Laserfiche WebLink
12. Is the proposed project inconsistent with any: <br /> a. Adopted land use ordinances? <br /> • X No Yes <br /> The project is located in a General Industrial <br /> District (I-2) in the City of Roseville. A zoning <br /> amendment and special use permit authorizing this <br /> specific type of industrial use are necessary. <br /> b. Adopted comprehensive land use plans? <br /> X No Yes <br /> C. Local , state, or federal resource management plans? <br /> X No Yes <br /> If yes, explain: <br /> 13. Describe current and recent past land use and development <br /> on and near the site. <br /> The site has never been developed. It is the only <br /> undeveloped parcel in this area. Neighboring industrial <br /> activities include: solvent storage and sales, ware- <br /> housing, forest products manufacturing, petroleum tank <br /> farm, and food processing , all in the I-2 zoned district. <br /> 14. Approximately what percent of the site is in each of the <br /> following categories? (Percentages should total 100% <br /> before and after construction. ) <br /> Before After <br /> Forest/Wooded 0% 0% <br /> Brush 0% 0% <br /> Grassland 0% 0% <br /> Cropland 0% 0% <br /> Urban vacant 100% 36% <br /> Wetland ( types 3-8 ) 0% 0% <br /> Impervious Surface 0% 30% <br /> Other (Building) 0% 34% <br /> 15. Show the type and location of soils on the site map. Give <br /> the SCS soil classification types, if known. <br /> The Ramsey County Soil Survey classification is 860c , Urban <br /> Land-Hayden-Kingsley complex, 3% to 15% slopes. Nearby <br /> well logs indicate clay and sand and gravel surface, with <br /> area characterized by clay to 12 ,feet. <br /> 5. <br />