My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10131987
StAnthony
>
City Council
>
City Council Packets
>
1987
>
CC PACKET 10131987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:25:06 PM
Creation date
12/30/2015 4:24:27 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 10131987
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Page 15 <br /> ..These are all in keeping -mith-the, estimated sources from the original set of <br /> ..numbers generated during-the alternative phase of the program. This utility <br /> has also allowed over $200,000 to: be removed from the tax levy. The difference <br /> ,between the utility fee and the-tax-levy reduction being the cost. needed to <br /> cover the planning expenses plus the new construction proportion of the overall <br /> program. The funds collected have been used as shown in the following table: <br /> USE OF UTILITY FUNDS <br /> USES $ <br /> Personnel (2 full time & 4 part time) 57,000 <br /> Equipment (8 vehicles) 42,000 <br /> Supplies 9,000 <br /> Master plan and WMO costs 105,000 <br /> Overhead 26,000 • <br /> Projects 280,000 <br /> Match Fed. Grant ' 200,000 <br /> Flood Correction 40,000 <br /> Future Project 40,000 <br /> .-It should be noted that once the master plans have been .prepared, that $60,000 <br /> to $70,000 of those expenses will no longer exist. <br />
The URL can be used to link to this page
Your browser does not support the video tag.