My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 07142015
StAnthony
>
City Council
>
City Council Packets
>
2015
>
CC PACKET 07142015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 9:24:05 AM
Creation date
9/9/2015 8:37:17 AM
Metadata
Fields
Template:
City Council
Meeting Date
7/14/2015
Meeting Type
Regular
Document Type
Council Agenda/Packets
Address
2926 Armour Terrace
PIN
0602923430104
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> 4. Plans and specifications shall be approved by the city councils of Columbia Heights <br />and Saint Anthony prior to releasing an advertisement for bids. Contract award to the lowest <br />responsible bidder will be conducted by Saint Anthony. <br /> <br /> 5. Construction engineering, including bid openings, contract administration, other <br />agency submittals, staking, and contract management shall be performed by Saint Anthony. <br /> <br />6. Construction observation for water and sewer improvements will be the <br />responsibility of the City whose system is being improved. For Example, Columbia Heights <br />watermain improvements will be observed by a city of Columbia Heights representative and <br />constructed to its design standards. Saint Anthony watermain improvements will be observed by a <br />city of Saint Anthony representative and constructed to its design standards. <br /> <br />7. Construction observation for street, sidewalk, and storm sewer improvements will be <br />the responsibility of Saint Anthony. <br /> <br /> 8. All monthly progress payments to the contractor for any Improvements shall be <br />reviewed and agreed upon by both Columbia Heights and Saint Anthony project representative prior <br />to release of payment. Final contract payment shall occur only after final acceptance of the <br />Improvements by the city council of Columbia Heights and the city council of Saint Anthony. <br /> <br /> 9. Saint Anthony shall invoice Columbia Heights for reimbursement of Columbia <br />Heights’s portion of the costs of the Improvements in accordance with this Agreement. <br /> <br />SECTION B <br />COST ALLOCATION <br /> <br />1. Final Design Costs <br /> a. Each party will pay their pro-rated share of design costs for the <br />Improvements. The final design costs of the Improvements shall include, but not be limited to the <br />following: data collection, preparation of drawings and exhibits, and preparation of plans and <br />specifications. Saint Anthony will contract for these final design services with an engineering <br />consulting firm, WSB and Associates, Inc. (WSB). WSB will invoice the City of Saint Anthony <br />directly for this work. <br /> <br />2. Project Administration Costs <br />a. Each party will pay 50% of the project administration costs for the <br />Improvements. The project administration costs for the Improvement shall include, but not be <br />limited to the following: bidding, contractor contracts, project management, pay vouchers, and <br />change orders. Saint Anthony will contract for these project administration services with WSB. <br />WSB will invoice the City of Saint Anthony directly for this work. <br /> <br /> 3. Construction Observation Costs <br />a. Each party will pay 50% of all costs of the construction observation of the <br />street, watermain and storm sewer improvements. Saint Anthony will contract for these construction <br />80
The URL can be used to link to this page
Your browser does not support the video tag.