My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10131987
StAnthony
>
City Council
>
City Council Packets
>
1987
>
CC PACKET 10131987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:25:06 PM
Creation date
12/30/2015 4:24:27 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 10131987
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Anoka, Minnesota <br /> Ii <br /> SEH. .has, .been. involved in dr-ainage. : facility design in. .the City :of . <br /> Anoka since 1960. The facilities . -design have' been diverse in <br /> nature'. Drainage areas have included high density commercial and <br /> 1 residential areas. <br /> Bayport, Minnesota <br /> A comprehensive plan was prepared for.. the entire- city which <br /> included watershed boundaries, inventory of existing structures <br /> and proposed storm water management plan. <br /> East Mississippi Water Management Organization <br /> SEH has prepared a Watershed Management Plan for the East <br /> Mississippi Water Management Organization covering the Newport, <br /> St. Paul Park and Grey Cloud Island area. <br /> Newport, Minnesota <br /> In 1975, a Comprehensive Storm Drainage Plan was prepared for <br /> Newport. This plan provided a comprehensive drainage plan for <br /> future development. <br /> North St. Paul, Minnesota <br /> Since 1950, SEH has developed all of the - City' s drainage <br /> facilities.' <br /> i <br /> Shoreview, Minnesota <br /> SEH has prepared storm water drainage plans on a segmental basis <br /> for a number of sub-watershed areas. <br /> Stillwater, Minnesota <br /> In 1970, SEH prepared a preliminary engineering report -for the <br /> total separation of combined sewers in the city. The <br /> construction of storm sewers eliminated the intermittent <br /> discharges of combined sewer overflow into the St. Croix River. <br /> ( • Construction carried out in 1971 and 1972 included eight miles of <br /> storm drainage and related street restoration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.