My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 07142015
StAnthony
>
City Council
>
City Council Packets
>
2015
>
CC PACKET 07142015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 9:24:05 AM
Creation date
9/9/2015 8:37:17 AM
Metadata
Fields
Template:
City Council
Meeting Date
7/14/2015
Meeting Type
Regular
Document Type
Council Agenda/Packets
Address
2926 Armour Terrace
PIN
0602923430104
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />City Engineer Hubmer explained that the 2016 street and utility project was previously proposed 2 <br />for Skycroft Drive south of 36th, however, based on a number of concerns and the possibility of 3 <br />partnering with the City of Columbia Heights, the 2016 street and utility improvement project is 4 <br />proposed to be changed to include street and utility reconstruction on Stinson Boulevard from 5 <br />37th Avenue to Silver Lane and on 37th Place from Stinson Boulevard to 3rd Avenue in Columbia 6 <br />Heights. He presented the project schedule and stated that three public information meetings 7 <br />will be held as well as the public hearing for the project and assessments and construction is 8 <br />anticipated to begin in May 2016 with substantial completion in October 2016. 9 <br /> 10 <br />Motion by Councilmember Stille, seconded by Councilmember Brever, to adopt Resolution 15-11 <br />041 Ordering Preparation of Feasibility Report for the 2016 Street and Utility Improvements. 12 <br /> 13 <br />Motion carried 4-0. 14 <br /> 15 <br />B. Resolution 15-042 Awarding Bid for Construction of Regional Stormwater Research 16 <br />Facility. Todd Hubmer, City Engineer, presenting. 17 <br /> 18 <br />City Engineer Hubmer advised that four bids were received for construction of the regional 19 <br />stormwater research facility and the lowest responsible bidder is St. Paul Utilities and 20 <br />Excavating, Inc., at $1,494,860. He explained this project has been pending for a number of 21 <br />years and due to inflationary factors and other changes in the design to accommodate MWMO’s 22 <br />desires, contract costs were approximately $1.6 million; as a result, staff worked with the 23 <br />contractor and eliminated some of the design elements that resulted in significant cost savings 24 <br />without changing the operational performance of the facility and a Change Order has been 25 <br />negotiated resulting in a net decrease of $113,500 for a contract price of $1,381,360. He added 26 <br />that construction will not start until all permits and agreements for the project have been received 27 <br />from the City of Minneapolis. 28 <br /> 29 <br />Motion by Councilmember Jenson, seconded by Councilmember Brever, to adopt Resolution 15-30 <br />042 Awarding a Bid for the St. Anthony Stormwater Research Facility Project. 31 <br /> 32 <br />Motion carried 4-0. 33 <br /> 34 <br />C. Amendment to the St. Anthony Regional Stormwater Research Facility Capital Project 35 <br />Agreement. Todd Hubmer, City Engineer, presenting. 36 <br /> 37 <br />City Engineer Hubmer explained that the City’s existing agreement with MWMO for the 38 <br />Stormwater Research Facility provided $1,209,000 in funding and the MWMO Board recently 39 <br />agreed to increase its grant to $1,609,000 to cover the cost of construction of the facility. 40 <br /> 41 <br />Motion by Councilmember Stille, seconded by Councilmember Jenson, to approve Mississippi 42 <br />Watershed Management Organization Amendment One to Capital Project Agreement (MWMO 43 <br />Agreement #204-12-01). 44 <br /> 45 <br />Motion carried 4-0. 46 <br /> 47 <br />4
The URL can be used to link to this page
Your browser does not support the video tag.