Laserfiche WebLink
ST ANTHONY ASSESSMENT <br /> RCM NO. 861019-01 <br /> • TOTAL SECTION A COST <br /> -----------=--------------------------------------------------- <br /> UNIT PROJECT PROJECT <br /> ITEM DESCRIPT UNIT PRICE TOTAL COST <br /> --------------------------------------------------------------- <br /> Mobilization LS $9,525. 00 1 $9.525.00 <br /> Field Office EA $2, 175.00 1 $2, 175. 00 <br /> Rmv Conc Curb LF $1 . 10 5443 $5,987. 30 <br /> Rmv B624 C & G LF $1 . 10 31 $34. 10 <br /> Rmv 8" Strm Sew LF $5.05 66 $333. 30 <br /> Rmv Conc Pavm't SY $1 .45 9471 $13.,732. 95 <br /> Rmv Bit Pavm't SY $1 . 10 321.6 $353. 76 <br /> Rmv Catchbasin EA $75.00 4 $300.00 <br /> Saw Bit Pavm't LF $2. 45 182.5 $447. 13 <br /> Unclass Excav CY $3.95 7699 $30.411.05 <br /> Topsoil Borrow (LV) CY $7.60 388.5 $2,952.60 <br /> Geotextile Fabric SY $0.70 11246 $7.872.20 <br /> Aggr Class 3 TON $4.30 8397.6 $36, 109.68 <br /> Aggr Class 5 TON $5. 15 7446.92 $38,351 .64 <br /> Bit Mtr '1 /Mir. TON $140.00 84.5 $11 ,830.00 <br /> Binder Course TON $8.65 709 $6. 132.85 <br /> Base Course TON $8.60 929. 24 $7,991 .46 <br /> Bit Mtr '1/Mix TON $140. 00 45.3 $6.342.00 <br /> • Wearing Course Mixtur TON $15. 75 809.09 $12,743. 17 <br /> Tack Coat GAL $1 . 20 475 $570. 00 <br /> Granular Bedng CY $8. 10 35.91 $290.87 <br /> 6" Perf Drain Pipe LF $9. 10 136 $1 ,237.60 <br /> 12" RC Pipe LF $35. 35 64 $2,262.40 <br /> Const CB Dsgn N EA $880. 00 4 $3,520.00 <br /> Conc C & G B618 LF $4.05 5213 $21 , 112.65 <br /> Conc C & 6 B624 LF $7.60 20 $152.00 <br /> Conc C & G B6 LF $7.05 $0.00 <br /> Conc Drive Apron CY $135.00 59 $7,965.00 <br /> Bale Check EA $5.95 42 $249.90 <br /> Sodding SY $1 . 50 2075 $3, 112.50 <br /> Pavm't Marking LS $335.00 1 $335.00 <br /> Traffic Control Devic LS $3,000.00 1 $3,000.00 <br /> SUB TOTAL SECTION "A" $237,433. 11 <br />