Laserfiche WebLink
9 <br /> g) Calculate total site efficiency by proportioning the efficiency- of <br /> • C each area, and adding together. <br /> h) Calculate credit: <br /> Credit=site efficiency/2 x RGU value x current rate ! <br /> .4 . Exceptions and special cases . <br /> a) Off-site water drains to treatment area-- <br /> Ignore effects of off-site water in calculating pond efficiency. <br /> b) Parcel shares ponding facility. i <br /> If parcel has water normally ponded on site, calculate volume of <br /> pond on that site below outfall . Then calculate credit per normal. <br /> procedure. <br /> D. Other Credits <br /> Miere, in the opinion of the staff, the above procedures do not result in* an apps ' <br /> priate storm drainage charge, the Public Works Director has the authority to make <br /> adjustments consistent with the intent of the storm drainage utility. <br /> AUTI[OR ITY <br /> Drainage, C}iaoter 74, Storm Water Drainage Utility, adortcd 3anuary, 19S=t . <br /> . City Policy, Credits and/or aA4.—tmertts to r.unicinal 5*-ora <br /> r adopted January, 1984 . <br /> • I <br /> I <br />