HomeMy WebLinkAboutOrdinance 1016ORDINANCE NO. 1016
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
AN ORDINANCE AMENDING THE 2024 CITY OF MOUNDS VIEW FEE SCHEDULE
REGARDING ELECTRICAL PERMITS AND INSPECTIONS
THE CITY OF MOUNDS VIEW ORDAINS:
SECTION 1. The City Council of the City of Mounds View approved the 2024 City of Mounds
View Fee Schedule by adopting Ordinance 1012 on November 13, 2023.
SECTION 2. The City Council of the City of Mounds View hereby amends the 2024 City of
Mounds View Fee Schedule by adding the underlined material as follows:
COMMERCIAL ELECTRICAL PERMIT
50.00 per trip or the fee below, whichever is great (Solar fees are the same as
residential solar fees
Valuation 1 to $1,000
$50.00 Per trip
Valuation $1,001 to $2,000
$50.00 for the first $1,000 plus $3.25 for
each additional $100 or fraction thereof,
to and includin 2,000
Valuation $2,001 to $25,000
$82.00 for the first $2,000 plus $14.85 for
each additional $1,000 or fraction
the to and includin 25,000
Valuation $25,001 to $50,000
$423.55 for the first $25,000 plus $10.70
for each additional $1,000 or fraction
thereof to and including 50 000
Valuation $50,001 to $100,000
$691.05 for the first $50 000 plus $7.45
for each additional $1,000 or fraction
thereof, to and includin 100,000
Valuation $100,001 to $500,000
$1,063.55 for the first $100,000 plus $6
for each additional $1,000 or fraction
thereof, to and including $500,000
Valuation $500,000 to $1,000,000
$3,463.55 for the first $500,000 plus
$5.10 for each additional $1,000 or
fraction thereof, to and including
1 000 000
Valuation $1,000,001 and up
$6,013.55 for the first $1,000,000 plus $4
for each additional $1,000 or fraction
thereof
Reinspection fee (in addition to all other
$50.00
fees
Investigation Fee (working without
permit)
Double Fee
Ordinance No. 1016
Page 2 of 3
RESIDENTIAL ELECTRICAL PERMIT FEES (SINGLE FAMILY HOMES, APARTMENTS,
AND CONDOMINIUMS
HOMEOWNERS AND CONTRACTORS: Complete an electrical permit form available
from the Building Inspections Division. Add $1.00 for State surcharge to total cost of
each permit. The fee is the total of the listed fees or the total number of inspection trips
x $50.00, whichever is greater.
Residential Panel Re lacement
$110.00
Sub Panel
$50.00
New Service or Power Supply (Circuits)
Add $16.00 for each add'I 100 amps
$55.00
71.00
0 to 300 Amp
400 Lmg
New Service or Power Supply (Feeders)
Add $6.00 for each add') 100 amps
$9.00
0 to 100 Amp
101-200 AM 111-5-00
Minimum permit fee is $50.00 plus $1.00 State surcharge. This is for one inspection
only. Minimum fee for rough -in and final inspection is
100.00 plus 1.00 State surcharge.
Maximum fee for single family dwelling or townhouse not over
200 amps (No max if service is over 200 Amps) is $200.00 plus
$1.00 State surcharge. Maximum of 2 rough-in's and 1 final inspection.
(Failed inspections are an additional $50.00 each)
Apartment or Condominium Complex
(Does not cover service, unit feeders or
$90.00 per unit
house p@pelsL
Swimming Pool and Hot Tub
1100.00 plus circuits at $9/each
includes 2 ins ections
Addition/Remodel/Basement Finish
$100.00 (includes up to 10 circuits and 2
in ections
Residential Accessory Structure
The greater of $55 for panel plus $9 per
circuit or 100 for 2 inspections
Street and Parking Lot Li hts
$5 per each standard
Transformers and Generators:
Up to 10 kva
11 to 74 kva
75 kva to 299 kva
Over 299 kva
$5.00
$45.00
$60.00
1165.00
Retrofit Li htin
0.85 er fixture
Sign Transformer or Driver
$9 per transformer
Low Voltage Fire Alarm, Low Voltage
Heatinq and Air Conditioning Control
Wiring
$0.85 per device
Residing Jobs
$50.00 first unit, $35.00 for each add'I
unit
Reinspection Fee (in addition to all other
$50.00
fees
Ordinance No. 1016
Page 3 of 3
Solar Fees:
0 kw to 5 kw
$90.00
5.1 kw to 10 kw
$150.00
10.1 kw to 20 kw
$225.00
20.1 kw to 30 kw
$300.00
30.1 kw to 40 kw
$375.00
40.01 kw and larger
375.00 plus $25.00 for each add'I 10 kw
Electrical Inspection Fee: Furnace, Ai
$40.00
Conditioning, Bath Fan, Fireplace or
Receptacle for Water Heater Vent
• Refunds must be requesting in writing No refunds unless more than the
minimum fee. Refunds are minus the City's 20 percent handling fee.
• Permit fee is doubled if the work starts before the permit is issued.
• Minimum fee permits expire in six months.
• Permits over the minimum fee and up to 1250 expire in one year.
SECTION 3. Pursuant to Minnesota Law, the Mounds View City Charter, and Mounds
View City Code, the amended 2024 fee schedule is hereby adopted after making the
specified revisions as shown above.
SECTION 4. In accordance with Section 3.07 of the City Charter, City staff shall have
the following summary printed in the official City newspaper in lieu of the complete
ordinance:
On August 26, 2024, the City Council adopted Ordinance No. 1016, amending the
2024 City of Mounds View Fee Schedule to include Electrical Permit and Inspection
Fees.
A printed copy of the ordinance is available for inspection during regular business
hours at Mounds View City Hall and is available online at the City's web site located
at www.moundsviewmn.ora.
SECTION 5. This ordinance shall take effect and be in force 30 days from and after its
passage and publication, in accordance with Section 3.09 of the City Charter.
Introduction and First Reading by the Mounds View City Council on August 12, 2024.
Second Reading and Adoption by the Mounds View City Council on August 26, 2024.
Publication Date: August 29, 2024.
acidstrom, Mayor
Attest:
Nyle u , City Administrator
(SEAL)