My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06271989
StAnthony
>
City Council
>
City Council Packets
>
1989
>
CC PACKET 06271989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:38:01 PM
Creation date
12/30/2015 4:37:29 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 06271989
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. ENGINEERING SERVICES COST PROPOSAL <br /> • <br /> Ulteig Engineers,, Inc. (UEI) proposes to provide Engineering <br /> Services to prepare plans and specifications and provide <br /> construction administration and inspection for the <br /> maintenance of well number three in accordance with this <br /> proposal. <br /> UEI will invoice at hourly rates in accordance with the <br /> attached rate schedule on a monthly basis for services <br /> performed. on a not to exceed cost basis. <br /> C % <br /> UEI will not invoice above $5, 000. 00 under this contract. <br /> Should the project be increased in scope, the contract will <br /> be- adjusted accordingly as per the rate schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.