Laserfiche WebLink
UNITED"" <br /> 520 FRONT AVENUE <br /> SHEET METAL 488-9136 - ST. PAUL, MN 55117 <br /> 9/06/89 <br /> The City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> Mr. Hamer: <br /> Thank-you for your inquiry. Upon inspection of your building <br /> and per your request we quote the following: <br /> Remove the existing two ton A/C unit . <br /> Install a new Carrier three ton unit with a heating section, <br /> controls , ductwork, and gas piping. <br /> Install a new diffuser in the locker room. <br /> Alter existing duct system to fit new three ton unit. <br /> This quotation is complete except for electrical work, <br /> control wiring .and permits. <br /> $4, 780. 00 <br /> Sincerely, <br /> James Parson <br /> President <br /> United Sheet Metal <br /> JP/lm <br /> 0 <br /> COMMERCIAL . AIR CONDITIONING • HEATING VENTILATION INDUSTRIAL <br />