Laserfiche WebLink
May 25, 1990 <br /> Mr. Larry Hamer <br /> Director of Public Works <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> RE: Feasibility Report <br /> Sanitary'Sewer Diversion <br /> RCM Project No. 10085.00 <br /> .Dear Mr. Hamer: <br /> As per your request in our meeting of May 22, 1990, we are submitting this <br /> Elm proposal to provide a feasibility report for a sanitary sewer diversion at St. <br /> Anthony Road or at 29th Avenue and Wilson Street. This project would <br /> rieke divert flow to Minneapolis. <br /> carroll <br /> muller Our proposed scope of service is to provide a study of this project to <br /> associates, inc. determine if this diversion will produce the desired effect on the downstream <br /> engineers t additional flow in their sanitary sewer.areas and if Minneapolis will acct <br /> 8rcniteCis p p <br /> land surveyors The final feasibility report will include a preliminary design, a detailed cost <br /> equal opportunity estimate and preliminary construction schedule. <br /> employer <br /> We propose to provide work in this proposal at the attached hourly rates not <br /> to exceed $5,000.00. The contact with the City of Minneapolis is the first <br /> order of work for the feasibility study and will be provided at the attached <br /> hourly rates not to exceed $150.00. If the City of Minneapolis will not <br /> consider this request, no further work or payment to RCM will be necessary. <br /> I hope this information meets with your approval and look forward to <br /> working with you on this project. Please contact me if you have any <br /> questions. <br /> Sincerely, <br /> Robcrt .4obcrtstof n, P.E. <br /> RIEKE CARROLL h1ULLER ASSOCIATES, INC. <br /> RCR/na <br /> 10901 red circle drive <br /> box 130 <br /> minnetonka. minnesota 55343 <br /> 612-935-6901 <br />