Laserfiche WebLink
HSIP Grant Requirements <br />1. Design needs to be consistent with <br />standards <br />2. A federal environmental document (project <br />memorandum) needs to be completed <br />3. Any right of way acquisition must follow the <br />federal process <br />4. Project must be delivered by June, 2016 <br />Project Challenges <br />(why project is starting now instead of 2015) <br />1. Limited right of way for construction of <br />sidewalks <br />2. Slopes, utilities, trees, landscaping and <br />driveways along 37th and Stinson <br />3. Coordination with multiple jurisdictions (two <br />counties and three cities) <br />4. CP Railway coordination <br />