My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06271989
StAnthony
>
City Council
>
City Council Packets
>
1989
>
CC PACKET 06271989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:38:01 PM
Creation date
12/30/2015 4:37:29 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 06271989
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ <br /> alolvMaier CONSULTING ENGINEERS <br /> Stewart & Associates Inc. <br /> September 21 , 1989 <br /> File No: 900-020-00 <br /> Mr. Larry Hamer <br /> Director of Public Works <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. -Anthony, MN 55418 <br /> RE: PROPOSAL FOR ENGINEERING SERVICES FOR THE 05.E .ICN :AND, -CONSTRLIr1'TnN OF :,TELL <br /> HOUSE PUMP MOTORS AND ELECTRICAL CONTROLS <br /> Dear Mr. Hamer: <br /> Thank you so much for contacting us to submit a proposal for engineering <br /> services. Our understanding of the project scope consists of the evaluation <br /> of the existing pump curve to determine the proper sizing of the pump m()tor, <br /> evaluation of the existing control and electrical service needs at the pump <br /> house, preparation of plans and specifications, bidding and contract admini- <br /> stration, shop drawing review, necessary permitting and submittals to the <br /> federal government as the funding source and two size visits during <br /> construction. <br /> We would propose to use Mr. Paul F. Kaeding, P.E. , of Kaeding and Associates, <br /> for 'any electrical design considerations as part of this project and Mr. Tom <br /> Madigan, P.E. , as the project engineer. <br /> Based on the scope of work outlined above, we would propose to provide <br /> engineering services not-to-exceed $3,975.00. <br /> We would estimate that the total construction cost for this work would be <br /> $43,000. This would include a new pump motor adapted to fit the existing pump, <br /> new raotor' 5tar-Lers, wifliiy of pul,lp1, eie(;Lr .IL'til serr'iCe revi5'ions, c on.sUiiU—J& on <br /> of controls and a manual transfer switch with generator receptacle. <br /> Sincerely, <br /> MAIER STEWART AND ASSOCIATES, INC. <br /> Thomas J. Madigan, P. E. <br /> Project Engineer <br /> • TJM/km <br /> cc: Paul F. Kaeding <br /> 1959 SLOAN PLACE, ST. PAUL, MINNESOTA 55117 612-774-6021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.