My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04261988
StAnthony
>
City Council
>
City Council Packets
>
1988
>
CC PACKET 04261988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:29:22 PM
Creation date
12/30/2015 4:29:03 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 04261988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
contamination problem. EPA and State Superfund dollars were <br /> allocated through an official Record of Decision to design and <br /> construct such a system; and <br /> WHEREAS, the initial timetable for completion of the $1. 1 million <br /> permanent GAC system was the summer of 1987; and <br /> WHEREAS, numerous delays at EPA and MPCA have resulted in the <br /> scheduled completion date being delayed until mid-August, 1989 , <br /> at approximately double the original estimated cost. The City <br /> also has serious doubts that the EPA/MPCA will actually meet <br /> this much-delayed completion date; and <br /> WHEREAS, in the City' s efforts to find alternative solutions to <br /> this problem, its has taken several actions:. <br /> *commenced litigation in early. 1986 naming as defendants <br /> the U. S. Army and other responsible parties. <br /> *retained experts to determine the- exact source of the <br /> City' s water contamination problem. These experts have <br /> concluded that the major source of contamination is <br /> emanating from TCAAP. <br /> *presented these conclusions to the U.S. Army and the- Army <br /> has refused to accept any responsibility for St. Anthony' s <br /> water contamination problem. <br /> WHEREAS, the City of New Brighton, in response to the same <br /> contamination has ordered temporary carbon filtration for its <br /> wells and will be installing a permanent GAC system also to be <br /> completed late in 1989 ; and <br /> WHEREAS, on March -2 , 1988 , the MDH advised the City that TCE <br /> levels in Well #4 .had risen to concentrations ranging up to 15 <br /> ppb and Well #5 to concentrations ranging up to 6.6 ppb. They <br /> further advised that the recommended allowable limit (RAL) of <br /> TCE which was previously 27 ppb had been replaced by a federal <br /> Maximum Contaminant Level (MCL) for TCE of 5 ppb, which was <br /> adopted in a July 8 , . 1987 Federal Register and which standard <br /> would be effective� in Minnesota on January 9, 1989. They also <br /> advised that if the" level of TCE exceeded 5 ppb based on the <br /> average of 4 consecutive quarterly results, the City would be in <br /> violation of the. MCL and under legal obligation to remedy the <br /> situation; and <br /> WHEREAS, with the City possibly being in violation of Federal MCL <br /> Standards effective January 9 , 1989 , and with the permanent <br /> plant scheduled for completion no earlier than mid-August of <br /> 1989 , it is imperative for the City to take reasonable and <br /> prudent actions to protect the safety and welfare of its citizens <br /> and to attempt to make reasonable efforts to comply with <br /> applicable Federal laws. In light of previous major delays in <br /> the design and construction of the permanent Granular Activated <br />
The URL can be used to link to this page
Your browser does not support the video tag.