Laserfiche WebLink
City of St. Anthony <br /> Page 4 <br /> December 24, 1986 <br /> • <br /> Personnel <br /> RCM has a multitude of engineers and technicians available to work on this <br /> project. We would propose to utilize the project management concept, <br /> where the project manager is responsible to both the City of St. Anthony <br /> and RCM to produce a socially acceptable, cost effective, technically <br /> sound plan which meets your needs and our .standards of engineering <br /> excellence. The writer will serve as the project manager on this job and <br /> will also perform the majority of the evaluations. The project manager <br /> reports to a project principal-in-charge to communicate the project's <br /> status as well as whether, your needs are being met. You are also <br /> encouraged to feel free to contact the principal-in-charge to discuss the <br /> project. RCM's principal-in-charge on this project will be Robert F. <br /> Roskopf, President/CEO. <br /> A .third person anticipated to serve on this project is Mr. Francis Osborn, <br /> our operations specialist, who has been involved in countless wastewater <br /> monitoring projects over the- pas fifteen years. <br /> Cost <br /> We proposed,to perform the sewage lift station study outlined above for a <br /> lump sum fee of $4,500 if flow measurement is not required and $6,000 if <br /> temporary flow recorders must be installed. <br /> Thank you again for this opportunity to submit this proposal. We would • <br /> very much like to serve the City of St. Anthony in this capacity, and look <br /> forward to discussing this proposal in person at your convenience. <br /> Respectfully submitted, <br /> RIEKE CARROLL MULLER ASSOCIATES, INC. <br /> L. E. Anderson, P.E. <br /> Robert F. Roskopf, President CE <br /> LEA:mt <br /> Accepted this day of , 19 <br /> By: <br /> Title <br />