My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04252000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 04252000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:13:37 PM
Creation date
12/30/2015 4:13:04 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 04252000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/17/00 15:19 $952 912 2601 SEH.RCM ASSOC <br /> pNQ F"ao IPA <br /> • <br /> t,re rc a <br /> MSA Eligible City Sanitary Sewer)r and City Storm Sewer Fund , <br /> Item <br /> Total Revised As-Bid Total Revised As-Bid Total Revised As-BId <br /> Tots] Total Total Total Total Total <br /> Co13St1UGd0n Cost 375,,@69 548.153 394-W <br /> Street Repair& <br /> Concrete Planing <br /> Construction Cost }6;899 16,380 21.854 <br /> Revise S ignal <br /> System <br /> Construction Cost 45.099 43330 48.655 <br /> Sidewalk Retaining <br /> Wall/Restoration <br /> Construction Cost r,5e9 E9.54i 58.540 <br /> Sanitary Sewer <br /> Edward Street <br /> Construction Cost -6';888 69,4E3 52,502 <br /> Sanitary Sewer <br /> Construction Cost H.55e 21,611 2.0,137 }>;2gg },Kjg . 16.0s <br /> Storm Sewer <br /> Improvements. <br /> Construction Cost 5-.5ee 5;55e 8.140 +.4M 2.09n s?5 7711 <br /> Traffic Control <br /> Subtotal SOIFFAM 543.4 4 $493,330 671;508 $188,44 $113,132 $H;-d56 $17;755 $17,245 <br /> Construction <br /> Costs: <br /> Contingencies 56;590 3$-399- 0 $ 6 9:8;} 0s9+4 t'_+k9 0 - <br /> Engineering& 75,16 5 81,074 !frW 18.592 X699 +,W 2,834 <br /> Administration <br /> Total $58514sa 5$39,89 $574,404 1 $33;,4#6 $*B+,4a% $131,724 6i4;am I $20,079--1 <br /> Currently the City has $266,711 in the MSA account with$230,775 added in the year 2000 for a <br /> total available funds..of$497;486,. <br /> The City of St.Anthony has committed$236,000 from the MSA account for the Silver Lake Road <br /> bridge and$40,000 from the MSA account for the signal work at 370'and Highcrest for a total 6' t.' <br /> ($236,000+$40,000) $276,000. <br /> • <br /> The 33'Avenue lmprovementprojecthas 15e$639;269$574,404MSAeligiblecosts: <br /> • The MSA funds available in the construction year 2000 is.$497,486: <br /> • MSA funds not committed in the year 2000 is($497,486-$276,000.already committed)is.. <br /> $221,486 for MSk construction reimbursement:: <br /> 33"Avenue Improvements Silver Lake Road to Stinson Boulevard A-SANTH99g2.Q0 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.