Laserfiche WebLink
.d <br /> CENTRAL PARK <br /> CURRENT: Central Park contains 1950 equipment which was not built <br /> for present day safety standards. It is important, in order <br /> to protect the city from a law suit, that the equipment be <br /> removed and replaced with better protected equipment. <br /> EQUIPMENT: As of 0.8 July, 1988: 3 animal swings, 1 regular swing, <br /> 1 infant swing, 1 tower/slide, and 1 merry-go-round <br /> which does not have a governor. <br /> PROPOSAL: 1 . Removal of existing equipment, replaced with proposed <br /> structure by Robert Klein of miracle equipment. <br /> 2. The current "sand box" would be dug deeper and filled with <br /> "Rice'. pea gravel, 2 diggers and 2 riding animals. <br /> 3. Basketball backboard would be striped and painted <br /> and a steel net would be added. <br /> FUTURE: The existing blacktop next to the basketball net would be <br /> taken out and replaced with pee gravel. Along with that, <br /> the swing structure which was taken out would be re- <br /> installed and up-graded with new chains and seats. <br /> FOLLOW UP: Park(s) would be checked at least 4 times during summer <br /> months and no less than 4 times during winter months to <br /> insure safety standards are met. _These checks would remain <br /> on file at City Hall. <br />