My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 05182015
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2015
>
PL PACKET 05182015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 8:42:17 AM
Creation date
12/1/2015 8:33:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft revised 5.12.2015- <br />(a) Any solar installation on a light pole shall require the issuance of a conditional use Hermit. <br />and shall take into account the surrounding land uses, the proposed visual impact. and the <br />structural integrity relative to size and height of the proposed solar installation. No lightnole <br />mounted solar installation shall exceed 3 square feet in size, unless through the issuance of a <br />conditional use permit. <br />(C) Design and Performance Standards. In addition to the standards required above. the Following <br />standards shall apply to all solar energy systems. <br />(1) Compatibility with nearby properties. The visual impact of rooftop equipment on nearby <br />properties shall be minimized through such means as location on the roof flush -mounting to the roof. <br />screening, or other integration into the roof design. Screening shall be of durable nermanent materials <br />that are compatible with the primary building materials. Screening shall be done to the extent <br />possible without reducing the systems efficiency. <br />21 Feeder lines. Any lines accompanying a solar energy systems, other than those attached to <br />on-site structures by leads, shall be buried within the interior of the subject parcel, unless there are <br />existing lines in the area which the lines accompanying a solar energy system can be attached. The <br />Zoning Administrator may grant exemptions to this requirement in instances where shallow bedrock <br />water courses, or other elements of the natural landscape interfere with the ability to bury lines. <br />31 Maintenance. Solar energy systems shall be kept in good repair and free from damaged <br />supports, mounts, framework, or other components. <br />41 Abandonment. A solar energy system that is allowed to remain in a nonfunctional or <br />inoperative state for a period of twelve (12) consecutive months, and which is not brought in <br />operation within the time specified by the City shall be presumed abandoned and may be declared a <br />public nuisance subject to removal at the expense of the operator. <br />51 Compliance. All solar energy systems shall be designed, constructed, and operated in <br />compliance with any applicable federal, state, and local laws, codes, standards, and ordinances, as <br />well as adhere to the requirements of local utilities if connected to utility lines, including, but not <br />limited to the State of Minnesota Building Code, Minnesota State Electric Code. and Minnesota State <br />Plumbing Code. <br />(6) Interference. Solar energy systems shall be designed to not cause electrical, radio frequency. <br />television, and other communication signal interference. <br />7) Installation. Solar energy systems shall require the issuance of a building permit. <br />81 The structure upon which the solar energy system is mounted shall have the structural <br />integrity to carry the weight of the solar energy system. Proof of structural integrity shall be submitted <br />to the satisfaction of the buildjng inspector. <br />�D- Administrative Review Process <br />
The URL can be used to link to this page
Your browser does not support the video tag.