My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08251992
StAnthony
>
City Council
>
City Council Packets
>
1992
>
CC PACKET 08251992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:18:26 PM
Creation date
12/30/2015 8:18:03 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 08251992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. .CHASN.EY, ASSOCIATES, INC. <br /> „C:ONSULTING ENGINEERS., <br /> 4979 OLSON MEMORIAL HIGHWAY MINNEAPOLIS,MINNESOTA 55422 PHONE 612/546-3355 <br /> August 17, 1992 <br /> Mr. Glenn Gauger <br /> Ulteig Engineers, Inc. <br /> 5201 East River Road <br /> Suite 308 <br /> Minneapolis, MN 55421 <br /> Re: Apache Mall Evaluation <br /> Mechanical Systems <br /> File: L9253COI <br /> Dear Mr. Gauger: <br /> The purpose of this letter is to outline the Mechanical system improvements for the New <br /> Market Building, Sports and Health Club Building, and Mobile Service Station Building at the <br /> Apache Mall Complex. The Mechanical system improvements are separated into two <br /> categories; those required by code and those that we recommend prior to tenant occupancy. <br /> NEW MARKET WELDING- 90,250 SQ FT <br /> Code Requirements: <br /> There are two major code violations that require modification of the existing systems. <br /> 1. Relocate two exhaust fans and one flue. There are two exhaust fans and one flue <br /> within the minimum required 20 foot distance from an outside air intake. <br /> 2. Install eight smoke detectors. Each of eight heating, ventilating, and cooling units <br /> require a smoke detector in the return air stream to shut the fan down upon detection of <br /> smoke. <br /> A new sprinkler system has recently been installed and requires no modifications for code <br /> compliance other than those that may result from specific tenant needs or re-partitioning of the <br /> building. <br /> Mechanical System Improvements: <br /> 1. Replace each of four existing indoor heating, cooling, and ventilating units with new <br /> rooftop units. The existing units were installed with the original building in 1962 and <br /> are near the end of their useful life. The existing units also are not capable of cooling in <br /> an economizer cycle. <br /> J / <br /> f - <br /> A <br />
The URL can be used to link to this page
Your browser does not support the video tag.