HomeMy WebLinkAboutAgenda Packets - 2026/08/03 CITY OF MOUNDS VIEW
CITY COUNCIL WORK SESSION AGENDA
MOUNDS VIEW CITY HALL
Monday, August 3, 2026
6:00 p.m.
ROLL CALL: Lindstrom, Gunn, Meehlhause, Clark, Smith
Council Work Sessions are informal gatherings of the Council at which no
final decisions are made, rather consensus discussion to direct Staff on
Council decision items.
AGENDA ITEMS DISCUSSED BY CONSENSUS
1 . Master Park Plan — Director Peterson
a. Project parameters
b. Bond Question
c. Communication Plan update
2. MV Boulevard Improvement Discussion — J Turns — CM Meehlhause
PUBLIC COMMENT
Citizens may speak to issues not on tonight's agenda. Before speaking, please give
your name and address for the minutes. Also, please limit your comments to three
minutes. As a reminder, public comment is for addressing the Council only.
Comments or concerns regarding Staff must be submitted in writing to the Mayor or
City Administrator. Failure to respect these guidelines will result in me asking you to
cease commenting and asking you to return to your seat. That said, is there anyone
here for public comment?
NEXT COUNCIL WORK SESSION: Tuesday, September 14, 2026 at 6:30 pm
NEXT COUNCIL MEETING: Monday, August 10, 2026 at 6:00 pm
THIS PAGE LEFT BLANK INTENTIONALLY
Item No: 1
=ND
TSV.1
�,�TMeeting Date: August 3, 2026
MO E 'V Type of Business: WS
Administrator Review:
City of Mounds View Staff Report
To: Honorable Mayor and City Council
From: Don Peterson, Director of Public Works/Parks and Recreation
Item Title/Subject: Park System Master Plan Funding and Bonding Questions
Background:
The City has relied on the Park Dedication Fund to provide the necessary funding for Park
Improvements. These funds are generated by development and/or redevelopment in Mounds
View. The largest contribution came from the development of the Medtronic Campus in which
the funds were utilized to upgrade several playgrounds at the various parks, and constructing a
new shelter building at Lambert Park.
Unfortunately, there isn't developable land, and very little redevelopment in the City which
resulted in minimal contributions to the Park Dedication Fund.
Council has recognized the need to research other funding options.
Progression in 2025:
City Council approved Resolution 10129 on July 14, 2025, to adopt the Park System Master
Plan.
Resolution 10130 was approved to create an Advisory (sub) Committee (GOAL PARKS)for the
Parks System Master Plan. The Committee would research funding options for implementing
the 2040 Park System Master Plan, to include, but not limited to, a local levy, bonding (General
Obligation Bonds), grants, or a local sales tax.
Progression in 2026:
At the March 26, 2026, Parks, Recreation and Forestry Commission Meeting, the GOAL PARKS
Committee provided their recommendations for funding of the Park System Master Plan.
On April 23, 2026, there was a joint City Council and Parks, Recreation and Forestry
Commission meeting, to discuss the funding recommendations for the Parks System Master
Plan.
April 27, 2026, Resolution 10247 was approved by the Council, a Professional Service
Agreement with WSB for the Park System Master Plan Education Campaign.
May 26, 2026, Resolution 10256 was approved by the Council, a Professional Service
Agreement with WOLD Architects to assist with the Park Master Plan Educational Campaign —
to provide concepts drawings/renderings of Park Shelter Buildings and the potential
remodel/expansion of the Community Center.
June 29, 2026, City Council reviewed the Community Survey, conducted by Morris Leatherman,
the overall survey was positive for the City on various City services. The survey also indicated
there was support for Park bonding project.
Staff has been working with both WSB and WOLD to provide concept plans and estimated costs
related to both proposed projects. The following list of attachments corresponds to each project.
Attachment A: Concept Overlay- Silver View Park:
The project re-aligns the foul lines of the two ball fields so they do not cross in left and right
fields, adds an inclusive play area, new park shelter with a capacity of 70 indoors and 70 in the
outdoor patio area, new pickle ball courts, new trails, sidewalks making the Park more
accessible, along with other items listed.
Attachment B: Cost estimate for Silver View Park by WSB
Attachment C: Concept Overlay-Woodcrest Park:
Project includes installing a new nature play area, paved trail around the park, benches, etc.
Attachment D: Cost estimate for Woodcrest Park prepared by WSB.
Attachment E: Concept overlay of the Community Center:
The proposed project would include adding two new courts to the building, new lockers rooms
with showers and rest rooms, new addition for the fitness area, and remodeling of the front
business offices.
Attachment F: Cost Estimate for the Community Center- prepared by WOLD Architects
Attachment G: Bonding and Property Tax Impact- prepared by Ehlers Incorporated.
Attachment H: Bonding Questions - prepared by Kennedy and Graven—to be handed out at the
meeting Monday night August 3, 2026.
Attachment I: Grant Funding Options - prepared by WSB
Attachment J: Education Campaign Overview- prepared by WSB.
Strategic Plan Strategy/Goal: Maintain and Plan for Infrastructure Improvements.
Financial Impact: This does not affect the 2026 budget.
Recommendation: Staff will be at the August 3, 2026, Work Session for discussion and further
direction from the City Council regarding this matter.
Respectfully submitted,
Don Peterson, Director of Public Works/Parks and Recreation
Attachment A
o(,,
``♦♦ ROAD i EXISTING BALLFIELD
PROPERTY LINE
8'ENTRY WALK ,
EXISTING MULTI-
USE FELD a
IOC
Ell
-- o
PICNIC SHELTER
EXISTING MEMORIAL
GARDEN
PARKING LOT
RECONFIGURATION
RECONFIGURED
ENTRY DRIVE
NEW BUILDING: OPTIONAU
-INTERIOR MTG ROOM FUTURE:BATTING
-KITCHENETTE �� CAGES
RESTROOMS
-EXTERIOR PICNIC SHELTER
-STORAGE
�� SAFETY NETTING
- _- RELOCATED
BALLFIELO,ALL NEW
RECONSTRUCTION
BASKETBALL COURT
FUTURE:NATURE
TRAIL LOOP
0 FUTURE:LOOP TRAIL
AROUND SLEDDING
HILL
PICKLEBALL
COURTS(2) - EXISTING SLEDDING
HILL
OPEN LAWN&
EVENT SPACE I
i
i
EXISTING ZIP LINES
I
I
CENTRAL SEATING PLAZA
4 _
INCLUSIVE PLAYGROUND:
-PRE-SCHOOL AREA 1
-ELEMENTARY AREA
SWINGS
- -RUBBER SURFACING -
-HILLS,TUNNELS,BRIDGES WITH
PORTIONS BUILT INTO HILLSIDE
FUTURE NATIVE
PLANTING BEDS WITH %y
BENCH SEATING AREAS
IA✓�• �..:. .� 11
N
Jorlcer_�t Pan I Silver View Park
Mounds View,MN ° WSb
JULY,2026 WSB Project number:024973-000 scale in Fee[
Attachment A
-------- ---- - - ---- - - - --------------------,
1
1 I
I 1
1 r^ 1
y/
I � I
1 I
1 0 I
I X 1
rn D 0 ;
I � rn O p I
m c
o � X DX
CQ
m
710
O l/ I m 0 i
O = D 1
9
m
1 z z I
I 1
I I 1
1
I m 1
< r < mz
Co � ,— -
<
rn --1 -1
n O O
2
rn m m
r -i -i
m
n
+g.
ti
_ � A
i
Attachment A
f i '
- I i
,�� ,' �+, ,.� � ; i.,,•fir.
• t
hip •r � L b• t..
i
Attachment A
r �
—01
l �
M
j r� ,• li 1
A
� I
• 11
R
J
•s
f
1
I
~� I
1 �
Z►
.� yr
Attachment A
C I I. �Y ._. � J
Example imagery of inclusive playgrounds(playground design that integrates varying physical,sensory,and cognitive play together.Includes
accessible rubber surfacing and play elements with adaptive uses,graduated challenge,imaginary/creative play,and accounts for varying age
levels including adults&caregivers)
Image Source:paylsi.... �� r
r
r -
af M
I � �
— V
e
VVr,),-)dcre.t Park Fxamr)lp
Example imagery of nature inspired play(manufactured equipment that reflects natures or includes natural materials)
Image Source.rftwm.gov
`f v.(
P
Al
wm
t Mounds View,MN wsb
JULY,2026 WSB Project number:024973-000
Attachment B
ESTIMATED OF PROBABLE COSTS
No. I Item Units Quantity Unit Price Total Price
GENERAL CONSTRUCTION
1 REMOVALS-GENERAL LS 1 $30,000.00 $30,000.00
2 REMOVALS-BUILDING LS 1 $40,000.00 $40,000.00
3 REMOVALS-PAVEMENT SF 63000 $0.60 $37,800.00
4 REMOVALS-TREES&CLEARING LS 1 $18,000.00 $18,000.00
5 GENERAL EARTHWORK LS 1 $250,000.00 $250,000.00
6 ELECTRICAL SERVICE UPGRADES LA 1 $100,000.00 $100,000.00
7 CONSTRUCTION EXIT EA 1 $2,500.00 $2,500.00
8 EROSION CONTROL(FENCE/BIOROLL) LF 2000 $3.50 $7,000.00
9 EROSION CONTROL(REDUNDANT) LF 350 $7.00 $2,450.00
10 INLET PROTECTION EA 6 $400.00 $2,400.00
11 DEWATERING LS 1 $8,000.00 $8,000.00
SUBTOTAL $499,150.00
TRAILS,SIDEWALKS&PARKING LOT
12 BITUMINOUS PARKING LOT SY 7000 $45.00 $315,000.00
13 B6 CURB&GUTTER LF 2,000 $30.00 $60,000.00
14 10'WIDE BIT TRAILS LF 2500 $50.00 $125,000.00
15 6'CONCRETE WALK LF 700 $72.00 $50,400.00
16 CONCRETE PED RAMP EA 5 $3,500.00 $17,500.00
17 TRAFFIC SIGNS EA 10 $600.00 $6,000.00
18 STRIPING LS 1 $3,000.00 $3,000.00
19 15"RCP LF 1,000 $115.00 $115,000.00
20 CATCH BASIN EA 6 $3,600.00 $21,600.00
21 PARKING LOT LIGHTING EA 12 $7,500.00 $90,000.00
SUBTOTAL $803,500.00
PARK BUILDING
22 BUILDING LS 1 $5,250,000.00 $5,250,000.00
23 PICNICTABLES EA 12 $3,500.00 $42,000.00
24 GRILL EA 2 $900.00 $1,800.00
25 EXTERIOR CONCRETE PAVEMENT SF 4,000 $16.00 $64,000.00
26 SANITARY SERVICE(NO LIFT STATION) LS 1 $17,000.00 $17,000.00
27 WATER SERVICE LS 1 $13,000.00 $13,000.00
28 HYDRANT EA 1 $12,000.00 $12,000.00
SUBTOTAL $5,399,800.00
BALLFIELD RECONSTRUCTION(1)
No. Item Units Quantity Unit Price Total Price
29 AGG-LIME CY 200 $130.00 $26,000,00
30 8'FENCING LF 1,060 $50.00 $53,000.00
31 BACKSTOP FENCING LF 70 $450.00 $31,500.00
32 MAINTENANCE GATE EA 1 $3,000.00 $3,000.00
33 MAN GATE EA 3 $1,800.00 $5,400.00
34 FOUL POLE PAIR EA 1 $7,000.00 $7,000.00
35 SAFETY NETTING LF 400 $400.00 $160,000.00
36 BLEACHERS EA 2 $10,000.00 $20,000.00
37 PLAYERS BENCH EA 2 $4,000.00 $8,000.00
38 PLAYERS BENCH SHELTER COVER EA 2 $35,000.00 $70,000.00
39 DRINKING FOUNTAIN EA 1 $8,500.00 $8,500.00
40 PICNIC SHELTER(24'X34') EA 1 $125,000.00 $125,000.00
41 SCOREBOARD EA 1 $10,000.00 $10,000.00
SUBTOTAL $527,400.00
PLAYGROUND
42 PLAYGROUND EQUIPMENT LS 1 $700,000.00 $700,000.00
43 PLAYGROUND PIP SURFACING SF 17,000 $32.00 $544,000.00
44 BIG BLOCK RETAINING WALL SF 500 $100.00 $50,000.00
45 SECURITY FENCING LF 200 $400.00 $80,000.00
46 BOLLARD LIGHTING EA 12 $5,000.00 $60,000.00
47 SEATING PLAZA CONCRETE SF 3000 $16.00 $48,000.00
48 RECEPTACLES EA 4 $1,200.00 $4,800.00
49 PICNIC TABLES EA 16 $3,500.00 $56,000.00
50 UMBRELLAS(DOUBLE) EA 4 $40,000.00 $160,000.00
51 BENCHES EA 20 $2,500.00 $50,000.00
52 BIKE RACK EA 10 $400.00 $4,000.00
SUBTOTAL $1,756,800.00
COURTS AND MISC
53 DISC GOLF(NEW HOLES) LS 1 $45,000.00 $45,000.00
54 FULL BASKETBALL COURT EA 1 $50,000.00 $50,000.00
55 DOUBLE PICKLEBALL COURT EA 1 $125,000.00 $125,000.00
SUBTOTAL
$220,000.00
LANDSCAPING&RESTORATION
56 TURF SEED W/HYDROMULCH AC 5 $10,000.00 $50,000.00
57 EC BLANKET SY 5000 $3.00 $15,000.00
58 TREES EA 50 $800.00 $40,000.00
59 SHRUBS&PERENNIALS LS 1 $24,000.00 $24,000.00
No. I Item Units Quantity Unit Price
SUBTOTAL $129,000.00
TOTAL BASE BID SCHEDULE $9,334,6S0.00
15%DESIGN, ENGINEERING&PERMIT FEES $1,400,197.50
15%CONTINGENCY+MOBILIZATION $1,400,197.50
TOTAL ESTIMATED BASE BID+CONTINGENCY $12,135,045.00
No. Item Units Quantity Unit Price Total Price
ALTERNATE BID ITEMS
BALLFIELD IMPROVEMENTS(1)
1 AGG-LIME(FOUL LINE WARNING TRACKS) CY 60 $130.00 ---$.7.80.Uo'
2 8' FENCING LF 1,060 $50.00 $53,000.00
3 BACKSTOP FENCING LF 70 $450.00 $31,500.00
4 MAINTENANCE GATE EA 1 $3,000.00 $3,000.00
5 MAN GATE EA 3 $1,800.00 $5,400.00
6 FOUL POLE PAIR EA 1 $7,000.00 $7,000.00
7 BLEACHERS EA 2 $10,000.00 $20,000.00
8 PLAYERS BENCH EA 2 $4,000.00 $8,000.00
9 PLAYERS BENCH SHELTER COVER EA 2 $35,000.00 $70,000.00
10 SCOREBOARD EA 1 $10,000.00 $10,000.00
11 IRRIGATION(PER FIELD) EA 2 $23,000.00 $46,000.00
12 BATTING CAGES EA 2 $20,000.00 $40,000.00
13 WARM-UP MOUNDS EA 2 $5,000.00 $10,000.00
14 LIGHTING(PER FIELD) EA 2 $150,000.00 $300,000.00
SUBTOTAL $611,700.00
MISCELLANEOUS
15 LAWN COURT AREA LS 1 $250,000.00 $250,000.00
16 WAYFINDING SIGNAGE LS 1 $50,000.00 $50,000.00
17 POND OVERLOOK SEATING AREAS LS 1 $30,000.00 $30,000.00
18 FITNESS/CHALLENGE EQUIPMENT ENHANCEMENTS LS 1 $100,000.00 $100,000.00
SUBTOTAL $430,000.00
TOTAL ALT BID SCHEDULE $1,041,700.00
15%DESIGN,ENGINEERING&PERMIT FEES $156,255.00
15%CONTINGENCY+MOBILIZATION $156,255.00
TOTAL ESTIMATED ALT BID+CONTINGENCY $1,354,210.00
Attachment C
PROPERTY LINE
— — — — — — — — — — — — — — — — — — — — — — — —
f' 7
NATURAL THEMED SCREENING� 1
1 FUTURE NATURE ART FEATURE
1 a
1 NATURE THEMED PLAYGROUND
1
2BENCHES
1
8 PAVED TRAIL 1
NATURAL RESOURCE MANAGEMENT BY
OTHERS WITH MORE OPEN VIEWS INTO
PARK AROUND STORMWATER POND
1
FUTURE BOARDWALK/DECK
FUTURE NATURE BASED PUBLIC
ART ENTRY FEATURE 11
11
1
11
FUTURE/SEPARATE PROJECT: 1
PARALLEL PARKING WITH ADA STALL _ 11
ADJACENT TRAIL/WALK TO CREATE
ALOOP 1 '1
r� POTENTIAL RETAINING WALL
• 11 1
0-1
1 1
W
°o
1 L.- �IrA 1 1
1 1
1 •� ( _ ii ' 1
1
- - - - - - — — — — — — — — — — — — —
- - - uunuu
SILVER LAKE ROAD
FUTURE NATURE BASED PUBLIC
ART ENTRY FEATURE
4:t
EXISTING SIDEWALK
ADDED CROSSWALK
oodcrest
, 40,
�.
Mounds View,Mil �maa� ws b
November 18,2024 WSB Project number:024973-000 Sc,le 1;,Fee[
Attachment C
Example imagery of inclusive playgrounds(playground design that integrates varying physical,sensory,and cognitive play together.Includes
accessible rubber surfacing and play elements with adaptive uses,graduated challenge,imaginary/creative play,and accounts for varying age
levels including adults&caregivers)
� .
Image Source:playlsi.com i 14--> >
- � e
a1 ,
z.
i
i
i
Example imagery of nature inspired play(manufactured equipment that reflects natures or includes natural materials)
Inr;w S;u—,vipa:om Image Source:&Veelm 9w
qkj x~
i 1
l yi-_r
K K
3
L
o
f Mounds View,MN WSb
JULY,2026 WSB Project number:024973-000
Attachment D
ESTIMATED OF PROBABLE COSTS
No. I Item Units Quantity Unit Price Total Price
GENERAL CONSTRUCTION
1 REMOVALS-GENERAL LS 1 $3,000.00 $3,000.00
2 GENERAL EARTHWORK LS 1 $25,000.00 $25,000.00
3 CONSTRUCTION EXIT EA 1 $2,500.00 $2,500.00
4 EROSION CONTROL(REDUNDANT) LF 1500 $7.00 $10,500.00
5 RESTORATION(SEED) LS 1 $4,000.00 $4,000.00
6 8'WIDE BITTRAILS LF 1500 $40.00 $60,000.00
7 CONCRETE PADS SF 120 $16.00 $1,920.00
8 CONCRETE PED RAMP EA 1 $3,500.00 $3,500.00
9 PLAYGROUND-NATURAL THEMED LS 1 $120,000.00 $120,000.00
10 RECEPTACLES EA 2 $1,200.00 $2,400.00
11 BIKE RACK EA 3 $400.00 $1,200.00
12 " BENCHES EA 2 $2,500.00 $5,000.00
TOTAL $239,020.00
15%DESIGN,ENGINEERING&PERMIT FEES $35,853.00
15%CONTINGENCY+MOBILIZATION $35,853.00
TOTAL ESTIMATED BASE BID+CONTINGENCY $310,726.00
No. I Item Units Quantity Unit Price Total Price
ALTERNATE BID ITEMS
13 REMOVALS-GENERAL LS 1 $3,000.00 $3,000.00
14 GENERAL EARTHWORK LS 1 $30,000.00 $30,000.00
15 CONSTRUCTION EXIT EA 1 $2,500.00 $2,500.00
16 EROSION CONTROL(REDUNDANT) LF 350 $7.00 $2,450.00
17 RESTORATION(SEED W/BLANKET) LS 1 $2,000.00 $2,000.00
18 CROSSWALK LS 1 $2,500.00 $2,500.00
19 CONCRETE PIED RAMP EA 2 $3,500.00 $7,000.00
20 BITUMINOUS PARKING SY 100 $45.00 $4,500.00
21 D412 CURB&GUTTER LF 150 $30.00 $4,500.00
22 TRAFFIC SIGNS EA 1 $600.00 $600.00
23 STRIPING LS 1 $300.00 $300.00
24 8'WIDE CONCRETE WALK LF 350 $96.00 $33,600.00
25 RETAINING WALL SF 600 $100.00 $60,000.00
26 WALL SAFETY RAILING LF 100 $400.00 $40,000.00
27 SEATING DECK SF 1,500 $100.00 $150,000.00
28 PUBLIC ART LS 1 $20,000.00 $20,000.00
ALTERNATE TOTAL $362,950.00
15%DESIGN,ENGINEERING&PERMIT FEES $54,442.50
15%CONTINGENCY+MOBILIZATION $54,442.50
Attachment D
No. Item Units Quantity I Unit Price Total Price
TOTAL ESTIMATED ALT BID+CONTINGENCY $471,835.00
Attachment E
R . .
t4 J 1
r!1
e
n1.
.. 7711 A�
I. ps
V
o
y m
n
0 3 �LCHERS
c�
oxz
m,w
�y
i
`-I ono
ymm z
Tay m 3+ rm
� oG
op
1 0
0
Z
.h'1" s �t i, y�... T•~.. t 1 ' 'J`J �.+7,ti�•.- •1
i !
s `
�t ! r•
• ��'-Tit _ - ..
_��, — i , t
Attachment F
MEMORANDUM
To: Don Peterson,Director of Public Works/Parks and Recreation
From: Andrew Dahlquist I AD
Date: June 29,2026
Revised July 29,2026
Comm. No: 260201139
Subject: City of Mounds View
Community Center Study
Cost Estimates
As requested,below is a summary of project cost estimates for the different programmatic
components the City has been considering for the Mounds View Community Center expansion
project.
COMMUNITY CENTER ADDITIONS and RENOVATIONS
Exterior Improvements $ 200,000 $ 300,000
• Gym Addition Options
o One-Station Gym with On-Grade Walking Track $ 3,980,000 $ 5,480,000
o Two-Station Gym with On-Grade Walking Track $ 5,040,000 $ 6,980,000
• Fitness Expansion $ 410,000 $ 720,000
• Remodel Fitness into Offices $ 320,000 - $ 430,000
• Remodel Front Office/Reception/Mtg Rooms $ 320,000 - $ 430,000
• Office Addition $ 940,000 - $ 1,100,000
• New Locker Room Addition w/Showers&Toilets $ 1,470,000 - $ 1,680,000
COMMUNITY CENTER REPAIR OPTIONS
• All Maintenance Needs $ 7,060,000
• All Maintenance Needs(exlc roofs,solar,switchgear&RTUs) $ 4,220,000
• Maintenance Needs Scheduled Before 2029 $ 1,720,000
• Maintenance Needs labeled Critical,Poor&Fair before 2029 $ 250,000
AM/GOV-MN-CI_Mounds View/260201139/Admin/Letters&Memos/2026.07.29 Memo to Don Peterson
Wold Architects and Engineers PLANNERS
50 South 6th Street,Suite 2250 ARCHITECTS
Minneapolis,MN 55402
woldae.com 1 612 772 9025 ENGINEERS
Attachment G
BOND ISSUANCE INFORMATION
Bond Issue Amount $15,240,000
Number of Years 20
Average Interest Rate 4.140/6
Estimated Bond Rating S&P
AA
PROPERTY TAX INFORMATION
Actual Net Tax Capacity-Payable 2026 $16.107.203
Debt Levy @ 105%-Average 1,204,861
Estimated Tax Capacity Rate:
Payable-2026 Without Proposed Bonds 39.335'•6
Payable-2026 With Proposed Bonds 46.816%
Estimated Tax Rate Increase 7.480%
TAX IMPACT ANALYSIS
Estimated Market Value Proposed
Type of properw Market Value Exclusion Annual Monthly Daily
256 000 24 050 225 950 16902 1408 046
Homestead 300 000 19.11 50 230-150 20973 1748 0 57
333,500 16,535 316,965 237.10 19.76 0.65
350 000 15 050 334 950 250 55 2088 069
400 000 10 550 389 450 29132 2428 080
500,000 1.550 49?,.4501 1 372 35 1 31071 1.02
BOND ISSUANCE INFORMATION
Bond Issue Amount 520,285,000
Number of Years 20
Average Interest Rate 4.14%
Estimated Bond Rating SEEP
AA
PROPERTY TAX INFORMATION
Actual Net Tax Capacity-Payable 2026 $16.107.203
Debt Levy @ 105%-Average 1,603,75
Estimated Tax Capacity Rate:
Payable-2026 Without Proposed Bonds 39.335%
Payable-2026 V91ith Proposed Bonds 49.292
Es?irnated Tax?afe In.:.-ease 9.957
TAX IMPACT ANALYSIS
Estimated Market Value Proposed Tax Increase
T of Pro Market Value Exclusion -Daily
250 000 24 050 225 950 224 97' 1$75 062
Reridewuai 275 000 21 300 253 200 252 11I 210 069
Hfcme;3ead 300,000 19 550 230.156 279 24 23 271 077
333,500 16,535 316,965 315.60 26.30I 0.86
350 000 15 050 334 950 333 SO 2779 091
400 000 10 550 339 450 387 77 32 31 1061
500.000 1.550 493.450 1 496 30 4136 136
Stacie Kvilvano
Senior Municipal Advisor
0: (651) 697-3506 1 ehlers-inc.com
jg'wZEHLERS
Attachment G
Don. Per your request we prepared 2 GO bond options for your park improvements that
you plan to take to the voters (50bps cushion in rates). For the tax impacts to residential we
did a range with the average value home in MV highlighted in gray(please verify value). The
tax impact we show on an annual, monthly and daily basis which provides context for
residents (what am I spending per day for these improvements in relation to other things I
buy daily or monthly, etc.). We can refine/change etc. as needed.
1. Bond Amount$15,240,000
a. Nets$15M to the construction fund
b. 20 year term
c. True Interest Cost=4.14%
d. Average annual debt levy at 105% _$1.204M
e. Impact on average value home is$237/year or$19.67/mo and$.65/day
2. Bond Amount$20,285,000
a. Nets$20M to the construction fund
b. 20-year term
c. True Interest Cost=4.14%
d. Average annual debt levy at 105% _$1.603M
e. Impact on average value home is$315/year, $26/mo and $.86/day
Attachment H
To Be Handed Out At The Meeting
Attachment I
Grants&Funding Frcgrarn Research:
citN,of Mounds View ws b
Prepared in response to a request for community center improvement and park redevelopment funding
options for the City of Mounds View,located in Ramsey County, Minnesota.This memo emphasizes
opportunities that fit the city's size,likely service demographics,and stated project elements,including
inclusive recreation, indoor fitness,senior-serving space,and stormwater-related site improvements.
Relevance Rank Table
Opportunity Relevance
Community Facilities Direct Loan and Grant Very High
Program in Minnesota
Community Development Block Grant(CDBG)— Very High
Ramsey County/HUD
Minnesota Outdoor Recreation Grant Program High(Next Cycle)
Parks and Trails Legacy Fund(Met Council) High
Local Trail Connections Program High(Next Cycle)
DNRShoreland Grant Moderate
DEED—Redevelopment Grant Program Moderate
T-Mobile Hometown Grants Closed/Reference Only
Summary:USDA distributes loans and grants to communities to develop community facilities in rural areas.
E.g.Hospitals,civic centers,schools,and libraries.Develop essential community facilities in cities,
townships,and owns including Tribal lands-with no more than 20,000 residents.Healthcare facilities,public
facilities,community support service,educational services,utility services.
Target Applicants:Public bodies,community-based nonprofits,federally recognized tribes
Relevance:Strong fit for community center expansion,an indoor gym,indoor walking track,fitness room
improvements,and spaces serving seniors,youth,and adults with disabilities.Good demographic fit because
Mounds View has a population under 20,000 and a notable share of older adults,which supports the city's
senior-focused fitness and walking track concepts.
Key Dates:
Status:Open
Application Timing: Rolling
Funding Details:
• Funding Source:Federal
Database Status:Open
Match Requirement: No fixed match requirement; however,grants typically cover only a portion of total
project costs(often 15%-75%),requiring the remainder to be covered through local funding or loans.
Attachment I
Grants&Funding Program Research 1
City of Mounds View ` /► /(�b
Motes: Best suited for essential public facility improvements.Projects such as community centers,public-
use indoor recreation spaces,and related equipment are explicitly aligned with program intent.
Oink: Co _nityFa�iLt S_ it ct Loan an Grant Program in Miriau
Summary:Provide funds to assist local governments in acquiring parkland and developing outdoor rec.
facilities in local and community parks across the state.Develop outdoor recreation facilities in local parks
and communities across the state.
Target Appl'ocants:Cities,counties,townships
Relevance:Strong fit for baseballfield improvements,inclusive playgrounds,pickleball and basketball
courts,trails,shelters, parking improvements,and other park redevelopment elements.Good fit because the
city's project list emphasizes outdoor recreation,accessibility,and multi-generational use.An inclusive
playground and trail improvements are especially aligned.
Key Dates:
• Status:Closed/Annual
Funding Details:
• Funding Source:State
• Award Ceiling/Typical Award:$10,000-$500,000
• Database Status:Closed;FY 27 Funds forecasted.
Match Requirement:50%required match(cash or in-kind).
Notes:Not currently open."Federal funding available for FY 2027 has not yet been allocated but should be at
Least$3.5 million for the Outdoor Recreation Grant Program and the Natural and Scenic Areas Grant
Program."
Oink: td r Recreat,o,, Grant Program
Summary:Provides ongoing statewide funding from Minnesota's Legacy Amendment(through 2034)to
support parks and trails of regional or statewide significance,including infrastructure reinvestment,land
acquisition,and expanded recreational opportunities.
Attachment I
Grants 8. unding Pro gram Res-.=rc".
City of Mounds View ws b
Target Applicants: Funding is distributed to regional park implementing agencies in the Twin Cities metro
area;cities typically access funds through partnership with those agencies.
Relevance:Strong alignment with park redevelopment components such as trails, recreation amenities,and
Long-term reinvestment in park infrastructure.Could support elements like trails,accessibility improvements,
and regional parkfeatures if the project is tied to regional system priorities.
Partial Limitation:funding must meet regional or statewide significance criteria,so direct eligibility depends
on partnership and project classification.
Key Points:
• Funding originates from a dedicated state sales taxthrough 2034.
• Supports infrastructure reinvestment,land acquisition,and expanded recreation access.
• Projects must align with the Parks and Trails Legacy Plan and regional priorities.
Match Requirement:No direct match requirement at the city level;funding is formula-distributed to regional
agencies.Local contribution expectations depend on the partnering agency and project structure.
Motes:This is not a direct application grant for most cities.Mounds View would likely need to partner with a
regional park agency to access funding.Still,it is a critical funding stream to layer into larger park
redevelopment strategies.
Link: Parks and Trails Legacy Fun
Summary:Provides reimbursement-based grants to assist local governments in developing short trail
connections that link residential areas to parks,trails,open space,and other public destinations.The program
focuses on improving connectivity and access rather than constructing large standalone trail systems.
Target Applicants:Cities,counties,townships
Relevance:Strong fit for trail development and connectivity components of Mounds View's park
redevelopment,particularly linking neighborhoods to parks,trails,and recreation areas.This is especially
useful for smaller,targeted trail segments that complement larger park improvements and improve
accessibility for residents.
Key Dates:
• Status:Open/Annual
• Application Deadline:March 31,2026
• Awards Announcement:Summer 2026
Funding Details:
Attachment I
Grants&Funding Program Research:
City of Mounds View ws b
Award Ceiling/Range:$5,000-$250,000
• Funding Structure: Reimbursement-based;up to 75%of total eligible project costs
Database Status:Open;FY27 funds anticipated
Match Requirement:Minimum 25%non-state cash match required(no other state or Met Councilfunds
allowed as match).
Notes:Projects must create a functional trail connection open to the public and link residential areas to
parks,trails,or other destinations.Acquisition is only eligible when paired with development and requires a
perpetual easement.Development projects require a 20-year maintenance commitment. Program is best
suited for smaller connection projects ratherthan full park buildouts.
Lank: M—nnes_o_ta DNR Local Trail Connections Program
Summary:The Natural Resources Block Grant is a composite of base grants available to local gov.units to
help them implement programs designed to protect and improve water resources.Meant to enhance the
quality of surface waters,preserve the economic values of shorelands.Must have DNR approved shoreland
ordinance.
Target Applicants:State and local government
Relevance:Useful if the city's park redevelopment includes stormwater,drainage,shoreline,or water-quality-
related elements tied to site improvements. Partial fit.Better suited to the stormwater and environmental
portions of the parking lot/site redevelopment than recreation amenities themselves.
Key Dates:
Status:Open
Application Timing:Rolling
Funding Details:
Funding Source:State
Database Status:Open
Match Requirement:Typically requires a 1:1 local match(100%match).
Notes:This is not a core recreation grant,but it may help support stormwater and water-resource protection
components if those are part of the broader redevelopment scope.
Link: DNR Snoreland C ragt
Attachment I
Grants&Funding Program Research:
City of Mounds View ws b
Summary:The Redevelopment Grant Program administered by DEED helps communities with the cost of
redevelopment blighted industrial, residential,or commercial sites and puttingthem back into productive use.
Priority is given to projects displaying one or more of the following characteristics:the redevelopment
potential,contribution of tax increment financing,proximity to public transit,affordable housing and
consideration of environmental impact.
Acquisition of land,demolition,infrastructure improvements(including environmental infrastructure),soil
stabilization when infill is required,adaptive reuse of buildings(specifically remedial activities such as
asbestos abatement).
Target Applicants:Eligible applicants are cities,counties,port authorities, housing and redevelopment
authorities,and economic development authorities.
Relevance: Potential fit if the project is part of a larger redevelopment area and includes demolition,site
preparation,infrastructure,or broader neighborhood revitalization components.Most useful if the city can
frame the park or facility work as part of a redevelopment strategy with documented site or corridor
reinvestment goals.
Key Dates:
• Status:Open
Funding Detains:
• Funding Source:State
• Database Status:Open
Match Requirement:50%local match required(grant covers up to 50%of eligible costs).[mn.gov]
Notes:Less direct than a parks or community facilities grant,but potentially valuable for site and
infrastructure costs if the location involves redevelopment conditions.
Link:DEED -Redevetop.ment Grant Program
Summary:Community Development Block Grant funding can support eligible public facility,infrastructure,
and community development activities that principally benefit low-to moderate-income residents or meet
another HUD national objective.
Target Applicants: Local governments and eligible subrecipients within suburban Ramsey Countyfor county-
administered CDBG activities.
Attachment I
Grants&Funding Program Research
City of Mounds View ` A s b
Relevance:Strong strategic fit for community center improvements,accessibility upgrades,and eligible
park/public facilitywork if the project benefits low-to moderate-income residents or qualifies under another
FEUD national objective. Potentially strong demographic fit if the city can document benefit to low-to
moderate-income residents,seniors,youth at risk,or adults with disabilities,or if the project is located in a
qualifying low-to moderate-income area.
Key Dates:
Status:Annual local solicitation
Expected Ramsey County solicitation:Summer 2026(per Ramsey County website)
Funding Details:
Funding Source:Federal
Award Ceiling/Typical Award:Varies
Database Status:Annual local solicitation
Match Requirement:No formal match requirement at the federal level; however,local leveraging is strongly
encouraged and often improves competitiveness.[ramseycountymn.gov]
Notes:This is not in the database as an open Minnesota-specific entry,but it is one of the most important
funding paths to discuss because Ramsey County administers CDBG for eligible suburban projects.
Link: Community.Development Block GrantUCDBG)—Ra_m_sey noun /HUD
Summary: Included as context only.It is not an active path for submission now,but it demonstrates the type
of placemaking project that fits Mounds View's scope.
Target Applicants: Included as context only.It is not an active path for submission now,but it demonstrates
the type of placemaking project that fits Mounds View's scope.
Relevance:Would have been a strong fit for refreshing community spaces such as parks,ballfields,trails,and
community gathering areas.Strong population fit because Mounds View is under 50,000 residents.
Key Dates:
• Status:Closed/Final phase completed/Potential for future funding availability
Funding Details:
Funding Source:Federal
Database Status:Closed
Match Requirement:No formal match requirement.
Attachment I
Grar:ts?--Fundin:cF m Res eE 1 c�:
Ciyo�Mounds ws b
Notes:Included as context only.It is not an active path for submission now, but it demonstrates the type of
placemaking project that fits Mounds View's scope.
Link: T•Mobile Hometown Grant
Attachment J
Executive Summary:Communications&Engagement Plan
MotM1 VIEW 2026 Mounds View Bond Program Overview wS b
The City of Mounds View has developed a comprehensive communications and engagement strategy to support
the 2026 bond program.The goal is to ensure residents are well-informed, have access to clear and factual
information,and can participate meaningfully in the decision-making process.
The plan aligns with City priorities for transparency,accessibility, and community-wide outreach, and integrates
communications,engagement, and education into a coordinated approach leading up to the November 2026
election.
Goals and Objectives
The communications effort is guided by four primary objectives: increasing awareness and understanding of the
bond program, including projects, costs, and process; building trust through transparent,consistent,and easy-to-
understand information;ensuring equitable access to information across the community; and providing
opportunities for two-way engagement and feedback.Success will be measured through website engagement,
event participation,and overall communication reach.
Approach
The strategy uses a phased, multi-channel approach that combines digital, print,and in-person engagement to
reach residents in different ways. Key principles include ensuring communication remains neutral, informational
communication is aligned with legal requirements,is plain-language and accessible, and is prepared in a
consistent voice.
Audiences
The plan prioritizes broad outreach while tailoring strategies for key groups.
Primary audiences: Residents (homeowners and renters),families,seniors,and apartment residents
• Secondary audiences: Local businesses,school district partners, community organizations, and
stakeholders
This approach ensures Citywide access to information while addressing harder-to-reach populations.
Communications Channels
A coordinated mix of channels will be used to maximize reach:
• Digital: City website(central information hub); social media (including Facebook and Instagram); email
and e-newsletters; and a video-recorded presentation.
• Print:City newsletter inserts(August and October); utility billing inserts; and postcard mailer with QR
code.
In-person:Community meetings and briefings; Pop-up engagement at events; presentations to boards
and community groups.
These efforts are supported by core materials such as a bond overview, project fact sheets, and FAQs.
Engagement Strategy
The plan emphasizes both information sharing and active engagement through:
3 Community events and pop-up outreach including the Ice Cream Social (July), Night to Unite (August),
and Festival in the Park(August)
Attachment J
• Stakeholder briefings and information sharing
• Targeted outreach to seniors and apartment residents
• Ongoing opportunities for questions and feedback
These activities provide accessible, informal opportunities for residents to learn and engage.
Timeline
Communications are aligned with key milestones:
• June—July: Finalize messaging and launch materials
July—August: Begin print and digital outreach; newsletter distribution and events
• Fall (Sept—Nov):Ongoing communication and ballot education
• October 17: Early voting begins
November:Election Day
Messaging will evolve from general awareness to detailed information and ballot education.
Materials and Support
A coordinated set of materials will support communication and consistency, including:
Bond overview and project fact sheets
• Website content and FAQs
• Newsletter,social media, and presentation content
• Video and digital materials
A communications toolkit will be available to staff and elected officials to ensure consistent messaging.
Risk Considerations
Risk considerations focus on maintaining clear, consistent, and trustworthy communication throughout the
process.This includes ensuring all messaging remains informational and non-advocacy in nature, proactively
addressing common questions about costs and project priorities, monitoring and responding to misinformation,
and maintaining consistency across all communication channels.
Summary
This communications and engagement plan provides a clear,transparent,and community-focused framework to
support the 2026 bond program. By combining consistent messaging, multiple outreach channels, and
meaningful engagement opportunities,the City is positioned to:
• Ensure residents understand the bond program
• Provide accessible, accurate information
• Support informed decision-making at the ballot box