My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06271989
StAnthony
>
City Council
>
City Council Packets
>
1989
>
CC PACKET 06271989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:38:01 PM
Creation date
12/30/2015 4:37:29 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 06271989
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br /> to be able to combine the excavation of contaminated soil , if <br /> necessary , with excavation for construction purposes , <br /> although META has no identified use for the property at this <br /> time. He speculated that excavation of contaminated soil , if <br /> required, could not be done in the wintertime but would have <br /> to wait until spring 1990 . Mayor Sundland expressed the hope <br /> that Mr . Tyson ' s client would be able to make good use of the <br /> property in the future once the contamination problem was <br /> solved . <br /> Mr. Tyson next presented cost information regarding various <br /> parking lot surfaces which was requested by the Planning <br /> Commission. He informed the Council META had received bids <br /> for grading and gravel surfacing of $5 , 400 and $7 , 300; <br /> grading and asphalt surfacing, $13 , 200 ; and asphalt surface <br /> only, $11 , 000 . He noted that landscaping with timbers , which <br /> could be included with either a gravel or an asphalt surface , <br /> would cost $3, 600 . <br /> Mr. Tyson expressed the view that the hardship to his client <br /> is not primarily economic, but that META is more concerned <br /> with the fact that they own a contaminated piece of property <br /> • and that the contamination must be dealt with before <br /> permanent use can be made of that property. He stated that <br /> META recognizes Kenzington' s- need for more parking but does <br /> not feel that it would be responsible at this time to install <br /> • concrete or asphalt parking lot which would be perceived as <br /> • permanent parking facility. <br /> Council Member Marks asked Mr. Tyson whether 'his client would <br /> be willing to pave the parking -lot with concrete or asphalt <br /> at the end of . the three-month time period . Mr . Tyson <br /> responded that he did not know at this t.i.me 'what his client ' s <br /> reaction would be and that he did not have the authority to <br /> commit them to a course of action. <br /> Council Member Makowske asked Mr. Tyson whether there was a <br /> difference between the parking requirements of unit owners <br /> and renters at Kenzington , and whether the parking problem <br /> would be alleviated once purchasers of units outnumbered <br /> renters of units . Mr. Tyson responded that alleviation of <br /> the parking problem would be a logical outcome of mi.nimizin(j <br /> the number of renters in favor of purchasers, and that META <br /> originally foresaw the building being occupied by purchasers <br /> rather than renters and planned parking the accommodations <br /> accordingly. <br /> Council Member Marks commented that the timing of <br /> Kenzington' s opening unfortunately coincided with a soft <br /> condominium market. Council Member Ranallo pointed out, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.