My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01121988
StAnthony
>
City Council
>
City Council Packets
>
1988
>
CC PACKET 01121988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:26:55 PM
Creation date
12/30/2015 4:26:37 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 01121988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P �e <br /> 1 *the external wail as well as heating, cooling and ventilation <br /> 2 systems are all installed; <br /> 3 *the frame for the rear doors is in but the new doors have not <br /> 4 been installed because some of the interior fixtures have to be <br /> 5 brought in first ; <br /> 6 *the ceilings and bar joists have all been painted but the sheet- <br /> 7 rock walls have to be taped and painted after the lighting <br /> 8 fixtures have been installed; <br /> 9 <br /> 10 *the floor tile will then be laid; <br /> 11 *most of the work remaining to be done is waiting for the new <br /> 12 door which has been ordered and is included on the December 6th <br /> 13 Change Order to be considered later in the agenda. <br /> 14 In relation to whether or not the City'snegotiatinq position would be <br /> 15 improved by withholding payment on the contract, Mr. Childs indicated <br /> 16 the payment due that evening only covered work the contractor had <br /> 17 completed by December 4th and the work remaining to be done would be <br /> 18 much less than the $67 , 567 still due on the contract. He indicated he <br /> 19 perceived that fact made the possibility of the contractor walking <br /> 20 away from the job very remote and the City Manager pointed out that <br /> 21 the bond would provide further protection from that ever happening. <br /> 22 Mr . Childs reiterated that , althouqh the City' s expectations had been • <br /> 23 raised by the contractor ' s promise to get the work completed in <br /> 24 October , as a practical matter , Fullerton had only been legally <br /> 25 required to be done by December 1st , which would have been too late <br /> 26 for the City to make the transfer and to open before the holiday sales <br /> :?7 period. ' Councilmember Ranailo agreed that , since the warehouse was <br /> 28 not operating in 'the new space by December 1st, there was little <br /> 29 chance of the City collecting loss of business damages before January <br /> 30 1st because it would have taken at least 30 days for the City to get, <br /> 31 the store operational. However, he said he now perceived the City <br /> 32 should have every right to make the contractors pay the rent which <br /> 33 would be due from January 1st on at the present location. The <br /> 34 general consensus was that the Council would deny any further exten- <br /> 35 sions of the contract when the Change Order was brought up •again later <br /> 36 in the agenda. <br /> 37 Council Action <br /> 38 Motion by Marks , seconded by Ranallo to approve payment of the <br /> 39 following claims as listed in the December 22nd Council agenda packet: <br /> 40 *all November 30th City accounts payable and November 30th and <br /> 41 December 15th Liquor accounts payable; <br /> 42 *$61, 078 . 00 to the Fullerton Lumber Company for construction <br /> 43 services on the Stonehouse liquor warehouse addition; • <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.