Laserfiche WebLink
<br /> <br />2016 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 2170-13 PAGE 13 <br />7. FEASIBILITY AND RECOMMENDATION <br />Project costs are anticipated to be approximately $3.90 million. <br /> <br />Due to the poor structural condition of Stinson Boulevard NE, the deterioration of the <br />existing sanitary sewer and storm sewer systems, and frequent water main breaks, this <br />project is both feasible and necessary from an engineering standpoint. Alternative <br />methods of improving the utility systems and roadways are not feasible or cost effective <br />due to the location and condition of the existing utilities and the existing soils conditions. <br /> <br />Based on our analysis and data presented, the proposed project is feasible, necessary, and <br />cost effective from an engineering standpoint. We recommend reconstruction of the <br />sanitary sewer, water main, stormwater collection system, and the street as detailed in this <br />report. <br />57