My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 15-056 Receiving Feasibility Report and Ordering Plans for the 2016 Street and Utility Improvements
StAnthony
>
City Council
>
City Council Resolutions
>
2015
>
RES 15-056 Receiving Feasibility Report and Ordering Plans for the 2016 Street and Utility Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 8:33:46 AM
Creation date
9/9/2015 8:57:04 AM
Metadata
Fields
Template:
City Council
Meeting Date
9/8/2015
Meeting Type
Regular
Document Type
Council Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ST. ANTHONY VILLAGE <br />RESOLUTION 15-056 <br />A RESOLUTION RECEIVING FEASIBILITY REPORT AND <br />ORDERING PLANS AND SPECIFICATIONS <br />FOR THE 2016 STREET AND UTILITY IMPROVEMENTS <br />WHEREAS, pursuant to resolution of the Council adopted June 23, 2015, a report was <br />prepared by WSB & Associates, Inc. with reference to the improvement of the <br />2016 Street and Utility Improvement Project, and <br />WHEREAS, the City of St. Anthony Village has entered into a cooperative agreement with the <br />City of Columbia Heights, to construct certain City improvements as part of the <br />2016 Street and Utility Improvement Project, and <br />WHEREAS, the Feasibility Report recommends the following street and utility improvements <br />in 2016: <br />Street & Utility Reconstruction <br />■ Stinson Boulevard from 37th Avenue NE to Silver Lane NE <br />■ 37th Place N from Stinson Boulevard to 37th Avenue NE <br />Trail and Sidewalk Improvements <br />■ 8' bituminous trail along west side of Stinson Boulevard between 37th Place N <br />and 40th Avenue NE (This is a Columbia Heights improvement) <br />■ Salo Park sidewalk replacement <br />Railroad Crossing Improvements <br />■ Replace existing crossing on Stinson Boulevard NE located between 37th Avenue <br />NE and 37th Place NE. (This design anticipates the future HSIP project being <br />constructed) <br />Decorative LiAting <br />■ East side of Stinson Boulevard NE between 37th Avenue NE and Silver Lane NE. <br />WHEREAS, the report provides information regarding whether the proposed project is <br />necessary, cost effective, and feasible. <br />NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of St. Anthony <br />Village that: <br />I) The Council will consider the improvement of such streets in accordance with the report <br />at an estimated total cost of the improvement of $3,898,960. <br />2) WSB & Associates, Inc. is hereby designated as the engineer for this improvement. They <br />shall prepare plans for making such improvement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.