My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01091990
StAnthony
>
City Council
>
City Council Packets
>
1990
>
CC PACKET 01091990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:03:52 PM
Creation date
12/30/2015 8:03:38 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 01091990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> 1 sign would be, but Mr . Brewer was unsure . Chair Madden <br /> 2 asked whether a permit had been taken out for the <br /> 3 monument sign , but Mr. Brewer was unsure . Assistant <br /> 4 VanderHiz--v den told the Commission that F%iblic Workss <br /> 5 Director Larry Hamer was handling the monument sign <br /> 6 issue , a:-_d had informed her that the proposed monument <br /> 7 sign inet the requirements of the sign ordinance . <br /> 3 Commissioner Wagner asked that the Commission be <br /> 9 informed of the size of the monument sign . <br /> 10 <br /> 11 Commissioner Werenicz disputed Mr . Brewer ' s claim that <br /> 12 directional signs would aid police and fire service if <br /> 13 the directional sign is not visible from the north, <br /> 14 stating that most police and fire response originates <br /> 15 from the north . <br /> 16 <br /> 17 Lomniss:_ner m7agn=r pointed out. that ^ne of the <br /> 18 conditicns of granting a certificate of occupancy <br /> 19 variance for Autumn v oods was that an ^merg-ncy entranc--:� <br /> ?0 would be =rovided fro,n the shopping center parking lo*_ <br /> 21 to the - __unn W'aods Copnr, ex, which h;s not et k-=en <br /> 22 accomplished although (,ne of the buildings is occupied . <br /> 23 Commissioner Wagner also suggested that the ideal <br /> 24 location for a directional sign would be at that <br /> • 25 emergency entrance once it is built . Mr. Brewer stated <br /> 26 that at -present a walkway easer:.ent exists , and that the <br /> 27 existing wall was constructed at a time when the <br /> 28 adjacent property owner would not agree to allow Autumn <br /> 29 Woods to build the ramp they hed planned . He stated his <br /> 30 belief that provision has been made instead for a ramp <br /> 31 towards the far end of the wall . He agreed to check on <br /> 32 the stat-Is of that project, stating that Autumn Woods <br /> 33 fully intends to meet the City' s requirements . <br /> 34 <br /> 35 Commissioner Wagner asked Mir . Brewer to describe the <br /> 36 proposed directional signs in more detail . Mr . Brewer <br /> 37 stated that each sign would carry only the addresses of <br /> 38 the units accessed from that point , along with <br /> 39 directions to the rental eenter . <br /> 40 <br /> 41 The public hearing. was closed at 8 : 16 p.m. <br /> 42 <br /> 43 Motion by Hansen, seconded by Brown, to table . <br /> 44 <br /> 45 Commissioner Hansen proposed that the issue be tabled <br /> 46 until more information could be provided concerning the <br /> 47 size of the monument sign and a more exact description <br /> 48 of the proposed directional signs . <br /> 49 <br /> 50 Commissioner Franzese expressed her disagreement , citing <br />
The URL can be used to link to this page
Your browser does not support the video tag.