Laserfiche WebLink
atho u ie <br /> D ATE - APPROVAL � -' <br /> r <br /> June 22 1988 <br /> FROM : Larry Hamer, Public Works Director <br /> I TEM : QUOTES TO REPLACE FIRE STATION/BARBER SHOP ROOF <br /> Two quotations were received to replace the roof at the fire station. <br /> One quotation was submitted by S.A. I . Construction and the other <br /> from Milton Johnson Roofing. <br /> S.A.I . quoted two methods of reroofing the station: <br /> (a) flood coat system with a ten year guarantee, all labor and <br /> materials for .$14,045 . 00; <br /> (b) a rubber roof system with a 15 year manufacturer' s warranty <br /> for $14,795.00. <br /> This company also included a charge of $3 ,100. 00 to raise the <br /> parapet to accept the insulation. <br /> Milton Johnson Roofing bid a complete new roof and insulation with <br /> all materials and labor, including a 20 year warranty, for $11,400.00 . <br /> They bid one roofing method - flooded tar roof system. <br /> Both systems are acceptable. <br /> I recommend the Council award the bid to Milton Johnson Roofing <br /> to reroof the fire station and barber shop for $11,400.00. <br /> :cjk6.22 . 88 <br />