My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09251984
StAnthony
>
City Council
>
City Council Packets
>
1984
>
CC PACKET 09251984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:59:52 PM
Creation date
12/30/2015 3:59:16 PM
Metadata
Fields
SP Box #
16
SP Folder Name
CC PACKETS 1981-1984 & 1987
SP Name
CC PACKET 09251984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Approximately what percent of the site is in each of the Identify water body and applicable state classification(s): <br /> following categories? (Percentages should total 1008 <br /> before and after construction.) <br /> Before After I ' <br /> Forest/Wooded OS 08 19. Describe any physical alteration (e.g. dikes, excavation, <br /> fill, stream diversion) of any drainage system, lake, <br /> Brush 08 0% stream, and/or wetland. Estimate quantity of material to <br /> Grassland 09 08 be dredged and indicate where spoils will be deposited. <br /> Cropland 08 08 <br /> Urban vacant 1008 368 None. <br /> Wetland (types 3-8) 09 09 <br /> Impervious Surface 08 30% 20. Will the project-require an appropriation of ground or <br /> Other (Building) 08 348 surface water? X No Yes <br /> 15. Show the type and location of soils on the site map. Give Explain (indicate quantity and source): <br /> the SCS soil classification types, if known. <br /> J <br /> The Ramsey County Soil Survey classification is 860c, Urban j <br /> Land-Hayden-Kingsley complex, 38 to 158 slopes. Nearby <br /> well logs indicate clay and sand and gravel surface, with 21. Will the project affect: <br /> area characterized by clay to 12 feet. <br /> a. Surface water quality (on or off the site)? <br /> 16. Does the site contain peat soils, steep slopes, sinkholes, <br /> shallow limestone formations, abandoned wells, or any X No Yes <br /> geologic hazard? X No Yes <br /> Explain: b. Groundwater quality (on or off the site)? <br /> X No Yes <br /> C. Groundwater levels in any wells (on or off the site)? <br /> 17. What is the approximate depth (in feet) to: y <br /> X No Yes <br /> a. groundwater: 130' min. 140' avg. static water level : <br /> in well pump data Explain both during and after construction including any <br /> discharges expected. <br /> b. bedrock: 120' min. 130' avg., Plattville limestone <br /> j The paved truck parking and unloading area will have storm <br /> 18. Does any part of the project area involve: water drainage facilities which connect to the municipal' <br /> storm water drainage system. The on-site system will <br /> a. Shoreland zoning district? include gates and traps to enable the diversion of surface <br /> liquids into internal sumps and control equipment if a <br /> X No Yes spill occurs. <br /> b. Delineated 100-year flood plain? 22. What type of waste water treatment will be used? <br /> X No Yes X municipal individual (on-site) other <br /> C. State or federally designated river land use The facility will discharge approximately 80,000 gallons of <br /> district? waste water per day into the municipal metropolitan sewage <br /> disposal system. Waste water will be pretreated at the <br /> X No Yes facility to ensure compliance with applicable industrial <br /> wastewater effluent requirements. <br /> 6. 7. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.