Laserfiche WebLink
City Council Regular Meeting Minutes <br />September 8, 2015 <br />Page 6 <br />2 Street & Utility Reconstruction <br />3 • Stinson Boulevard from 376 Avenue NE to Silver Lane NE <br />4 • 37th Place N from Stinson Boulevard to 37`h Avenue NE (Columbia Heights <br />5 Improvements) <br />6 <br />7 Trail and sidewalk Improvements <br />8 • 8' bituminous trail along west side of Stinson Boulevard between 37t' Place N and 40`h <br />9 Avenue NE (Columbia Heights improvements) <br />10 • Salo Park sidewalk replacement <br />11 <br />12 Railroad Crossing Improvements <br />13 • Re lace existing crossing on Stinson Boulevard NE located between 371' Avenue NE and <br />14 37 Place NE (This design anticipates the future HSIP project being constructed) <br />15 <br />16 Decorative Lighting and sidewalk Improvements <br />17 • Ease side of Stinson Boulevard NE between 37th Avenue NE and Silver Lane NE <br />18 <br />19 The timing on this project was revised in June 2015. They have received a number of complaints <br />20 due to the condition of Stinson Blvd as well as some water main breaks. The sidewalk <br />21 improvements will be done with the HSIP program. <br />22 <br />23 Mr. Messner stated the Sanitary Sewer will be replaced with an 8 -inch plastic pipe along with all <br />24 the manholes. There are actually two sanitary sewers along this roadway and Columbia Heights <br />25 does not plan to replace their sanitary sewer at this time however they will replace all manholes. <br />26 <br />27 Mr. Messner stated a number of drainage improvements will be done in the area. The project <br />28 cost is $3.9M. 35% of the improvements are assessable in the residential areas. The City will <br />29 apply for State Aid funding for these improvements. Mr. Messner reviewed the St. Anthony <br />30 Funding Sources, assessable and City portions, and Columbia Heights participation in the cost. <br />31 He reviewed the funding sources as Special Assessments, Street & Utility Reconstruction Funds <br />32 and Municipal State Aid Funds. <br />33 <br />34 Mr. Messner reviewed the Project Schedule. Construction would begin in May 2016 and final <br />35 paving would be done in June 2017. <br />36 <br />37 Councilmember Jenson asked what percentage the MSA would pay and Mr. Messner stated the <br />38 City is eligible to request the total amount for street reconstruction and a calculation of the storm <br />39 sewer reconstruction can be requested. Within the next few years we will start incurring a State <br />40 Aid Fund balance. We will make the claim and as money is put back into the fund it will be <br />41 returned to us for use. It generally runs between 55 -60% of participation on the State side for the <br />42 storm sewer. <br />43 <br />44 <br />45 Mayor Faust asked if it would be safe to say that because we have been building roads, that we <br />46 used up our MSA credit with the State. Whereas if we haven't been building roads we would <br />