Laserfiche WebLink
. ain 'hoe, <br /> illa e <br /> DATE : A P PR OVA <br /> July 21 , 1988 f <br /> TO : <br /> Mayor and Councilmembers <br /> ]FROM <br /> Larry Hamer, Public Works Director <br /> I TEM : BUILDING FOR TEMPORARY CARBON FILTER PLANT <br /> The City advertised for bid for a 40' X 43' temporary building to <br /> shelter the temporary carbon filtration plant. The building to be <br /> constructed will be capable of being dismantled and moved to some other <br /> location when the use is completed at the temporary plant. <br /> We received two bids - one from R. A. Nadeau Company for $14 ,500 with <br /> an option bid of $1 , 267.00 for 26 gauge metal walls rather than 29 <br /> gauge. This structure meets the specifications. We also received a <br /> bid from Steel Structures, Inc. of $33 , 300.00. This structure can be <br /> used temporarily, but is more of a permanent structure. The structure <br /> exceeded the specifications. When the specifications were prepared, <br /> RCM engineers checked on probable costs and got prices ranging from $15- <br /> $25,000 from various suppliers. This project was advertised in the <br /> St. Anthony Bulletin and Construction Bulletin. <br /> RCM engineers confirm-that Nadeau is a reputable contractor. The Nadeau <br /> structure is a pole structure-type and the other -is more of a steel <br /> structure type (that is the reason for the difference in bid amounts) . <br /> I recommend that we accept the bid from R. A. Nadeau Company for <br /> $14 , 500.00. I also recommend we accept the option of the heavy gauge <br /> metal for the siding for $1 ,267.00. The building can be used in the <br /> future for the Public Works, or Fire and Police Departments. <br /> :cjk7.26.88 <br />