Laserfiche WebLink
JUL-11-00 TUE 13:35 HILLCREST DEVELOPMENT FAX N0, 3782424 P108 <br /> 157 <br /> Mr. Hoff Heiberg -5- July 7,2000 <br /> CONCLUSIONS <br /> Based on the information previously presented in this memorandum, we have established <br /> the following conclusions: <br /> The traffic system serving the Apache Plaza Site was designed to <br /> accommodate substantial traffic volumes,with several high capacity access <br /> points serving the site both to/from Silver Lake Road and Stinson Boulevard- <br /> • .The net daily trips ends generated by the proposed redevelopment will be 13% <br /> lower than the net daily trip ends generated by the original development <br /> (11,510 as compared to 13,242) <br /> • The net p.m. peak hour trip ends generated by the proposed redevelopment <br /> wi71 be only 3%higher than the net p.m. peak hour trip ends generated by the <br /> original development(1,324 as compared to 1,290) <br /> Given the preceding findings, we are confident that the traffic impacts caused by <br /> the proposed redevelopment will not be any greater than experienced under the <br /> original development. <br />