would be more inviting to all residents of Mounds View, not just those who happen to live nearby. Citizens from the whole city, who may be looking for a pleasant walk tlu-ough a natural area, could park their cars in the lot by the baseball field. Only during baseball games is that lot ever crowded. 2- Enlist the help of the Scouts and/or other community groups to help keep the entire Greenfield area clear of deadfall, debris and other discarded materials. This would not only keep the whole Greenfield area clean and neat, it would give these groups a community project to work on, and would also be more cost-effective for the city work -crews to not need to spend as much time with such tasks. It might also make it possible for them to spend more time maintaining the current disc -golf course at Silverview. 3-- Invite schools to use the trail as an educational experience, where students could see native plants (some which are already present, and others which could be planted), and maybe even see some wildlife. And 4- Refrain from any further development or intrusion into the natural, wooded or wetland sections of the area. This would honor what I and many other nearby residents had been told has been the long-standing intention of the city, namely, to keep this area as undeveloped. In other words, let's keep the area as natural as possible by staying away from disc golf, or regional ponding, or excavation for berms, or any additional trailways, or anything else that could have negative impact on the current, natural habitat and environment. Thank you. pp ryry _~ i a k,_ =1�f £• :. 4t. f g.i € Your FEEDBACK is requested Please fill out and return this form to the City by February 22, 2008 ---------------------------------------------..--------•• --------------------------------- Having reviewed and discussed options for the long term plan for the current open space associated with Greenfield Park, please check what your preference is: 1-1 Eliminate the existing trail and let the area become frilly natural Keep the existing trail "as is" and do minimal maintenance Upgrade the trail and increase maintenance in this area C�1 Develop a Disc Golf Course - can be done with other options E_] Create large ponding area(s) - as was proposed in 2001/2002 [:] Other preferred c4 (S c- - o , Luh e I What are you thoughts, ideas, preferences, issues, and concerns regarding the development of a long term plan for the park land area and existing trailway located north of Oakwood Park and east / northeast of Greenfield Park? --Vhe(e, O ,-1�rea-3 Ge- �.i-„1��r�n �cc,.dl c-��.1, l ti ) 4U -Q)t V e ( CO n --P �n,C ” Lvt 0 � ! }'pct rt -K, & r\.A - 1--O L j -,-I j -40 4(/��pt `j1�y`D�w,Yt i$►, �, h cep h q ryt' KCS ( ,{ (0 •.• /U 14 Name Car {.L, S�t'_. i rt djc,_c d, Phone _ r? 1.3 - i 1 -7 i2 6� 5 - Address ] 2 (v i W (Jo GQ 16-.,.i h n ', _ Zip TS 11 2— Thank you for taking the time to complete this form. Please return it to the Mounds View City Hall by 4:30PM on February 22, 2008 by folding and mailing it, by dropping it off at City Hall, by emailing it to greg.lee@ci.mounds-view.mn.us or by faxing it to 763-784-3462. Your comments will be included in an information packet to be presented to the Parks and Recreation Commission on February 28, 2008. Sincerely, liter W-Qe Greg Lee Director of Public Works Greg Lee From: Steve Dazenski Sent: Monday, February 04, 2008 3:20 PM To: Greg Lee; Cindy Palm; Dale Aukee; Dale Aukee; Dan Weldon; Darren Peterson, Dave Long (E-mail); Gerald Arel; Greg Lee; Jerome Kunz (E-mail); John Kroeger; John Kroeger, Steve Dazenski Subject: FW: Greenfield Pathway -----Original Message ----- From: Steve Dazenski Sent: Monday, February 04, 2008 3:16 PM To: Cindy Palm; Dale Aukee; Dale Aukee; Dan Gerald Arel; Greg Lee; Jerome Kunz (E-mail); Subject: Greenfield Pathway Hi Commissioners, Weldon; Darren Peterson; Dave Long (E-mail); John Kroeger; John Kroeger; Steve Dazenski At the last P&R meeting a request was made for the cost of materials to improve the pathway at Greenfield Park. The pathway measures out at approximately 3,000 feet in length. It should be established at 10' wide and 4" to 5" deep. To do this at 5" would require 920 tons @ $10.92 per ton. At 4" it would take 735 tons. This would be worst case scenario as we could get by with 2" where the path base was good. The Rice Creek Water Shed will want a 1 for 1 ratio used for any fill. We still want to do something with berms near Hillview and Quincy so a settlement or sedimentation pond can be looked at. My feeling is that approximately 50% could be done with 2". I hope this info. helps, let me know if there are any questions. Steve 1 COTY, CRI C 1J .d 1 OL�H rp�rPss " Partn�rsh01 Feasibility & Cost Analysis for Pedestrian Bridge Re -use Mounds View, Minnesota November 19, 2007 Bonestroo File No. 435-07000-0 Ilt•111:Z�I11Z�>ihli• The City of Mounds View currently has two prefabricated pedestrian bridges stored at its public works facility. The City has requested a brief report discussing the scope of work and costs that would be associated with reusing the bridges within the City. IY�I17i:(l7Z�111►1�7 The two bridges came from the former City -owned golf course near the intersection of 1-35W and U.S, Highway 10. The bridges were no longer needed at that location after the site was redeveloped into an office complex by Medtronic. Bonestroo performed a cursory inspection of the bridges on November 8, 2007, and observed the following: • The two bridges appear to be identical • The bridges are prefabricated truss structures approximately 40 feet long and 10 feet wide • The bridges are made of self -weathering steel ("rusty" look, no painting needed), with timber decking • The bridges were designed for a 10,000 pound vehicle, and presumably pedestrian loads • The bridges appear to be in good condition, except for the timber decking • The bridges appear to have been manufactured by Contech (formerly Continental Bridge) in Alexandria, MN. Specific design information can probably be obtained from Contech. if Bonestroo OPTIONS The two primary options for dealing with the stored bridges are 1) re -use the bridges at new locations within Mounds View, and 2) sell the bridges. Re -use of the bridges will be discussed in detail later in this report. If the City chose to sell the bridges, a rough estimate of their resale value would probably be in the range of $10,000 to $15,000 each, This resale value is based on an estimated cost of approximately $30,000 for each bridge if they were to be purchased new. There would be no guarantee of finding a willing buyer, as the geometry of the bridges would need to be an exact match for the buyer's site requirements. RE -USE BRIDGES Re -using the bridges is feasible, provided the new locations match the bridge geometry. The process that would need to be followed involves several tasks, including both design and construction phases, The following is a brief discussion of the tasks that are typically required for the design and construction of a pedestrian bridge crossing, along with estimated costs for each task. DESIGN (PRE -CONSTRUCTION) TASKS • Site Survey. Determine topography, locate utilities and possible construction conflicts, define floodplain for hydraulic analysis. • Wetland Delineation. Determine presence and type of wetlands that could be impacted by construction. • Geotechnical Exploration. Determine subsurface soil conditions and obtain recommendations for bridge foundation support. • Hydraulic Analysis. Determine effect structure will have on channel flow, and possible impacts to floodplain zoning. • Hazardous Materials Investigation. If replacing an existing structure, conduct an investigation to determine presence and disposal requirements of hazardous materials. • Structure Design. Design concrete abutments, prepare construction plan sheets, prepare construction specifications, thorough inspection of existing bridges, coordinate inclusion of salvaged bridge superstructure. CONSTRUCTION TASKS • Deliver Bridge. Bridge must be moved from storage location to new project location. • Abutment Construction. Build new concrete abutments to support bridge, including excavation, backfill, and placement of riprap for scour protection. • Drive Piling. Mobilize pile driving equipment, furnish and drive piling (piling may or may not be required, depending on results of geotechnical exploration). • Install Bridge. Install existing bridge onto new abutments, • Redeck. Replace worn timber decking with new naturally durable timber decking. • Construction Administration. Construction survey, observe and document construction activities, review payment submittals from contractor, and coordination as necessary with the City. Mounds View, MinnesotaProject No: 435-07000-0 Pedestrian Bridge Re -use f Bonestroo Page 2 COSTS The costs for some of the tasks can be estimated fairly accurately, while other costs would be dependent on the proposed bridge location. The following breakdown gives approximate costs for the various tasks. It must be emphasized that these costs are based on averages from previous projects, and could vary significantly for a specific bridge re -use project considered. Design (Pre -construction) Costs Site Survey $ 2,000 Wetland Delineation $ 1,000 Geotechnical Exploration $ 5,000 Hydraulic Analysis $ 1,500 Haz. Materials Investigation (if required) $ 1,500 Structure Design $ 8,000 Design Subtotal $19,000 Construction Costs Mobilization $ 7,500 Furnish Bridge Superstructure $ 0 Deliver Bridge $ 2,500 Abutment Construction $25,000 Drive Piling (if required) $20,000 Install Bridge $ 7,000 Redeck $ 3,000 Construction Observation $ 4,000 Construction Administration $ 2,000 Construction Subtotal $71,000 Project Total $90,000 The costs shown are for one bridge. The cost to re -use both bridges would be approximately double the total shown, unless both bridges were used on the same project, in which case some overlap of tasks could result in a slight cost reduction. Costs could also be reduced if City staff were able to complete some of the work tasks, such as delivering the bridges to their new locations. Costs do not include any aesthetic features, such as textured or colored concrete. SUMMARY The two bridges currently being stored by the City of Mounds View appear to be in good condition and structurally adequate for re -use at new locations. While the City would not incur any costs for the bridges themselves, re -use of the bridges would result in a significant expenditure by the City due to the many tasks required in the design and construction processes. Mounds View, MinnesotaProject No; 435.07000-0 Pedestrian Bridge Re -use f Bonestroo Page 3 Bonestroo has completed many projects involving prefabricated pedestrian bridges, and we can assist the City with the process of restoring these Wo bridges to useful service VVe would be happy to meet with City staff, at your convenience, to discuss the specifics of achieving that goal I hereby certify that: this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota Todd R. Stevens Date November 19, 2007 Reg No 21312 AI,YOL'.^.•OS c'SV, ;Vi17,705017 ?r. ert r>s Dj „ Re- Air Bonestroo114 Pao= d