My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01271987
StAnthony
>
City Council
>
City Council Packets
>
1987
>
CC PACKET 01271987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:02:29 PM
Creation date
12/30/2015 4:02:08 PM
Metadata
Fields
SP Box #
16
SP Folder Name
CC PACKETS 1981-1984 & 1987
SP Name
CC PACKET 01271987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ai n th®n <br /> ilia e <br /> DATE : A P P ROVA L; <br /> January 21, 1987 (� <br /> T O : David M. Childs, City Manager <br /> F ROM <br /> Larry Hamer, Public Works Director <br /> I T EM : ELECTRICAL QUOTATIONS FOR WELL #4 <br /> STAFF RECOMMENDATION: Recommend Dickson Electric be awarded the contract to re-wire , <br /> Well #4, including component parts, for $4,005.00. I will <br /> instruct Dickson Electric to seek approval to retain the existing <br /> service into the building. If_ thi_s is accomplished, the contract <br /> would be for $2,745.00. <br /> COUNCIL ACTION: By motion, move to award contract for electrical work to be done on <br /> Well #4 to Dickson Electric a's recommended by staff. <br /> BACKGROUND: The state electrical inspector inspected the present electrical box and <br /> service to determine if the well can handle an increase of power. He <br /> said that most of the electrical controls would be alright to use for- the <br /> 480 system, with some modifications. Because we do not need a new service <br /> box, the City will realize a savings of about $7,000, which cost would have <br /> been over and above the $4,000+ quote. <br /> Two quotations were received for the electrical work needed - one from <br /> Anderson Electric, Inc. for $4,480.00 and one from Dickson Electric <br /> for $4,005.00. <br /> Costs were higher due to quotes for underground service. The necessity <br /> for underground service is questionable. If we do not have to install <br /> that service, the City will realize a $1,260:00 savings. <br /> c-i k:1.27.87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.