My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08222000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 08222000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:17:27 PM
Creation date
12/30/2015 4:16:32 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 08222000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
78 : <br /> VILLAGEPROP. R f' 2500-39th Avenue NE #230 <br /> Minneapolis, MN 55421 <br /> September 12, 1996 <br /> Larry Hamer <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. -Anthony, MN 55418 <br /> Dear Larry, <br /> As you . know, our Company leases land from CP Rail to <br /> provide parking for -the Industrial Custom Products (ICP) <br /> • Building at 2801 37th:-Avenue'-North East. 'Our lease with CP Rail <br /> continues to October, 2002' .and 'we- have requested CP_ Rail to <br /> extend the lease to the maximin. possible term per the attached <br /> letter. <br /> It is very unlikely that Cp Rail will ever terminate this <br /> lease, however, in that. event we :would not be able to meet the <br /> City's parking-requirements on the existing remaining paved <br /> surface, and would need to.-provide overflow parking'on the <br /> undeveloped land to the -east-:and w±est .of the paved areas. The <br /> need to reserve this land 'for:'parking •in the scenario severely <br /> limits our ability to develops the parcels. <br /> The parking ordinance requires approximately 190 spaces <br /> for the facility. The a�tached -drawings 'indicate that we can <br /> provide approximately 103 spaces .without the rail land. We <br /> have reviewed the current usage of the building and find that <br /> the use is 50 percent for warehouse and 50 percent for office <br /> and manufacturing. Using- this 'information, we believe that our <br /> • obligation is to provide one parking space for each employee or <br /> one space for each 350 square feet of actual manufacturing <br />
The URL can be used to link to this page
Your browser does not support the video tag.