My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09251984
StAnthony
>
City Council
>
City Council Packets
>
1984
>
CC PACKET 09251984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:59:52 PM
Creation date
12/30/2015 3:59:16 PM
Metadata
Fields
SP Box #
16
SP Folder Name
CC PACKETS 1981-1984 & 1987
SP Name
CC PACKET 09251984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The facility will be operated as a Minnesota corporation. <br /> The 28 participating metal waste generators own stock and <br /> will have rights regarding the facility' s operation. <br /> The facility will consist of a 60,000 square foot building <br /> which will house processing equipment including separators, <br /> vats , and tanks to extract metals from the waste received <br /> from metal finishers. Specially designed trucks, semis and <br /> tank trucks, will transport waste material from the metal <br /> finishers to the facility. <br /> Metals will be recovered at the facility from inorganic <br /> solutions, sludges, and ion exchange canisters picked up at <br /> metal finishing plants. Bulk shipments of relatively <br /> concentrated solutions will be processed to extract metals <br /> and metal precipitates. Certain metals sludges will be <br /> accepted for further dewatering and processing. <br /> Processes to be used at the facility to remove metals from <br /> the incoming waste feed stock will include ion exchange, <br /> activated carbon adsorption, chromium reduction, electro- <br /> chemical recovery, metal precipitation, acid and base <br /> neutralization, filtration, and sludge thickening <br /> processes. Cyanide removal will be accomplished with a <br /> cyanide oxidation process. After metals removal , waste- <br /> water from these processes will be treated further by <br /> clarification and neutralization, and multimedia or sand <br /> filtration. (Refer to Attachment 6 for a detailed process <br /> description. ) Precipitated metal hydroxides will be <br /> • dewatered and processed for recovery and resale. <br /> It is expected that 10% to 25% , by dry metal weight, of the <br /> incoming metal waste will be recovered for reuse. <br /> Nonhazardous waste, primarily zinc, will constitute <br /> approximately 30%, by dry metal weight, of the incoming <br /> processed wastes. Approximately 75% of the total incoming <br /> wastes will not initially be amenable to recovery. These <br /> will be processed into inert solid residuals, mixed metal , <br /> dewatered sludges, or neutralized. Solid inert substances <br /> generated, if nonhazardous , will be disposed of at sanitary <br /> landfills in Minnesota. Mixed metal sludges and organic <br /> materials will be disposed of at approved out-of-state <br /> hazardous waste facilities, or at approved solvent and oil <br /> recovery facilities. <br /> 6 . Reason for EAW preparation: Mandatory Category MEQB Rule <br /> #: 6 MCAR § 3. 038. 0. 2 requires MPCA to prepare an EAW for <br /> construction of a hazardous waste processing facility which <br /> sells processing services to generators other than the <br /> owner and operator of the facility, of 1, 000 or more <br /> kilograms per month capacity. <br /> 7. Estimated construction cost: $5, 000 , 000 <br /> i <br /> 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.