Laserfiche WebLink
06/15/00 15:49 FAX 6512233002 SPRINGSTED INC. (� <br /> . 35 <br /> Conclusion <br /> As an outside consultant I have analyzed the condition of the subject buildings and the evidence <br /> is reasonable and the evaluations are based on the estimated cost of code(building)compliance <br /> for the structural,mechanical,electrical,heating HVAC,life safety,egrets,occupancy loads, <br /> Americans with Disabilities Act,and energy conservati on requirements needed for compliance. <br /> The subject property located in the City of St.Anthony,Mn. is an area of troubled buildings <br /> requiring substantial renovation or clearance and may exhibit deficiencies in other categories <br /> such as utilities, facilities, light,ventilation,fire protection,(or lack thereof)egress, interior <br /> partitions and unknown factors(there exists PCB containing transformers in this building)such <br /> as asbestos abatement,pollution,lead based paint,and the need for thermal energy conservation <br /> to comply with the building code. <br /> Findings <br /> Therefore the cost to modify the existing buildings,determined by the aforementioned statutory <br /> formula,exceeds the 15%cost of constructing a new building on the same site and with <br /> reasonable certainty qualifies the subject properties according to Minnesota Statutes <br /> Section 469.174 Subd 10.(a)as described above and concludes the finding that more than 50% <br /> (2 out of 2 buildings or 100%) of the parcels with buildings are structurally substandard . <br /> Reconnaissance was conducted in May and June of 2000 and did include an informal interior <br /> view of those buildings open to the public. The City of St Anthony sent letters to all owners <br /> • requesting an interior evaluation of their ownership. As you are aware the City of St Anthony <br /> must create a District pursuant to'a determination ou the"But for"question and"Public <br /> Purpose"requirements inherent in all Redevelopment Districts. There are two different <br /> approaches to utilize TIF funds to finance future public redevelopment costs that impact this site. <br /> The statutory constraints and short term of the existing district may undermine project feasibility <br /> and inhibit redevelopment. The alternative method is to decertify the parcels from the existing <br /> district and establish a new TIF district to finance new project costs and that is the perspective in <br /> which I have analyzed this project assignment Sirice the shopping center has been <br /> predominantly vacant for many years it is reasonable to assume that the consent for TIF approval <br /> could be obtained from the City of St. Anthony. <br /> Calculations <br /> A typical (example)calculation of a commercial building would contain 1000 square feet times <br /> $45 dollars per square foot for replacement cost(Marshall Swift Replacement Cost not including <br /> land value)equals$45,000.times 15%equals approximately$6750 and the cost of necessary <br /> renovation was estimated at$15,000 to 20,000 thousand dollars,thereby exceeding the threshold <br /> ($6750)of the statutory formula and qualifying the subject properties structurally substandard in <br /> accordance with Laws of Minnesota 469.174 Subdivision 10 Clause 2 a. (an example of a <br /> commercial/retail type building calculation) <br /> This concludes my analysis-Call me if 1 can be of further assistance to your redevelopment needs <br /> at(612)724-4843 or 888-6450 <br /> cc Nick Scarich, Springsted Corp. <br />