Laserfiche WebLink
MOO <br /> MEM®ER A.I.A. <br /> January 4, 1988 <br /> Mr. Robert Slick <br /> Slick' s Alternative <br /> 2533 Harding St. NE <br /> St. Anthony Village, MN 55418 <br /> Re: The Alternative Non-Alcoholic Lounge <br /> Apache Plaza <br /> St. Anthony Village, MN <br /> Dear Bob: <br /> Pursuant to our discussions regarding the costs for the mechanical and <br /> electrical construction for the new facility at Apache Mall , the following <br /> cost estimates have been developed with McQuillan Brothers Plumbing and Heating, <br /> St. Paul , MN and Code Electric Company, Bloomington, MIN <br /> A. Mechanical Construction • <br /> � -Provide and install floor drains in toilet rooms as required by <br /> building inspectors. <br /> -Provide and install new floor drains in bar and bar storage areas <br /> and janitor' s room. <br /> �/-Provide and install 50 gallon hot water heater <br /> :✓-Provide and install janitor .slop sink. _ <br /> install . -�- �►^- ��z S. <br /> -Hook-up scullery sink, ice bins, ice machines and coffee makers. <br /> -Pe snits/demolition/clean-up. <br /> Estimated cost ----------511500.00 <br /> .B. Electrical Construction <br /> i/ -Install 200 amp sub panel at stage area. <br /> -Refeed from new 300 amp service panel existing outlets to remain. <br /> -Provide and install outlets in office, lobby, bar, bar storage and <br /> seating/dance areas. <br /> THOMAS H. STAHL, INC. ARCHITECTS 612-881-5610 <br /> 200 WEST 01_D SHAKOPEE ROAD BLOOMINGTON, MINNESOTA 55420 <br />