My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 07261988
StAnthony
>
City Council
>
City Council Packets
>
1988
>
CC PACKET 07261988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:31:21 PM
Creation date
12/30/2015 4:31:04 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 07261988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br /> STEEL STRUCTURES, INC. <br /> 821 NINTH AVENUE SOUTHEAST <br /> MINNEAPOLIS, MINNESOTA 55414 <br /> (612) 623-1000 <br /> TOβ City of St. Anthony DATE July 20, 1988 <br /> 3301 Silver Lake Rd. <br /> St. Anthony, MN 55418 STRUCTURE β Insulated Metal Building <br /> ATTN: Mr. Larry Hamer ARCHITECT β R.C.M. <br /> Director of Publ.ic Works LOCATION St. Anthony, MN <br /> We propose to furnish materials and/or labor described below, as required for the above <br /> structure, in accordance with conditions of the A.I.S.C. and the A.I.S.I. Codes of Standard Practice <br /> where applicable, and with the terms stated below, and on the back of this sheet. <br /> Varco-Pruden Pre-Engineered All Steel Building. This building will be all <br /> bolted and metal screw connections for ease in reconstructing in the future. <br /> We propose a 1 in 12 roof slope for more pleasant appearance. We include <br /> the overhead door and pedestrian door. We would install the building on <br /> drilled Caisson footings. This building exceeds your specification in several <br /> areas but will provide you with a quality building at the new location in <br /> the future for whatever use is to be made of -it. Doors or windows can be added ' <br /> easily. <br /> TOTAL PRICE. ... .. . . . . . . <br /> $33,300.00 <br /> Prices are F.O.B. Increase or decrease in freight <br /> rates from manufacturer's shipping point to destination, occurring between date of quotation and date of shipment, shall <br /> increase or decrease above prices to the extent of such Increase or decrease. Above prices subject to change without <br /> notice after 30 days from date of proposal. <br /> Delivery (after receipt of material lists or approved plans): <br /> Terms: <br /> Yours very truly, <br /> STEEL STRU C. <br /> By ..- , <br /> Upon acceptance of this proposal by signature of both parties, this p opost becOo. aderi ContPreS. <br /> Dated Dated <br /> For For STEEL STRUCTURES, INC. <br /> By By <br />
The URL can be used to link to this page
Your browser does not support the video tag.