My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09082015
StAnthony
>
City Council
>
City Council Packets
>
2015
>
CC PACKET 09082015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 9:22:02 AM
Creation date
9/9/2015 8:41:34 AM
Metadata
Fields
Template:
City Council
Meeting Date
9/8/2015
Meeting Type
Regular
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> Engineering Planning Environmental Construction 701 Xenia Avenue South <br /> Suite 300 <br /> Minneapolis, MN 55416 <br /> Tel: 763-541-4800 <br /> Fax: 763-541-1700 <br /> <br />Minneapolis St. Cloud <br /> Equal Opportunity Employer <br /> <br />September 2, 2015 <br /> <br />The Honorable Mayor, City Council and Staff <br />c/o Mark Casey <br />City of St. Anthony Village <br />3301 Silver Lake Road NE <br />Minneapolis, MN 55418-1603 <br /> <br />Re: 2016 Street and Utility Improvement Project <br /> St. Anthony Village, MN <br /> WSB Project No. 2170-13 <br /> <br />Dear Honorable Mayor, City Council, and Staff: <br /> <br />We are pleased to present to you the attached 2016 Street and Utility Feasibility Report for the following <br />improvements: <br /> <br />Street & Utility Reconstruction <br /> Stinson Boulevard from 37th Avenue NE to Silver Lane NE <br /> 37th Place N from Stinson Boulevard to 37th Avenue NE (Columbia Heights <br />Improvements) <br />Trail and Sidewalk Improvements <br /> 8’ bituminous trail along west side of Stinson Boulevard between 37th Place N and <br />40th Avenue NE (Columbia Heights improvements) <br /> Salo Park sidewalk replacement <br />Railroad Crossing Improvements <br /> Replace existing crossing on Stinson Boulevard NE located between 37th Avenue NE <br />and 37th Place NE. (This design anticipates the future HSIP project being <br />constructed) <br />Decorative Lighting <br /> East side of Stinson Boulevard NE between 37th Avenue NE and Silver Lane NE. <br /> <br />Attached for your consideration is a resolution accepting the feasibility report and authorizing preparation <br />of final plans and specifications. <br /> <br />Justin Messner will be available to answer your questions at your September 8th, 2015 Council Meeting or <br />you may call me at (763) 287-7182. <br /> <br />Sincerely, <br /> <br />WSB & Associates, Inc. <br /> <br /> <br /> <br />Todd E. Hubmer, PE <br />City Engineer <br /> <br />Attachments <br />39
The URL can be used to link to this page
Your browser does not support the video tag.