My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08222000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 08222000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:17:27 PM
Creation date
12/30/2015 4:16:32 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 08222000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL 711-00 TUE 13:32 HILLOREST DEVELOPMENT FAX N0, 3782424 P. 01' <br /> 153 <br /> SENSHOOI" & ASSOCIATES, INC. <br /> TRANSPORTATION ENGINEERS AND PLANNERS <br /> 10417 EXCELSIOR BOULEVARD,SUMS TWO/HOPIQNS,MN 55343/(952)238-1667/FAX(852)238-1871 <br /> July.7,2000 Refer to File: 00=48 <br /> MEMORANDUM F L r <br /> . �L LLB <br /> TO: Hoff Heiberg,Hilkrest Development <br /> FROM: James A Bens of and Paul D. Klappa <br /> RE: Traffic Review for Proposed Redevelopment of Apache Plaza in City of <br /> Saint Anthony <br /> PURPOSE AND BACKGROUND <br /> This memorandum is to address the trip generation implications of the proposed <br /> • redevelopment of Apache Plaza in the.City of Saint Anthony. The site is located in the <br /> northwest quadrant of the intersection of Silver Lake Road with 370'Avenue. Apache <br /> Lane circumferences most of the site. Apache Plaza was once a thriving sub-regional <br /> shopping center. However,the care of the shopping center has suffered severe decline <br /> and is predominantly vacant. Portions of the site have been split off for other . <br /> developments. It is the intent of the developer to remodel or replace the remaining core <br /> with high tech office space. Based on conversations with the developer, our work is to <br /> address traffic questions of the City regarding the change in usage from retail to office. <br /> The scope of our work is to compare the traffic generated by the site following the <br /> redevelopment into high tech office space with the traffic that was generated by the site <br /> when the shopping center was in prime operating condition: <br /> On Monday June 19, 2000, we visited the Apache Plaza site to inventory the existing <br /> developments. We also made observations of the traffic facilities within the site and on <br /> the surrounding roadway system. . <br /> Original Site Characteristics <br /> Based on information provided by the developer, our site visit, and other research,the <br /> original development consisted of the following: <br /> Shopping center of 450,000 square feet of gross floor.area plus a 100,000 <br /> square foot finished basement. Of the 450,000 gross square feet, 80%or <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.