Loading...
HomeMy WebLinkAboutOrdinance 1016ORDINANCE NO. 1016 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA AN ORDINANCE AMENDING THE 2024 CITY OF MOUNDS VIEW FEE SCHEDULE REGARDING ELECTRICAL PERMITS AND INSPECTIONS THE CITY OF MOUNDS VIEW ORDAINS: SECTION 1. The City Council of the City of Mounds View approved the 2024 City of Mounds View Fee Schedule by adopting Ordinance 1012 on November 13, 2023. SECTION 2. The City Council of the City of Mounds View hereby amends the 2024 City of Mounds View Fee Schedule by adding the underlined material as follows: COMMERCIAL ELECTRICAL PERMIT 50.00 per trip or the fee below, whichever is great (Solar fees are the same as residential solar fees Valuation 1 to $1,000 $50.00 Per trip Valuation $1,001 to $2,000 $50.00 for the first $1,000 plus $3.25 for each additional $100 or fraction thereof, to and includin 2,000 Valuation $2,001 to $25,000 $82.00 for the first $2,000 plus $14.85 for each additional $1,000 or fraction the to and includin 25,000 Valuation $25,001 to $50,000 $423.55 for the first $25,000 plus $10.70 for each additional $1,000 or fraction thereof to and including 50 000 Valuation $50,001 to $100,000 $691.05 for the first $50 000 plus $7.45 for each additional $1,000 or fraction thereof, to and includin 100,000 Valuation $100,001 to $500,000 $1,063.55 for the first $100,000 plus $6 for each additional $1,000 or fraction thereof, to and including $500,000 Valuation $500,000 to $1,000,000 $3,463.55 for the first $500,000 plus $5.10 for each additional $1,000 or fraction thereof, to and including 1 000 000 Valuation $1,000,001 and up $6,013.55 for the first $1,000,000 plus $4 for each additional $1,000 or fraction thereof Reinspection fee (in addition to all other $50.00 fees Investigation Fee (working without permit) Double Fee Ordinance No. 1016 Page 2 of 3 RESIDENTIAL ELECTRICAL PERMIT FEES (SINGLE FAMILY HOMES, APARTMENTS, AND CONDOMINIUMS HOMEOWNERS AND CONTRACTORS: Complete an electrical permit form available from the Building Inspections Division. Add $1.00 for State surcharge to total cost of each permit. The fee is the total of the listed fees or the total number of inspection trips x $50.00, whichever is greater. Residential Panel Re lacement $110.00 Sub Panel $50.00 New Service or Power Supply (Circuits) Add $16.00 for each add'I 100 amps $55.00 71.00 0 to 300 Amp 400 Lmg New Service or Power Supply (Feeders) Add $6.00 for each add') 100 amps $9.00 0 to 100 Amp 101-200 AM 111-5-00 Minimum permit fee is $50.00 plus $1.00 State surcharge. This is for one inspection only. Minimum fee for rough -in and final inspection is 100.00 plus 1.00 State surcharge. Maximum fee for single family dwelling or townhouse not over 200 amps (No max if service is over 200 Amps) is $200.00 plus $1.00 State surcharge. Maximum of 2 rough-in's and 1 final inspection. (Failed inspections are an additional $50.00 each) Apartment or Condominium Complex (Does not cover service, unit feeders or $90.00 per unit house p@pelsL Swimming Pool and Hot Tub 1100.00 plus circuits at $9/each includes 2 ins ections Addition/Remodel/Basement Finish $100.00 (includes up to 10 circuits and 2 in ections Residential Accessory Structure The greater of $55 for panel plus $9 per circuit or 100 for 2 inspections Street and Parking Lot Li hts $5 per each standard Transformers and Generators: Up to 10 kva 11 to 74 kva 75 kva to 299 kva Over 299 kva $5.00 $45.00 $60.00 1165.00 Retrofit Li htin 0.85 er fixture Sign Transformer or Driver $9 per transformer Low Voltage Fire Alarm, Low Voltage Heatinq and Air Conditioning Control Wiring $0.85 per device Residing Jobs $50.00 first unit, $35.00 for each add'I unit Reinspection Fee (in addition to all other $50.00 fees Ordinance No. 1016 Page 3 of 3 Solar Fees: 0 kw to 5 kw $90.00 5.1 kw to 10 kw $150.00 10.1 kw to 20 kw $225.00 20.1 kw to 30 kw $300.00 30.1 kw to 40 kw $375.00 40.01 kw and larger 375.00 plus $25.00 for each add'I 10 kw Electrical Inspection Fee: Furnace, Ai $40.00 Conditioning, Bath Fan, Fireplace or Receptacle for Water Heater Vent • Refunds must be requesting in writing No refunds unless more than the minimum fee. Refunds are minus the City's 20 percent handling fee. • Permit fee is doubled if the work starts before the permit is issued. • Minimum fee permits expire in six months. • Permits over the minimum fee and up to 1250 expire in one year. SECTION 3. Pursuant to Minnesota Law, the Mounds View City Charter, and Mounds View City Code, the amended 2024 fee schedule is hereby adopted after making the specified revisions as shown above. SECTION 4. In accordance with Section 3.07 of the City Charter, City staff shall have the following summary printed in the official City newspaper in lieu of the complete ordinance: On August 26, 2024, the City Council adopted Ordinance No. 1016, amending the 2024 City of Mounds View Fee Schedule to include Electrical Permit and Inspection Fees. A printed copy of the ordinance is available for inspection during regular business hours at Mounds View City Hall and is available online at the City's web site located at www.moundsviewmn.ora. SECTION 5. This ordinance shall take effect and be in force 30 days from and after its passage and publication, in accordance with Section 3.09 of the City Charter. Introduction and First Reading by the Mounds View City Council on August 12, 2024. Second Reading and Adoption by the Mounds View City Council on August 26, 2024. Publication Date: August 29, 2024. acidstrom, Mayor Attest: Nyle u , City Administrator (SEAL)