Laserfiche WebLink
CONSTRUCTION REQUIREMENTS • <br /> During construction the Contractor will be required to provide access to the cemetery <br /> and golf course from one direction only. This will allow the Contractor to work on <br /> approximately half of the job without interruption until the time of making the <br /> connection at the accesses to the cemetery and golf course. Further, it will be specified <br /> that the Contractor shall not excavate and leave open an unfilled excavation and shall <br /> provide positive drainage to storm sewers at the low points of the project at all times. <br /> Contractors will be required to construct the new pavement section on a stable subgrade. <br /> This may require a special preparation of the subgrade to carry construction traffic as <br /> indicated in the soils report appended to this study. <br /> • <br /> -7- <br />