Laserfiche WebLink
No. Mat. No.Item Units Estimated <br />Unit Price <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />ST ANTHONY, MN <br />September 1, 2015 <br />OPINION OF PROBABLE COSTS <br />2016 STREET AND UTILITY RECONSTRUCTION <br />PROJECT NO. 2170-130 <br />SCHEDULE B.1 - SANITARY SEWER IMPROVEMENTS (ST. ANTHONY VILLAGE) <br />116 2104.501 REMOVE SEWER PIPE (SANITARY)LIN FT 1500 $2.00 $3,000.00 <br />117 2104.509 REMOVE SANITARY SEWER SERVICE EACH 6 $100.00 $600.00 <br />118 2104.509 REMOVE MANHOLE (SANITARY)EACH 6 $350.00 $2,100.00 <br />119 2451.602 AGGREGATE BEDDING (LV)CU YD 200 $45.00 $9,000.00 <br />120 2503.601 SANITARY SEWER BYPASS PUMPING LUMP SUM 1 $10,000.00 $10,000.00 <br />121 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 2 $2,000.00 $4,000.00 <br />122 2503.602 CONNECT TO EXISTING SANITARY SEWER SERVICE EACH 6 $300.00 $1,800.00 <br />123 2503.602 CHIMNEY SEAL (INTERNAL)EACH 6 $350.00 $2,100.00 <br />124 2503.602 8"X6" PVC WYE EACH 6 $500.00 $3,000.00 <br />125 2503.603 6" PVC PIPE SEWER - SDR 26 LIN FT 120 $28.00 $3,360.00 <br />126 2503.603 TELEVISE SANITARY SEWER LIN FT 1500 $1.75 $2,625.00 <br />127 2503.603 8" PVC PIPE SEWER - SDR 35 LIN FT 1500 $40.00 $60,000.00 <br />128 2506.516 CASTING ASSEMBLY (SANITARY)EACH 6 $800.00 $4,800.00 <br />129 2506.603 CONST 48" DIA SAN SEWER MANHOLE LIN FT 59 $200.00 $11,800.00 <br />$118,185.00 <br />$17,727.75 <br />$135,912.75 <br />$33,978.19 <br />$169,890.94TOTAL SCHEDULE B.1 - SANITARY SEWER IMPROVEMENTS (ST. ANTHONY VILLAGE) <br />SUBTOTAL SCHEDULE B.1 - SANITARY SEWER IMPROVEMENTS (ST. ANTHONY VILLAGE) <br />+ 15% CONTINGENCIES <br />SUBTOTAL SCHEDULE B.1 - SANITARY SEWER IMPROVEMENTS (ST. ANTHONY VILLAGE) <br />+ 25% ADMINISTRATIVE, LEGAL, ETC. <br />73